STP22-0347 DA Engineering Report RFI Response Rev C
STP CONSULTANTS
C-01
C-
02
Figure 3.5 – Major stormwater catchment areas.
Time of Concentration = Roof travel time (4.6.5) + Channel flow (4.6.10)
Tc (C-01) = 5 + 5 = 10 min
Tc (C-02) = 5 + 10 = 15 min
Table 3.1 – Catchment runoff calculations
The proposed grassed swale will generally consist of a 5m wide section with a 1m base and side batters at 1:8 for
a maximum depth of 250mm. At a minimum grade of 0.25% (1 in 400), the swale will have a capacity of 0.422m3/s
at a maximum velocity of 0.56m/s.
Civil Engineering Report & Site Based Stormwater Management Plan | STP22-0347 8