Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2.4        Clarification on Use
It has been advised that the initial assumption that the facility would primarily be utilised for school camps
within the school term does not reflect the current intention for the site operations. It is proposed that, to
maximise the site’s potential, the proposed facilities will be available as follows:
        School camps:               as per the initial traffic report.
        Weekend groups:             hired to various sporting / community groups, up to full 299 beds.
        School holiday use:         use of the full facility for youth camps over the school holidays, typically
                                     accommodating week-long camps.




www.bmctraffic.com.au                                                                                               5
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Referecence Document Traffic Engineering Assessment Report 22 March 2023 131998.98121.5.pdf · 6.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.