DA CIVIL ENGINEERING REPORT & STORMWATER MANAGEMENT PLAN




ENRICH ARCHITECTURE



STP22-0347
Log in to download the original file

STP22-0347 DA Engineering Report RFI Response Rev C.pdf · 9.1 MB (large file)

The download may take up to a minute.

Full text of the other 25 pages

Page 2

                                                                                                    STP CONSULTANTS



Document Verification

 Job Title                      Ozcare Noosa – DA Engineering Report

 STP Project Reference          STP22-0347

 Client Reference               1907NOO


Document Status


                                                                                    Approved for Issue
 Rev.
                        Issue                Project Consultant
 No.
                                                                   Approved by          Signature            Date

                                                                       Ken Miller
 1           First Issue                  STP Consultants                                                11/03/2022
                                                                   RPEQ 09053

                                                                       Ken Miller
 2           FINAL                        STP Consultants                                                08/11/2022
                                                                   RPEQ 09053

                                                                       Ken Miller
 3           REVISION A                   STP Consultants                                                24/11/2022
                                                                   RPEQ 09053

                                                                       Ken Miller
 4           REVISION B                   STP Consultants                                                23/03/2023
                                                                   RPEQ 09053

                                                                       Ken Miller
 5           REVISION C                   STP Consultants                                                03/05/2023
                                                                   RPEQ 09053

Page 3

                                                                                                                                               STP CONSULTANTS




Contents
1.     Introduction ........................................................................................................................................................3
2.     Site Description ..................................................................................................................................................3
     2.1      Easements..................................................................................................................................................3
     2.2      Proposed Development .............................................................................................................................4
3.     Stormwater Management Plan .........................................................................................................................5
     3.1      Flood Studies..............................................................................................................................................5
     3.2      Stormwater Detention................................................................................................................................5
     3.3      Stormwater Quality ....................................................................................................................................5
     3.4      Existing Stormwater Infrastructure...........................................................................................................5
     3.5      Site Stormwater Drainage .........................................................................................................................5
     3.6      Site Earthworks ..........................................................................................................................................5
4.     Water Supply and Sewerage............................................................................................................................10
     4.1      Water Connection ....................................................................................................................................10
     4.2      Sewer Connection....................................................................................................................................10
5.     Roadworks and Traffic Impact........................................................................................................................11
     5.1      Parking and Access .................................................................................................................................11
     5.2      Proposed Fire track & Construction Access ..........................................................................................11
6.     Conclusions ......................................................................................................................................................11
7.     Appendix A – Schematic Layouts ...................................................................................................................12
8.     Appendix B – Typical Access Track Crossing................................................................................................17
9.     Appendix C – Stormwater Quality Management Plan ...................................................................................20
     9.1      Pollutants of Concern..............................................................................................................................21
     9.2      Design Objectives for Water Management ............................................................................................21
     9.3      Proposed Stormwater Treatment Train Analysis ..................................................................................22
     9.4      Music Modelling.......................................................................................................................................22
              Model Parameters....................................................................................................................................22
              Rainfall & Runoff Parameters ..................................................................................................................23
              Pollutant Generation ................................................................................................................................23
              Results ......................................................................................................................................................23




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                                                                           2

Page 4

                                                                                                       STP CONSULTANTS



1.      Introduction
        Enrich Architecture has engaged STP Consultants to produce a Development Assessment Report for Engineering
        Services, in support of an application for Material Change of Use over the site for an extension to an existing Aged
        Care Facility. This report has been revised in partial response to Noosa Shire Council’s Further Advice Notice issued
        on 25 January 2023, in particular, Items 4, 8, 9, 10, 11, 12 and 14.

        This report will provide additional detail in the following areas:

                 Site earthworks
                 Stormwater management and flood risk
                 Stormwater quality
                 Water supply
                 Sewerage reticulation
                 Preliminary traffic impact


2.      Site Description
        The site is located at 100 Cooyar Street, Noosa Heads and described as Lot 9 on RP225312 with a land area of
        2.5ha. The site is zoned Community Facilities under the Noosa Shire Council City Plan and is currently used as an
        Aged Care Facility.




        Figure 2.1 – Zoning and Locality Plan (NSC Mapping)


2.1      EASEMENTS
        There is a single access easement A on SP197575, for an electrical sub-station, as shown in Figure 2.1 below.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                           3

Page 5

                                                                                                                      STP CONSULTANTS




                                         Emt A SP1975
                                                     75




        Figure 2.2 – Existing access easements (Qld Globe)


2.2      PROPOSED DEVELOPMENT
        The proposed development consists of demolition and reconstruction of accommodation wings, administration
        building, and a community centre as depicted in Figure 2.3 below.




         REFUSE COLLECTION &
         GAS BOTTLE AREA
         REFER TURNING PATHS




                                                                                         EXISTING TRACK CROSSING
                                                                                         STORMWATER OUTLET




        SERVICE DELIVERY AREA
        REFER TURNING PATHS




                                                                                                                   ADDITIONAL TRACK CROSSING
                                                                                                                   STORMWATER OUTLET




        Figure 2.3 – Proposed site layout Stages 1, 2, 3A and 3B (Enrich Architecture)




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                                                  4

Page 6

                                                                                                       STP CONSULTANTS



3.      Stormwater Management Plan
3.1      FLOOD STUDIES
        According to the Noosa Shire Council Flood Study, the site is not subject to flood inundation at the AEP 1% level.

3.2      STORMWATER DETENTION
        Comparison of the impervious areas between the existing layout and the ultimate layout following completion of
        Stage 3B, shows an overall increase from 12,370m2 (IF = 0.4952) to 12,374m2 (IF = 0.4954) or 0.03%. This change
        is considered to be negligible and will not result in a measurable increase in site runoff. As this is the case, there
        will be no requirement for on-site detention for the proposed development.

3.3      STORMWATER QUALITY
        In accordance with the Assessment Benchmarks outlined in State Planning Policy, a Stormwater Quality
        Management Plan will be required in order to reduce the impact of the proposed development on the quality of
        stormwater discharged from the site. The site area is greater than 2,500m2 and the proposed development will
        result in the net developed area being greater than 25%. A stand-alone Stormwater Quality Management Plan,
        analysing the effect of the newly developed areas only, is included in Appendix C to this report.

3.4      EXISTING STORMWATER INFRASTRUCTURE
        The site currently drains to the wetlands to the north-east, which is the Lawful Point of Discharge as illustrated in
        the site survey in Figures 3.1 and 3.2 below.

3.5      SITE STORMWATER DRAINAGE
        A preliminary stormwater drainage layout is illustrated in Figures 3.3 and 3.4. For the main development area, the
        roofwater will discharge either directly to ground via splash pads or to roofwater inlet pits. The roofwater outlets
        and the landscaped areas are to discharge directly to the open swales which will then outlet to the eastern reserve
        area via the two proposed causeway structures.

        Rock causeways are proposed where the stormwater drainage outlets from the site at the two locations indicated
        in Figure 3.3. Detailed design drawings are included in Appendix B to this report. Catchment areas and runoff
        calculations for the two major catchments are included in Figure 3.5 and Table 3.1 below.

        The northern maintenance area (Figure 3.4) is a partial demolition and extension of the existing paved area, with a
        consequent increase in impervious fraction for the area. Of the existing 249m2 impervious area, 73m2 is to be
        demolished and be revegetated, with 176m2 to be retained. The area is to be extended with an additional 182m2 of
        impervious pavement. The net impervious pavement area increases from 236m2 to 329m2. It is proposed to
        discharge runoff from this area to a gravel soakage pit on the eastern boundary.

3.6      SITE EARTHWORKS
        Existing site levels and grades are generally to be maintained. A minimal volume of fill may be required for building
        pad works within strip footings. Minor excavation will be necessary for the creation of drainage swales and the
        external fire track. A preliminary earthworks layout is shown in Figure 3.6.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                            5

Page 7

                                                                                STP CONSULTANTS




        Figure 3.1 – Existing infrastructure - north (Bennett & Bennett)




        Figure 3.2 – Existing infrastructure - south (Bennett & Bennett)


Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                6

Page 8

                                                                                                        STP CONSULTANTS




        Figure 3.3 – Proposed stormwater schematic layout (STP). Refer Appendix A.




        Figure 3.4 – Proposed stormwater schematic layout - Maintenance area (STP). Refer Appendix A.



Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                        7

Page 9

                                                                                                       STP CONSULTANTS




                                                             C-01




                                                                                                  C-
                                                                                                    02




        Figure 3.5 – Major stormwater catchment areas.

        Time of Concentration = Roof travel time (4.6.5) + Channel flow (4.6.10)
                   Tc (C-01) =               5        +                 5        =       10 min
                   Tc (C-02) =               5        +                 10       =       15 min




        Table 3.1 – Catchment runoff calculations


        The proposed grassed swale will generally consist of a 5m wide section with a 1m base and side batters at 1:8 for
        a maximum depth of 250mm. At a minimum grade of 0.25% (1 in 400), the swale will have a capacity of 0.422m3/s
        at a maximum velocity of 0.56m/s.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                       8

Page 10

                                                                                                    STP CONSULTANTS



         The rear access track will consist of a 5.0m wide gravel formation of 200mm crushed rock base over a trimmed
         and compacted subgrade. The profile will consist of a 4% one-way crossfall, 4.0m wide with 0.5m shoulders,
         designed to be free-draining. The two crossing points will be constructed as rock causeways for unobstructed
         overland flow. Typical details are included in Appendix B.

         Manning’s trapezoidal channel calculations are shown below, indicating a rock size in the range 30-50mm for the
         calculated maximum velocity of 0.79m/s at the AEP 1% event.




        Figure 3.6 – Proposed earthworks and fire track schematic layout (STP). Refer Appendix A.


Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                      9

Page 11

                                                                                                          STP CONSULTANTS



4.      Water Supply and Sewerage
4.1      WATER CONNECTION
         The new buildings will connect into the existing internal reticulation as illustrated in Figures 3.1 and 3.2 above. All
         new and amended fixtures will be subject to a Plumbing and Drainage Application to Noosa Shire Council. It is
         unlikely that the existing connection to the Unitywater infrastructure will require upgrading. This is located to the
         north of the main entrance in Cooyar Road and fed by a crossing from the 150mm main located on the opposite
         side.

4.2      SEWER CONNECTION
         The new buildings will connect into the existing internal reticulation as illustrated in Figures 3.1 and 3.2 above. All
         new and amended fixtures will be subject to a Plumbing and Drainage Application to Noosa Shire Council. It is
         unlikely that the existing connection to the Unitywater infrastructure will require upgrading.

         As illustrated in Figure 4.1, the site is traversed by existing Unitywater sewer infrastructure. Any construction within
         5m of this 300mm trunk main will require approval from Unitywater under Queensland Development Code MP1.4.




        Figure 4.1 – Existing sewer infrastructure (Unitywater)




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                               10

Page 12

                                                                                                    STP CONSULTANTS



5.      Roadworks and Traffic Impact
5.1      PARKING AND ACCESS
         The access to the site will remain mostly unchanged as a result of this development. As there is no change to the
         number of beds proposed, there is no additional demand for parking or impact on external traffic. Additional
         parking and manoeuvring areas are proposed however, to provide better amenity and accessibility for current staff
         and visitors. The turning paths shown below, indicate that sufficient area is available for all proposed vehicles
         using the site.




        Figure 5.1 – Refuse area and delivery area vehicle manoeuvres (Refer Appendix A).


5.2      PROPOSED FIRE TRACK & CONSTRUCTION ACCESS
         The rear access track will be upgraded to a 5.0m wide gravel formation of 200mm crushed rock base over a
         trimmed and compacted subgrade. The profile will consist of a 4% one-way crossfall (4.0m carriageway width
         with 0.5m shoulders) designed to shed runoff without concentration of flow. The two crossing points will be
         constructed as rock causeways. This will provide permanent access for fire monitoring purposes as well as
         suitable access for construction vehicles. Typical details are included in Appendix B.




6.      Conclusions
         The proposed development is in complete compliance with Development Codes 9.3.4 Special Residential Code
         and 9.4 Works Code.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                        11

Page 13

                                                                                STP CONSULTANTS



7.      Appendix A – Schematic Layouts




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                12

Page 14

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   13

Page 15

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   14

Page 16

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   15

Page 17

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   16

Page 18

                                                                                STP CONSULTANTS




8.      Appendix B – Typical Access Track Crossing




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                17

Page 19

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   18

Page 20

                                                                                     STP CONSULTANTS




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347   19

Page 21

                                                                                STP CONSULTANTS




9.      Appendix C – Stormwater Quality Management Plan




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                20

Page 22

                                                                                                             STP CONSULTANTS



9.1      POLLUTANTS OF CONCERN
         The South-East Queensland Stormwater Quality Guidelines provide guidance on the types of pollutants likely to be
         generated from different developments. The Water Quality Objectives for Noosa are listed in Table 9.2. The
         pollutants most likely to be of concern for Residential and Commercial developments are identified in Table 9.1
         below.

                                                                                     Development Phase
                                        Pollutant
                                                                                Construction      Operation

            Litter                                                                                      

            Sediment                                                                              unlikely

            Hydrocarbons (including oil and grease)                                                     

            Toxic materials (e.g. cement slurry, asphalt primer, solvents)                        unlikely

            pH altering substances (e.g. cement slurry and wash waters)                           unlikely

            Oxygen demanding substances (organic and chemical matter)             possibly         unlikely

            Nutrients (nitrogen and phosphorus)                                                         

            Pathogens / Faecal coliforms (bacteria and viruses)                   possibly         unlikely

            Heavy metals (often associated with fine sediment                     unlikely         unlikely

            Surfactants (e.g. detergents from car washing)                        unlikely         possibly

            Thermal pollution (heat)                                              unlikely         unlikely

            Table 9.1 – Pollutants Likely to be of Most Concern


9.2      DESIGN OBJECTIVES FOR WATER MANAGEMENT
         The Environmental Protection (Water) Policy 1997 provides a framework for identifying environmental values and
         associated water quality objectives; this framework is consistent with the efficient use of resources and best
         practice environmental management and involves the community through consultation and consideration of
         economic and social impact assessment. Environmental Values (EV) are a reflection of the qualities of a
         catchment that the community believes to be important. As such, environmental values are established through
         community consultation rather than through a scientific process. Once EV are established for a catchment, Water
         Quality Objectives (WQO) can be defined, which are meant to protect these values.

         While load based reduction targets focus on performance of a stormwater quality management system within the
         urban footprint, concentration based WQO’s are concerned with median flow concentrations as they enter
         downstream receiving water.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                             21

Page 23

                                                                                                                  STP CONSULTANTS




                                                                        Load Based                  Water Quality Objectives
                       Parameter                   Statistic
                                                                         Reduction

             Total Suspended Solids (TSS)        Mean Range                 80%                         Less than 5mg/L

                Total Phosphorous (TP)           Mean Range                 60%                   Less than 0.01 to 0.05mg/L

                  Total Nitrogen (TN)            Mean Range                 45%                    Less than 0.2 to 0.5mg/L

                           PH                    Mean Range                   -                         Between 7 and 8

                                                                                               Greater than 80% saturation during
                   Dissolved Oxygen                  Mean                     -
                                                                                                            daytime

                                                                                              Retention of litter greater than 50mm
                    Gross Pollutants                   -                    90%               for flows up to the 3-month ARI peak
                                                                                                                flow

                                                                                            Retention of sediment coarser than
                   Coarse sediment                     -                      -            0.125mm for peak flows up to the ARI
                                                                                                    3-month peak flow

            Table 9.2 – Water Quality Objectives for South-East Queensland


9.3      PROPOSED STORMWATER TREATMENT TRAIN ANALYSIS
         The proposed development site has sufficient area available to dedicate to stormwater treatment devices. Roof
         water will discharge via downpipes directly to the in-ground stormwater. The landscaped areas and pavements
         will discharge directly to field inlet pits or to overland flow. All grated field inlets will be fitted with filter baskets for
         removal of gross pollutants. Treatment is undertaken within the grassed swales which then discharge to the
         existing Lawful Points of Discharge to the north and east of the site.

9.4      MUSIC MODELLING

        MODEL PARAMETERS

                                   Input                                          Data Used

             Rainfall Station                                  40059 COOROY COMPOSITE

             Rainfall Period                                   01/01/1973 – 31/12/1983

             Mean Annual Rainfall (mm)                         1600mm

             Evapotranspiration                                1629mm

             Model Timestep                                    6 minutes

             Rainfall Runoff Parameters*                       Commercial

             Pollutant Parameters*                             Commercial (Split)

             Table 9.3 – Basic MUSIC Model Parameters




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                                         22

Page 24

                                                                                                           STP CONSULTANTS



        RAINFALL & RUNOFF PARAMETERS

                              Parameter                             Roof/ Road/Ground Level

                     Rainfall Threshold (mm/day)                                1

                      Soil Storage Capacity (mm)                              18

                  Soil Initial Storage (% of Capacity)                        10

                         Field Capacity (mm)                                  80

                  Infiltration Capacity coefficient - a                      243

                  Infiltration Capacity exponent - b                          0.6

                          Initial Depth (mm)                                  50

                       Daily Recharge Rate (%)                                  0

                       Daily Baseflow Rate (%)                                31

                     Daily Deep Seepage Rate (%)                                0

           Table 9.4 – Water by Design MUSIC Quantity Parameters for South-East Queensland (Commercial)

        POLLUTANT GENERATION
         In MUSIC, stormwater quality is characterized by event mean concentrations (EMC) for storm flows and base
         flows. In this study, the EMC were adopted from the Water by Design MUSIC Modelling Guidelines. The
         pollutants of concern that were assessed include total suspended solids (TSS), total phosphorous (TP) and
         total nitrogen (TN). The quality of stormwater runoff is characterised by inputting event mean concentrations
         (EMC) for storm flow and base flow conditions as well as the standard deviation of each EMC.

         Pollutant concentrations are based on Commercial land use parameters.

                                                    TSS (log10 values)              TP (log10 values)       TN (log10 values)
           Flow Type       Surface Type
                                                  Mean          Std Dev.        Mean            Std Dev.   Mean         Std Dev.


          Baseflow        Roof                     0.00           0.00          0.00              0.00     0.00           0.00

                          Roads                    0.78           0.39          -0.60             0.50     0.32           0.30

                          Ground level             0.78           0.39          -0.60             0.50     0.32           0.30

          Stormflow       Roof                     1.30           0.38          -0.89             0.34     0.37           0.34

                          Roads                    2.43           0.38          -0.30             0.34     0.37           0.34

                          Ground level             2.16           0.38          -0.39             0.34     0.37           0.34

          Table 4.5 – Water by Design MUSIC Modelling Parameters - Commercial Split Catchment (SEQ)

        RESULTS
         The indicative layout of the MUSIC model and results are shown below in Figure 9.1 and Table 9.6.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                                               23

Page 25

                                                                                           STP CONSULTANTS




           Figure 9.1 – MUSIC Model Treatment Train




         Table 9.6 – MUSIC Modelling Results

         As demonstrated, the proposed treatment train will reduce pollutant loadings to the extent specified
         by the Noosa Shire Council Stormwater Quality Guidelines with the exception of Total Phosphorus
         which achieves 97% of the target.




Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347                              24

Page 26

BRISBANE
Level 3, 451 St Pauls Terrace
Fortitude Valley QLD 4006
P. 07 3539 8300
E. [email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]



TOWNSVILLE
Level 3, 382 Sturt Street
Townsville QLD 4810
PO Box 1777
Townsville QLD 4810
P. 07 3539 8350
E. [email protected]
[email protected]
[email protected]
[email protected]



CAIRNS
Suite 2, 111 Spence Street
Cairns City QLD 4870
PO Box 71
Bungalow QLD 4870
P. 07 3539 8380
E. [email protected]



MACKAY
Level 2, 56 Gordon Street
Mackay QLD 4740
PO Box 583
Mackay QLD 4740
P. 07 3539 8390
E. [email protected]


ROCKHAMPTON
Level 3, 36 East Street
Rockhampton QLD 4700
P. 07 3539 8344
E. [email protected]



WHITSUNDAYS
230 Shute Harbour Road
Cannonvale QLD 4802
P. 07 3539 8399
E. [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.