Skip to the record
Search everything, all in one place.

Original source · versioned page text

Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Job No.         : AUQLD5939
Client          : BMC Traffic
Suburb          : Cootharaba
Location        : 1. Cootharaba Rd / Kabi Rd


Day/Date        : Fri, 17th Feb 2023
Weather         : Fine
Description     : Classified Intersection Count
                : Intersection Diagram
                                                                               Cootharaba Rd
Hour Starting            Vehicle Type
                                                   Total                                                                     Total
                                                  Northbd                                                                   Southbd

                                                    24      Selected                      0                     13     0      13
                                                   24%      Hour & Vehicle Type           0%                    100%   0%    21%
                                                                                                                                              N
                                                    44                         (Vol)      0                     34     0      34
                                                                     Peak
                                                   44%                         (%)        0%                    100%   0%    55%




                                                                                                                                       1          1    Total
                                                                                          9U                     8     7              25%     25%     Eastbd




                                                                                                                                      Peak

                                                                                                                                      (Vol)
                                                                                                                                      (%)
                                                                   Peak Hour      16:15          to     17:15




                                                                                                                                                               Kabi Rd
                                                                                                                              6U       0          0
                                                                                                                                       0%     0%

                                                                                                                              6        1          0
                                                                                                                                      100%    0%




                                                                                                                              4        0          1
                                                                                                                                       0%     100%

                                                              2        3          3U                                                   1          1    Total
                                                                                                                                      50%     50%     Westbd




                                                    44        43       1          0                   (Vol)                   34
                                                                                          Peak
                                                   43%       98%      2%          0%                  (%)                    54%


                                                    25        24       1          0                                           14
                                                   25%       96%      4%          0%                                         22%

                                                   Total                                                                     Total
                                                  Northbd                                                                   Southbd


                                                                               Cootharaba Rd
Log in to download the original file

Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5.pdf · 6.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.