Skip to the record
Accept no substitutions.

Original source · versioned page text

C6361-22-ENG - Feb 2023 - V1

Attached to the e-mail RAL21/0022 - 7 Triller Court_ Pomona - Response to Further Advice Matters & Change to app (1 Lot into 4).

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (10.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

 

 

 

 

 

 

 

 

LEGEND
7
ih [ SUBJECT SITE
‘ CMT 1 CATCHMENT LABEL
> , 99.908Ha
‘ HHS
y ‘ LN == imi mm EXISTING CATCHMENT BOUNDARY
x 1
} \ > —>-— __ STORMWATER FLOWPATH
DISCHARGE CALCULATIONS
SCENARIO CATCHMENT | CATCHMENT | FRACTION TIME OF iio} cio] Fy| cy] ly | 1% AEP
AREA | IMPERVIOUS | CONCENTRATION DISCHARGE | FLOW DEPTH
(Ha) (%) (min) (mm) (mm) (m*is) (m)
PRE-DEVELOPED cMT1 99.908 27 48 65.2 | 0.666] 1.2 |0.80] 110} 24.425 4.2208
POST-DEVELOPED CMT 1 99,908 28 48 65.2 | 0.667) 1.2 |0.80] 110] 24.434 4.2210

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REFERENCE - CHAPTER 4 of QUDM - RATIONAL METHOD

OVERLAND FLOW CAPACITY CALCULATIONS
Q100 OVERLAND FLOW

GULLY LONGITUDINAL GRADE = 2.0%
MANNING'S EQN

FLOW AREA = 35.581m?

WETTED PERIMETER = 49.559m
ROUGHNESS = 0.15

FLOW DEPTH = 1.2208m

CAPACITY @ FLOW DEPTH = 24.425m*/s
CAPACITY @ MAX DEPTH = 47.53m*/s

 

 

 

NN, V=0.73m/s
MAX WATER DEPTH = 1.2208m (1% AEP)
CATCHMENT 1 OVERLAND FLOW PATH SECTION - PRE-DEVELOPED
Scale 1:100 @A1 OVERLAND FLOW CAPACITY CALCULATIONS
Q100 OVERLAND FLOW
GULLY LONGITUDINAL GRADE = 2.0%
MANNING'S EQN

FLOW AREA = 33.591m?

WETTED PERIMETER = 49.571m
ROUGHNESS = 0.15

FLOW DEPTH = 1.2210m

CAPACITY @ FLOW DEPTH = 24.433m*/s

\ = 3
MAX WATER DEPTH = 1.2210m (1% AEP) vo. ne @ MAX DEPTH = 47.S3nrs

_\ CATCHMENT 1 OVERLAND FLOW PATH SECTION - POST-DEVELOPED
YT Scale 1:100 @ A1 0 50 100 150 200 250m
el

SCALE 1:2500 A1, 15000 A3

 

 

 

 

 

 

 

 

 

     

 

   

 

 

 

 

 

REV | DATE DESCRIPTION BY | CHKD PROJECT: DRAWING TITLE:
> o7 Saas aaaa R Yecoore SUT REHSEO LOT few [we PROPOSED RESIDENTIAL SUBDIVISION PRELIMINARY STORMWATER WALSH
E engineers@walshengnetau = (<a (ae! | cee eee at 7 TRILLER COURT, POMONA CATCHMENT PLAN CONSULTING
DIRECTOR APPROVAL 5
W walsheng.net.au wea 4665, | for LOVE POMONA PTY LTD SHEET 1 ENGINEERS
CONSULTING J 4 15/72 Wises Road, Maroochydore Q 4558
PO Box 5512, Maroochydore BC Q 4558 © This pianis Copyright Other than forthe purposes of and subjec to the conditions prescribed under the Copycght Act,n¢ | DRAWING No: REVISION
ENGINEERS | aan. 396i1 482716 FOR APPROVAL ayn ante ob ay mens ecto, neni miro roto cnyn. ectdnger he e: €6361/22/P07 A
NOT FOR CONSTRUCTION ‘oduced, stored ina retrieval system or transmitted without the prior written permission of Welsh Consulting Engingers ll
FILENAME : 0596-20 PO7 dg -DATE: 1220 -AGpm Al Sheet Size [ Design: Mvc Drawn BWM _ [Date: MAY 2022 ectual property remains within Walsh Consulting Enginee, Al enquiries shouldbe directed to Walsh Consulting Engineers, J COUNCIL REFERENCE: SHEET: 7 of 8

 

   

 

 

 

 

 

 

 
Log in to download the original file

C6361-22-ENG - Feb 2023 - V1.pdf · 10.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.