Original source · versioned page text
Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5
5.4 Kabi Road Carriageway: Development Impacts To estimate the likely two-day traffic volume on Kabi Road with the addition of development traffic, the daily traffic volume forecast from Section 3 of this report has been added to the recorded existing two-way traffic volumes (average). The anticipated two-way traffic flow on Kabi Road following completion of the development is provided in Table 4. Table 4: Summary of Kabi Road Daily Two-Way Traffic Volume Estimates: Vehicles Per Day Assuming full occupation of the camp at all times, the peak forecast two-way traffic volume on Kabi Road is 403 vehicles per day. The forecast daily volume ranges from 73 vehicles per day, with an average 167 vehicles per day. In considering the requirements for the roadway in Kabi Road, reference has been made to the AUSTROADS document Guide to Road Design Part 3: Geometric Design which at Table 4.5 includes information on single carriageway widths on rural roads. This is reproduced at Table 5, below. Table 5: Reproduction of Table 4.5 from AUSTROADS Part 3 As can be seen from the above Table, for a forecast maximum two-way traffic flow of 403 vehicles per day, the recommended carriageway width is 6.2m. www.bmctraffic.com.au 16 BMC22089: 59 Kabi Road, Cootharaba 22 March 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.