Att 1 - Landscape Architects letter · OPW19/0266.03

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                                                                  ANDREW GOLD
                                                                                  LANDSCAPE ARCHITECTURE


                                                                                  PO BOX 5220, Mt Gravatt East QLD
                                                                                  4122
                                                                                  T   07 3420 0006
                                                                                  M 0405 389 243
                                                                                  W agla.com.au


    13 Oct 2023



Noosa Council
Sam Osakwe
Development Planner
Development and Regulation
PO Box 141
Tewantin QLD 4565



Email:         Sam Osakwe <[email protected]>



RE: Landscape Operational Works Change application - synthetic turf
215 David Low Way, Peregian Beach

Dear Sam,



The following has been requested in response to the Operational Works change application as per our
site meeting:



●     Revisions to the plans to include the locations of the artificial turf and where soft landscaping is
      retained,
●     Percentage of the landscape area converted to artificial turf,
●     Justification(s) on the need to replace the soft landscaping with the artificial turf,
●     Management of the artificial turf, including expected life span and waste management at the end
      of life, and
●     Address the micro plastic concerns with proposed filtration methods and how it is separated from
      stormwater.



Please find below our responses to the issues raised by Council.



Revisions to the plans to include the locations of the artificial turf and where soft landscaping is
retained:

Please refer to the as-constructed landscape plans (issue O) for the synthetic turf location and these
have been clouded on the Overall Landscape Plan and Surface Finishes Plans for ease of reference.
Full text of the other 2 pages

Page 2

Percentage of the landscape area converted to artificial turf:

Of the landscape areas totaling 2955m2, only 13.4% is proposed as synthetic turf.



Justification(s) on the need to replace the soft landscaping with the artificial turf:

Inability to grow in these areas due to lack of sunlight and sustainability of natural turf is not viable.
Sunlight remains a significant issue for its ongoing survival, along with wear, rejuvenation and self
repair of natural turf will be severely limited.

There is a requirement for these areas to be ‘usable backyard space’. A robust surface treatment was
required; gravel was deemed too hard, contrary to the landscape requirements, and poor surface
treatment for recreation. Shade tolerant trafficable groundcovers would wear quickly.

The subject development consists of short-stay accommodation with guests coming and going on a
regular basis, and to maintain struggling areas of turf (by the caretaker) would be not achievable,
would be highly disruptive and contrary to the peaceful enjoyment of guests.

Limited access and unable to get a mower down the side access of many of the houses, as the
design team have sought to prioritize landscape treatment over maintenance pathways

The design team was not adverse to providing natural turf and have provided it wherever it was
possible for it to thrive and survive, along with maintenance access.

Synthetic turf is permeable to rainwater similar to natural turf, thus ensuring that adjacent mass
planting areas including trees roots would have access to the same subsurface water available with
natural turf

Synthetic turf saves on water and eliminates the need for pesticides, fertilizers, and constant mowing.

Require a product that was like for like, grass look to replace previous natural grass. The supplied
synthetic turf is visually identical to natural turf.



Management of the artificial turf, including expected life span and waste management at the end of life

End of synthetic turf life, it will be removed and disposed of in a professional manner and what is able
to be recycled will be separated and done so. The client has committed to at end of life the disposal
of the synthetic turf will be undertaken by a suitably qualified contractor that ensures that the waste is
disposed of in the most environmentally friendly way at the time, which includes recycling.


Address the micro plastic concerns with proposed filtration methods and how it is separated from
stormwater



Extensive in depth discussions have been held with the synthetic turf supplier. The synthetic turf used
is an Australian made product made for Australian conditions, is UV stabilized with a 7 year guarantee
in a full sun position. The thatch of the turf is half filled with kiln dried sand to prevent turf from
experiencing high heat, and in the process speeding up deteriorating. With correct maintenance along
with the turf not being in full sun positions, the expected life span of the product should be 15 years +
as advised by the supplier. Regular maintenance including washed turf sand into the turf pile to
reduce heat in the turf, raking to keep the turf upright (and aesthetically pleasing) will increase the
durability and longevity of synthetic turf. The client has committed to a high quality of maintenance
given the proposed use of the development as short-stay accommodation. In the event of any micro
plastics in a rain event will be washed into the porous synthetic turf base. Excess stormwater will be

Page 3

diverted to the stormwater pits within the synthetic turf. The team have installed strainers to collect
microplastics to each stormwater pits within the synthetic turf areas. These will be regularly cleaned
and maintained as part of the maintenance schedule. The supplier has advised there should be little to
no plastics making it to the stormwater bio-basin. The bio-basin is designed for this purpose, as a
stormwater filter system and as such, fit for purpose should the need arise.



We, Andrew Gold Landscape Architecture, provide the above information in good faith. If I can be of
any further assistance, please do not hesitate to contact me.



Yours sincerely,




Andrew Gold
Director AGLA

Used in these records

About this file

File size
138 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1 - Landscape Architects letter.pdf · 138 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.