Council archive · source document
Att 1 - Landscape Architects letter · OPW19/0266.03
diverted to the stormwater pits within the synthetic turf. The team have installed strainers to collect microplastics to each stormwater pits within the synthetic turf areas. These will be regularly cleaned and maintained as part of the maintenance schedule. The supplier has advised there should be little to no plastics making it to the stormwater bio-basin. The bio-basin is designed for this purpose, as a stormwater filter system and as such, fit for purpose should the need arise. We, Andrew Gold Landscape Architecture, provide the above information in good faith. If I can be of any further assistance, please do not hesitate to contact me. Yours sincerely, Andrew Gold Director AGLA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1 - Landscape Architects letter.pdfRelated documentApplication case desk ↗
About this file
- File size
- 138 KB (small file)
- File type
No other editions are linked here.