STP22-0347 DA Engineering Report RFI Response Rev C
STP CONSULTANTS
Emt A SP1975
75
Figure 2.2 – Existing access easements (Qld Globe)
2.2 PROPOSED DEVELOPMENT
The proposed development consists of demolition and reconstruction of accommodation wings, administration
building, and a community centre as depicted in Figure 2.3 below.
REFUSE COLLECTION &
GAS BOTTLE AREA
REFER TURNING PATHS
EXISTING TRACK CROSSING
STORMWATER OUTLET
SERVICE DELIVERY AREA
REFER TURNING PATHS
ADDITIONAL TRACK CROSSING
STORMWATER OUTLET
Figure 2.3 – Proposed site layout Stages 1, 2, 3A and 3B (Enrich Architecture)
Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347 4