Skip to the record
The only place to find full transcripts.

Original source · versioned page text

C6361-22-ENG - Feb 2023 - V1

Attached to the e-mail RAL21/0022 - 7 Triller Court_ Pomona - Response to Further Advice Matters & Change to app (1 Lot into 4).

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

An existing 100mm diameter water main exists within the Triller Court road reserve. An
extension to this main will be constructed within the combned access and services
easement (Lot 7 handle). The new main will include appropriate flush out points in
accordance with UnityWater guidelines. It is proposed that Unitywater will supply and
install individual water meters to service new allotments upon lodgement and payment
of the applicable fee.


9.0    CONCLUSION


The proposed residential subdivision at 7 Triller Court, Pomona may be readily serviced
by infrastructure available within or near the subject site.


Minor filling and excavation will be undertaken to provide suitable access road grades,
services and drainage infrastructure.


The proposed allotments shall be provided with adequate freeboard to the existing 1%
AEP flood event. Given the small scale of the development and in accordance with State
Planning Policy guidelines, stormwater quality management is not required for the site.
Stormwater runoff is directed to existing well-defined overland flow paths. No adverse
impacts will result from proposed development works, therefore peak flow management
is not required.


The development will be serviced by onsite sewer treatment. Connection to existing
water services can be readily achieved.


There are no constraints or impediments to the proposed residential development that
cannot be overcome by suitable engineering design and best practice construction
methods.



                                                                                    13
Log in to download the original file

C6361-22-ENG - Feb 2023 - V1.pdf · 10.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.