Original source · versioned page text
2022-11-04 Special Meeting - Agenda Item 1 - Attachment 1 - Housing Strategy
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
5.2 Outcome – Sufficient housing is provided to accommodate the planned population of the Shire.
T
Actions Timing Council role
A6.2.1 Ensure additional housing meets the SEQ Regional Plan dwelling targets set by the State by- Ongoing Advocate/
• Continuing discussions with State government and utility providers about dwelling Planner
capacity. Regulator
AF
• Engaging with the State Government on the SEQ Regional Plan review.
• Ensuring appropriate land is zoned for housing development and reviewing the optimum
density or capacity of land already zoned for housing.
• Incentivising the optimum use of the developable land that remains so that a greater
number of smaller dwellings are delivered, rather than high end low density
• Ensuring new housing capacity is located in defined urban boundaries rather than outward
expansion, with associated efficiencies in infrastructure and service provision
A6.2.2 Determine the true extent of the problem - Who needs housing and what kind of housing January 2023
do they need? Then develop a Housing Monitoring program that has clear targets for and ongoing Monitor
achieving a minimum supply of social housing, affordable housing, small dwellings and
accessible housing over the next 5 years considering the number of applications currently on
R
the social housing register and the number of people experiencing housing stress. Report
the Housing Monitoring Program every two years. This may include a subscription to an
outsourced monitoring program.
A6.2.3 Seek to encourage housing specifically suitable for workers close to places of work, having
consideration to changes in employment trends moving forward. Work with Community Ongoing Advocate/
D
Housing providers and developers/builders. Planner
Regulator
A6.2.4 Develop programs to encourage more efficient use of existing housing stock through
2022 and
means of sharing houses and encouraging secondary dwellings. Implement or support a
Ongoing Advocate/
program to accommodate key workers. Work with Industry on these programs.
Partner
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.