4.5     Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
        I issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
        strategic pipeline?


® No        •       End of part 4 of this checklist.
q Yes       •       This application requries assessment by the pipeline licence holder as an advice agency.

Section reference:
•       Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17

Part 8 - Taking or interfering with water

8.8     Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
        water)?


N No

            •       You must complete Taking artesian or sub-artesian water - IDAS form 12.
q Yes       •       This application requires assessment by the Department of Environment and Resource
                    Management as a concurrence agency.


8.9     Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?


® No                Go to question 8.12.
q Yes

8.12    Is any of the proposed operational work for any thing constructed or installed that allows, under the
        Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
        pump water)?

® No        •       Go to question 8.14
q Yes

8.14    Does any of the proposed operational work for any thing constructed or installed that allows, under
        the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
        water)?

® No        •       Go to question 8.19

q Yes

8.19    Is the proposed operational work for the following?

for the construction of a referable dam as defined under the Water Supply (Safety
                                                                                     q Yes            ® No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent         q Yes            N No


•       If yes to any of the above you must complete Referable dam - IDAS form 16.
•       This application requires assessment by the Department of Environment and Resource Management
        (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
        concurrence agency and you must give DERM a copy of the application



                                                                                                 irks - IDAS checklist 4
                                                                                                 in 1.0 December 2009

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 - Cover Letter - IDAS Form 1 and 6 Checklist 1 and 4.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.