Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2021-10-12 Planning & Environment Committee Meeting Agenda

of 185

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                              12 OCTOBER 2021


3.2     State and Other Statutory Instruments
State Planning Policy
The Noosa Plan 2006 is generally consistent with the State Planning Policy July 2017 (SPP) except
for Bushfire. The applicant has provided a Bushfire Hazard Assessment and Management Plan
against The Noosa Plan 2006 and the relevant parts of the State Planning Policy (SPP).
The applicant’s Bushfire Assessment provided recommendations to comply with the SPP, one of
which is a 20m wide access easement for firefighting purposes. The 20m wide easement must
consist of a minimum 4m wide driveway, a 3m wide ‘working area’ on each side of the driveway and
the balance 10m area to be managed to avoid any compromising vegetation (surface hazards).
While the applicant could provide this easement width, the easement is traversing a riparian buffer
and as such requires vegetation removal and compromises the integrity of the riparian and any
possible regeneration work.
This is discussed further in section 3.3 of this report.
South East Queensland (SEQ) Regional Plan
The site is located within the Rural Living Area of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The site is identified as a Koala Priority Area and contains Koala habitat. Under the Planning
Regulations, the proposed development is prohibited and an application cannot be accepted by
Council unless the clearing associated with the proposal is exempted development.
The applicant has provided confirmation from State Development, Infrastructure, Local Government
and Planning that the plan of subdivision is not ‘prohibited’ development under Schedule 24, due to
the proposed clearing being for a lot boundary. Figure 4 below shows the Koala habitat mapped by
the state in green.




      Figure 4 – Koala habitat in green. The proposal results in clearing of koala habitat for the new boundary.

3.3     Statutory Instruments – Planning Scheme
The application must be assessed against each of the following codes to the extent they are relevant
to the development:

                                                                                                Page 159 of 185
Log in to download the original file

2021-10-12 Planning & Environment Committee Meeting Agenda(PDF, 13MB).pdf · 14.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.