33. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
34. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
35. Prior to the completion of the development and commencement of use, all site surfaces must
be effectively stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term. For the
purpose of this condition, an effectively stabilised surface is defined as one that does not, or
is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
36. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
c. Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
37. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
38. A final inspection and approval of the new driveways and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
Prior to commencement of works
39. Prior to requesting a prestart meeting:
a. The area of vegetation clearing required 25m downslope of the dwelling in accordance
with the Bushfire Attack Level Assessment must be clearly mark out on ground under
the supervision of a suitably qualified Bushfire Practitioner.
b. Tree protection flagging must be installed under the supervision of the Project Arborist.
(Refer to Vegetation Conditions).
c. Submission of a fauna management plan in accordance with the conditions of this
approval.
40. A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
at least five business days’ notice). The prestart meeting must be attended by the responsible
persons for:
a. Bushfire
b. Vegetation removal
c. Fauna Management
Page 19 of 21
Document Set ID: 24249087
Version: 16, Version Date: 24/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published).pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning - MCU25 0022 & OPW26 0029 (As Published)Related documentApplication case desk ↗
About this file
- File size
- 5.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.