Original source · versioned page text
STP22-0347 DA Engineering Report RFI Response Rev C
STP CONSULTANTS
Figure 9.1 – MUSIC Model Treatment Train
Table 9.6 – MUSIC Modelling Results
As demonstrated, the proposed treatment train will reduce pollutant loadings to the extent specified
by the Noosa Shire Council Stormwater Quality Guidelines with the exception of Total Phosphorus
which achieves 97% of the target.
Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347 24