Original source · versioned page text
Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5
5 Traffic Impact Assessment
5.1 Existing Site Traffic Generation
To gain an understanding of the traffic which could have been generated by the site’s approved use, an
18-hole golf course, reference has been made to trip generation rates within the Institute of Transportation
Engineers (ITEs) ‘Common Trip Generation Manual’ 10th Edition.
The recommended trip generation rate for a golf course is 0.28 trips / acre. On the basis of a 67 acre golf
course (estimated), the anticipated peak hour trip generation would be in the order of 19 trips.
As public use of this facility will cease, this traffic will no longer be generated.
5.2 Anticipated Site Traffic Generation
Introduction
The following summarises the information contained in Section 3 of this report in relation to the traffic
generation anticipated for the development.
School Term
The school term use includes school camps with all attendees arriving by bus during weekdays, two
sessions per week, with weekend use of up to 299 beds for external groups. The anticipated daily trip
generation, as per Section 3 of this report is:
Wednesday: 76 car trips / 28 bus trips (camp changeover day).
Friday: 192 car trips / 14 bus trips (7 buses arrival and departure).
Sunday: 116 car trips.
School Holiday Use
The school holiday use includes 5-day camps, with weekend use of up to 299 beds for external groups. The
anticipated daily trip generation, as per Section 3 of this report is:
Monday: 236 car trips / 8 bus trips.
Friday: 352 car trips / 8 bus trips .
Sunday: 116 car trips.
www.bmctraffic.com.au 12
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.