Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU21/0110 - APPLICATION FOR MATERIAL CHANGE OF USE - BAR, FOOD, AND DRINK OUTLET, OUTDOOR SPORT AND RECREATION, RESORT COMPLEX AT 61 NOOSA SPRINGS DRIVE, NOOSA HEADS (Referred from Planning & Environment Committee Meeting dated 11 July 2023 - Item 5.1) · ATTACHMENT 1 - MCU21 0110 - PROPOSED CONDITIONS

of 11

Page text shows just the words. Original shows the document exactly as it was published.

      c.    re-use of harvested stormwater for non-potable outdoor uses including irrigation
            of landscaped areas and swimming pool top-up
56.   Certification must be submitted to Council from a qualified person which certifies that
      the stormwater harvesting tanks and associated reticulation has been installed in
      accordance with the requirements of this Decision Notice.
      Acid Sulfate Soils
57.   An Acid Sulfate Soil Management Plan must be prepared and submitted with the
      Operational Works application for the site. The acid sulfate management plan must
      include testing, monitoring and treatment requirements for the works.
      Services
58.   Unless otherwise stipulated by telecommunications legislation at the time of
      construction, the development must be provided with all necessary conduits, pits and
      pipes to accommodate the future connection of optic fibre technology
      telecommunications.
59.   Certification must be submitted to Council from all relevant service providers (Energex,
      NBN and Unitywater which certifies that the development has met the requirements of
      this Decision Notice and all applicable legislation at the time of construction.
      Easements
60.   Unless otherwise agreed in writing by the relevant service provider, any public or third
      party infrastructure located on the subject site must be placed within an easement
      registered against the title of the property.
61.   All easements must be designed in accordance with the planning scheme and granted
      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
      easement documentation must be in accordance with the Grantee’s standard
      easement terms. Draft easement documentation must be submitted to Council for
      endorsement.
62.   All works must be kept clear of any existing or proposed easements on the subject
      land, unless agreed otherwise in writing by the Grantee.
      Earthworks and Retaining Walls
63.   All excavation, fill, soil retaining structures and associated batters must be undertaken
      in accordance with an Operational Works approval and contained entirely within the
      subject site unless written permission from the respective landowner(s) is provided to
      Council.
64.   All retaining walls must be designed and constructed in accordance with the planning
      scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
      retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
      with a commercial grade safety fence.
      Damage to Services and Assets
65.   Any damage caused to existing services and assets as a result of the development
      works must be repaired at no cost to the asset owner at the following times:
      a.    where the damage would cause a hazard to pedestrian or vehicle safety,
            immediately; or
      b.    where otherwise, upon completion of the works associated with the development.
      Any repair work which proposes to alter the alignment or level of existing services and
      assets must first be referred to the relevant service authority for approval.
Log in to download the original file

ATTACHMENT 1 - MCU21 0110 - PROPOSED CONDITIONS.pdf · 109 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.