STP22-0347 DA Engineering Report RFI Response Rev C
STP CONSULTANTS
Load Based Water Quality Objectives
Parameter Statistic
Reduction
Total Suspended Solids (TSS) Mean Range 80% Less than 5mg/L
Total Phosphorous (TP) Mean Range 60% Less than 0.01 to 0.05mg/L
Total Nitrogen (TN) Mean Range 45% Less than 0.2 to 0.5mg/L
PH Mean Range - Between 7 and 8
Greater than 80% saturation during
Dissolved Oxygen Mean -
daytime
Retention of litter greater than 50mm
Gross Pollutants - 90% for flows up to the 3-month ARI peak
flow
Retention of sediment coarser than
Coarse sediment - - 0.125mm for peak flows up to the ARI
3-month peak flow
Table 9.2 – Water Quality Objectives for South-East Queensland
9.3 PROPOSED STORMWATER TREATMENT TRAIN ANALYSIS
The proposed development site has sufficient area available to dedicate to stormwater treatment devices. Roof
water will discharge via downpipes directly to the in-ground stormwater. The landscaped areas and pavements
will discharge directly to field inlet pits or to overland flow. All grated field inlets will be fitted with filter baskets for
removal of gross pollutants. Treatment is undertaken within the grassed swales which then discharge to the
existing Lawful Points of Discharge to the north and east of the site.
9.4 MUSIC MODELLING
MODEL PARAMETERS
Input Data Used
Rainfall Station 40059 COOROY COMPOSITE
Rainfall Period 01/01/1973 – 31/12/1983
Mean Annual Rainfall (mm) 1600mm
Evapotranspiration 1629mm
Model Timestep 6 minutes
Rainfall Runoff Parameters* Commercial
Pollutant Parameters* Commercial (Split)
Table 9.3 – Basic MUSIC Model Parameters
Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.