Original source · versioned page text
Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5
The traffic volume data at the intersection identified that the peak hour within the survey time period was:
11:45am – 12:45pm on Wednesday 15 February 2023.
4:15pm – 5:15pm on Friday 17 February 2023.
11:15am – 12:15pm on Sunday 19 February 2023.
The site peak hour is however expected to be later on the Friday (6:00pm – 7:00pm) and the 6:00pm –
7:00pm data has been used for this assessment. The assessed peak hour existing traffic volumes are shown
in Figure 3 – 5.
Figure 3: Wednesday 11:45am – 12:45pm
www.bmctraffic.com.au 14
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.