Decision Notice MCU22&0050 & OPW22 0092
Plan No. Rev. Plan/Document Name Date
JSP-SJ-35790 C Site Plan, Layout Plan & Water 3 May 2022
Allocation prepared by Edge Consulting
Engineers
JSP-SJ-35791 A Elevation prepared by Edge Consulting 10 January 2022
Engineers
JSP-SJ-35792 C Jetty Details prepared by Edge 3 May 2022
Consulting Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 17 May 2024,
unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. The maximum number of vessels that may be berthed, moored, attached or stored on the
structure(s) must not exceed 2.
5. The use of the jetty/landing must not cause any adverse effects on the amenity of the
surrounding areas including changes to light, views, air quality and noise.
6. Vessels berthed/moored at the jetty must be located a minimum of 1.0m from the
prolongation of the property boundaries.
7. Vessels and boatlifting devices must be connected directly to the jetty, and not located side
by side or in tandem with another vessel.
8. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
9. All structures must have no detrimental effects on stormwater drains and/or easements.
10. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of the
revetment wall.
11. A rigid handrail must be fitted on one side of the walkway.
12. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide necessary support for the handrail.
13. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
14. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above the
1%AEP flood level.
15. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
16. Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
Page 2 of 5
Document Set ID: 21946044
Version: 1, Version Date: 31/05/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.