Skip to the record
Noosa’s premier civic archive.

Council archive · source document

OPW18-0253 - Approved Plans · OPW18/0253

of 15

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
       -
APPROVED PLANS
   OPW18/0253
 NOOSA COUNCIL
16 JANUARY 2019
       -


[OCR of page images]
 

SCALE 1:1000 A1

GENERAL NOTES:

0

1. NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND
SHOWN ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO
LIAISE WITH THE RELEVANT SERVICE AUTHORITY PRIOR TO
COMMENCEMENT OF CONSTRUCTION TO DETERMINE THE LOCATION
AND LEVEL OF ALL EXISTING SERVICE UTILITIES. THE CONTRACTOR
SHALL BEAR THE COST OF ANY DAMAGE TO EXISTING SERVICES.

2. THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY
FOR ROADWORKS, DRAINAGE WORKS, SERVICE CONDUITS ETC.
PRIOR TO BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A
LICENCED SURVEYOR TO THE REQUIREMENTS OF THE SHIRE
ENGINEER.

3. SURFACE LEVELS SHOWN ARE INTERPOLATED FROM A SPOT LEVEL

SURVEY, THEREFORE DESIGN LEVELS BASED ON THIS INFORMATION
MAY BE VARIED BY THE SUPERINTENDENT ON SITE.

20 40 60 80 100m

beep} |

SCALE 1:1000 A‘, 1:2000 A3-

   

OVERALL SITE PLAN

 

SP195871

   

 

ROADWORKS NOTES:

1

THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH IPWEAQ &
NOOSA SHIRE COUNCIL STANDARDS.

THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
LANDSCAPE ARCHITECT'S DESIGN DRAWINGS.

SEDIMENTATION CONTROL DEVICES TO BE PROVIDED IN ACCORDANCE
WITH THE ENVIRONMENTAL MANAGEMENT PLAN.

ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE A MINIMUM DRY
DENSITY RATIO (M.D.D.R.) OF 100% STD

ALL CONDUITS TO BE IDENTIFIED BY BRASS PLAQUES ON KERB AND.
CHANNEL AS PER IPWEAQ STANDARD DRAWING R-0160 U.N.O.

WHERE CONCRETE DRIVEWAYS ABUT KERB & CHANNEL, THE
CONTRACTOR IS TO CONSTRUCT A COMMERCIAL CROSS-OVER IN
ACCORDANCE WITH IPWEAQ STANDARD DRAWING RS-051.

PROVIDE ENERGEX AND TELSTRA CONDUITS UNDER DRIVEWAYS &
FOOTPATHS (IF REQUIRED).

ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA
PROJECTS STANDARD SPECIFICATION.

ROADWORKS AND DRAINAGE SET-OUT INFORMATION |S AVAILABLE
FOR THE CONTRACTOR VIA COMPUTER MODEL PROVIDED BY ALTA
PROJECTS. HOWEVER, ALTA PROJECTS ACCEPTS NO RESPONSIBILITY
FOR INCORRECT SETOUT FROM THE DATA PROVIDED. CONTRACTOR
SHOULD CONFIRM THE CORRECT COORDINATES WITH THE
HORIZONTAL CURVE DATA PROVIDED ON THESE DRAWINGS.

CARPARK! INTERNAL PAVEMENT NOTES

© THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALTA PROJECTS STANDARD
SPECIFICATIONS, IPWEAQ, LOCAL AUTHORITY AND DEPARTMENT OF TRANSPORT AND MAIN
ROADS (DTMR) AND AUSTRALIA STANDARDS. ANY CONFLICTS SHALL BE REFERRED TO THE
ENGINEER FOR CLARIFICATION.

« ALTA PROJECTS HAVE NOT UNDERTAKEN A RISK ASSESSMENT OF THE PROPOSED CARPARK
DESIGN AND LAYOUT WITH RESPECT TO TRAFFIC OR PEDESTRIAN SAFETY, TRIP HAZARDS,
WPHS REQUIREMENTS ETC. SPECIALIST ADVICE SHOULD BE SOUGHT IN THIS REGARD.

SETOUT

« EXISTING SURFACE LEVELS AND CONTOURS SHOWN ARE BASED ON DIGITAL SURVEY
MODELS PROVIDED. EXISTING LEVELS MUST BE CONFIRMED ON SITE BY THE CONTRACTOR
AND ANY DISCREPANCIES REFERRED TO THE ENGINEER.

« ALLCARPARK SETOUT TO BE AS PER DIGITAL CO-ORDINATES OR DIMENSIONED DRAWINGS
PROVIDED. CONTRACTOR MUST NOT RELY ON DIGITAL DRAWING FILES OR SCALING OF
DRAWINGS.

SUBGRADE

 SUBGRADE SHALL BE OF SOAKED CBR 15 MATERIAL OR BETTER, FREE FROM TOPSOIL,
ORGANIC OR OTHER DELETERIOUS MATERIAL.
SUBGRADE SHALL BE COMPACTED TO 98% MDD (AS 1289 E1.1) AND SHALL NOT SHOW
MARKED DEFLECTION UNDER 8 TONNE AXLE LOAD AT PROOF ROLL.
ANY SOFT SPOTS SHALL BE EXCAVATED TO COMPETENT MATERIAL AND REPLACED WITH
SELECT MATERIAL FROM SITE OR TYPE 2.5 GRAVEL AT THE ENGINEER'S DIRECTION.
SUBGRADE SHALL BE GRADED TO PROFILES MATCHING FINISHED SURFACE AND ALL AREAS
SHALL DRAIN TO SUBSOIL DRAINS.
SUBSEQUENT PAVEMENT LAYERS MUST NOT BE PLACED UNTIL THE ENGINEER HAS
APPROVED ALL TEST RESULTS, SUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT AND THE
ENGINEER HAS PROVIDED WRITTEN APPROVAL TO PROCEED.

 

.

.

.

GRANULAR PAVEMENT

« FINAL PAVEMENT DESIGN SHALL BE DETERMINED BY THE ENGINEER UPON RECEIPT OF

SUBGRADE SOAKED CBR RESULTS AFTER THE COMPLETION OF BULK EARTHWORKS.

ALL GRANULAR PAVEMENT SHALL COMPLY STRICTLY WITH ALL CURRENT DTMR QUALITY
STANDARDS FOR THE NOMINATED PAVEMENT TYPE AND SHALL BE SUPPLIED BY A DTMR
ACCREDITED QUARRY.

PAVEMENT PLACEMENT SHALL NOT COMMENCE UNTIL MATERIAL QUALITY TEST RESULTS
HAVE BEEN APPROVED BY THE ENGINEER.

PAVEMENTS SHALL BE PLACED AT DEPTHS NOT EXCEEDING 200mm AND SHALL BE
COMPACTED TO 100% MDD (AS 1289 E1.1), SLURRIED AND TRIMMED TO PROFILE REFLECTING
FINAL DESIGN SUCH THAT A TIGHT PAVEMENT MATRIX IS ACHIEVED

WHERE CEMENT TREATMENT |S NOMINATED BY THE ENGINEER CEMENT DESIGN AT THE
NOMINATED RATE MUST TAKE PLACE AT AN ACCREDITED PUG MILL. NO ON-SITE CEMENT
TREATMENT WILL BE ACCEPTED.

ASPHALT PRIME SHALL NOT BE PLACED OVER BASE COARSE PAVEMENT UNTIL:

- ALL TEST RESULTS HAVE BEEN APPROVED.

- ASUCCESSFUL PROOF ROLL HAS BEEN CARRIED OUT.

- AS CONSTRUCTED SURVEY HAS BEEN APPROVED.

- ENGINEERS WRITTEN DIRECTION TO PROCEED IS OBTAINED.

.

.

.

 

APPROVED PLANS
OPW18/0253
NOOSA COUNCIL
16 JANUARY 2019

 

 

 

eeee

REINFORCED CONCRETE NOTES:

GENERALLY, CONCRETE SHALL BE IN ACCORDANCE WITH AUSTRALIAN STANDARD SPECIFICATIONS
AS 3600 "SAA CONCRETE STRUCTURES CODE".

IN ADDITION TO THE ABOVE CODE THE FOLLOWING AUSTRALIAN STANDARD

SPECIFICATIONS AND CODES OR THEIR LATEST REVISION SHALL APPLY:

AS 1012 PTS 1-19 METHODS FOR THE TESTING OF CONCRETE (METRIC UNITS).

AS 3583.1,2,3,8 METHODS OF TEST FOR SUPPLEMENTARY CEMENTITIOUS.
MATERIALS FOR USE WITH PORTLAND CEMENT.

AS 3582.1 SUPPLEMENTARY CEMENTITIOUS MATERIALS FOR USE WITH PORTLAND
CEMENT- FLY ASH

AS 1141 METHODS FOR SAMPLING AND TESTING AGGREGATES.

AS 1302 STEEL REINFORCING BARS FOR CONCRETE.

AS 1303 HARD DRAWN STEEL REINFORCING WIRE FOR CONCRETE.

AS 1304 HARD DRAWN STEEL WIRE REINFORCING FABRIC FOR CONCRETE.

AS 3972 PORTLAND AND BLENDED CEMENTS.

AS 1379 READY-MIXED CONCRETE (METRIC UNITS)

AS 2758 PART 1 CONCRETE AGGREGATES.

AS 1478, 1479 CODE OF PRACTICE FOR USE OF CHEMICAL ADMIXTURES IN CONCRETE.

AS 3610 FORMWORK FOR CONCRETE.

SUPPLY:

ALL CONCRETE IS TO BE SUPPLIED BY A LICENSED READY MIXED CONCRETE MANUFACTURER. NO ON SITE
BATCHING IS ACCEPTABLE.

MANUFACTURERS MUST HAVE AN APPROVED AND CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE AND
BE APPROVED BY THE ENGINEER PRIOR TO SUPPLY OF ANY CONCRETE.

ALL MATERIALS, STORAGE, BATCHING, ETC. TO CONFORM TO THE REQUIREMENTS OF THE RELEVANT
AUSTRALIAN STANDARDS.

ALL CONCRETE TO BE NORMAL-CLASS IN ACCORDANCE WITH AS 3600 UNLESS NOTED OTHERWISE.

ALL CONCRETE SHALL HAVE A SHRINKAGE STRAIN NOT EXCEEDING 600 MICROSTRAIN

ALL CONCRETE IS SPECIFIED BY 28 DAY COMPRESSIVE STRENGTH UNLESS NOTED OTHERWISE.

ALL REINFORCEMENT TO BE SUPPLIED BY A REGISTERED MANUFACTURER WITH AN APPROVED AND
CERTIFIED QUALITY ASSURANCE PROGRAM IN PLACE. ALL REINFORCEMENT IS TO COMPLY WITH THE
REQUIREMENTS OF AS 1302, AS 1303 AND AS 1304 AS APPLICABLE.

ALL REINFORCEMENT IS TO BE DELIVERED TO SITE FREE FROM OIL, GREASE OR OTHER SURFACE
COATINGS WHICH MAY IMPAIR BOND TO CONCRETE.

ALL REINFORCEMENT TO BE 500 MPA MINIMUM YIELD UNLESS NOTED OTHERWISE.

FORMWORK:

ALL CONCRETE OTHER THAN CAST AGAINST GROUND, SHALL BE PLACED AGAINST TIMBER, PLYWOOD
OR STEEL FORMS.

ALL FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF AS 1509 AND AS 1510.

REFER ARCHITECT'S DRAWINGS FOR REQUIRED FORMWORK CLASS WHERE APPLICABLE. CLASS B
FORMWORK SHALL BE ADOPTED UNLESS NOTED OTHERWISE.

ALL TEMPORARY FORMWORK, FALSEWORK, PROPPING, BRACING, TO BE DESIGNED AND CERTIFIED
BY A REGISTERED PROFESSIONAL ENGINEER (RPEQ) PRIOR TO ERECTION.

ALL REINFORCEMENT TO BE SUPPORTED OFF FORMS WITH PLASTIC OR PLASTIC TIPPED WIRE CHAIRS.
TO PROVIDE THE SPECIFIED COVER. ALL CONCRETE CAST AGAINST GROUND TO BE UNDERLAIN BY
WATERPROOF MEMBRANE.

TRANSPORT:

ALL CONCRETE IS TO BE TRANSPORTED TO SITE IN AGITATOR TRUCKS.

CONCRETE NOT PLACED WITHIN ONE HOUR AFTER BATCHING MAY BE REJECTED AT
THE ENGINEER'S DISCRETION.

PLACEMENT, COMPACTION AND FINISHING:

CONCRETE TO BE PLACED IN FORMS BY HORIZONTAL 'CHUTING' NO MORE THAN 3M, CONCRETE
PUMPING OR KIBBLING.

UNDER NO CIRCUMSTANCES SHALL CONCRETE BE INDUCED TO FLOW HORIZONTALLY BY USE OF
VIBRATORS.

ALL CONCRETE SHALL BE PLACED CONTINUOUSLY BETWEEN CONSTRUCTION JOINTS AS DETAILED
IN SUCH A MANNER AS TO AVOID 'COLD JOINTS'. CONSTRUCTION JOINTS SHALL BE LOCATED AS
DETAILED ON DRAWINGS OR AS INSTRUCTED IN WRITING BY THE ENGINEER.

ALL CONCRETE IS TO BE COMPACTED UPON PLACEMENT USING 50mm DIAMETER VIBRATORS.
SLABS AND BEAMS ARE TO HAVE A FILM OF APPROVED ALPHATIC ALCOHOL APPLIED TO THE
SURFACE,

DIRECTLY AFTER SCREEDING, PRIOR TO FLOATING, REGARDLESS OF WEATHER CONDITIONS.
ADDITIONAL PROTECTIVE MEASURES SUCH AS CHILLED MIX WATER, SHADING PLACEMENT AREAS,
WIND BREAKS, ETC. MAY BE REQUIRED BY THE ENGINEER IF PLACING CONCRETE DURING
UNUSUALLY HOT, DRY OR WINDY CONDITIONS.

ALL CONCRETE SLABS SHALL BE STEEL TROWEL FINISHED UNLESS NOTED OTHERWISE.

BROOM FINISHING, WHERE SPECIFIED, SHALL BE CARRIED OUT AFTER STEEL TROWEL FINISHING
ALL CONCRETE TO BE ORDERED AND PLACED AT 80MM SLUMP UNLESS NOTED OTHERWISE.

NO WATER TO BE ADDED ON SITE UNLESS APPROVED BY THE ENGINEER.

TESTING:

ALL CONCRETE TESTING IS TO BE CARRIED OUT BY A NATA REGISTERED LABORATORY,

IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF AS 1012.

THE FOLLOWING TESTING SCHEDULE IS TO BE ADOPTED IN ADDITION TO THE REQUIREMENTS
OF THE MANUFACTURER'S QUALITY ASSURANCE PROGRAM

- AMINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH ELEMENT CAST ON ANY
GIVEN DAY (EG. COLUMNS, FOOTINGS, ETC)

- AMINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH CONCRETE STRENGTH
GRADE CAST ON ANY GIVEN DAY.

- A MINIMUM OF ONE TEST (3 CYLINDERS) TO BE TAKEN FROM EACH 50m? OR PART THERE OF
CAST ON A GIVEN DAY FOR EACH STRENGTH GRADE.

ALL SAMPLES ARE TO BE TAKEN FROM THE AGITATOR, ON SITE.

IF WATER IS ADDED ON SITE, WITH THE ENGINEER'S PERMISSION, SAMPLES FOR TESTING
SHALL BE TAKEN AFTER THE ADDITION OF WATER.

CURING:
ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD FOR A MINIMUM OF 28 DAYS AFTER FINISHING.
CURING METHOD IS TO BE APPROVED BY THE ENGINEER PRIOR TO CONCRETE PLACEMENT AND SHALL
GENERALLY CONSIST OF ONE OR A COMBINATION OF THE FOLLOWING METHODS

- CONTINUOUS WATER PONDING.

- COMPLETE ENCASEMENT IN A WATERPROOF FILM (EG. POLYTHENE).

- APPLICATION OF AN APPROVED CURING COMPOUND.

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES.

Design:

 

 

 

REV

DATE DESCRIPTION BY | CHKD

 

 

 

 

 

 

DIRECTOR APPROVAL
RPEQ- 4784

Drawn:
Date: MAY 2016

|ALT.

 

Checked

 

Datum _AHD

ENGINEERING : DESIGN : MANAGEMENT mail: [email protected]

Brah 101 pty Itd t/a Alta Projects PROJECT
ABN. 91 611 354511

26 Memorial Avenue, Cotton Tree

PO Box 559, Cotton Tree, QLD, 4558
Tel (07) 5475 4125 Fax (07) 5479 1607

at SERENITY CLOSE, NOOSA

Web: hitp:/www.alta.net.au

 

A‘ SHEET SIZE

 

 

 

for CAPE BOUVARD DEVELOPMENTS

FILENAME : 96107-18-RO1-R02.éug-DATE 281/18 12:Mipm - XREF': a8 107-X-BASE; a6107-X-SURVEY; a6107X-ARCH landscape: a61O7-X-ARCH; H-Aporoved-SH; H-Chfbted-SH

PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B

DRAWING TITLE:
ROADWORKS OVERALL SITE PLAN AND NOTES.

 

DRAWING No:

 

Revision Sheet
1 of 1

A6107/18/RO1

 

© This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed wander the
Copyright Act, no part of it may in any form or by any means (electronic, mechanical, micro copying, photo
copsing, recording or otherwise) be reproduced, stored in a retrieval system or transmitted without the prior

faften permfsion of AUfh Project. Alf ntellctanl property eusins wiln AKI Projects leagues shoal
Council Ref Seavected fo AUT Poets rer "

 

 

 
Full text of the other 14 pages

Page 2

       -
APPROVED PLANS
   OPW18/0253
 NOOSA COUNCIL
16 JANUARY 2019
       -


[OCR of page images]
     
  
  

{SSSSSSSSSSSSSS

ZZ
przeeeE ZO

ry ET

|
|
Zara

aes Sess SSS
a

  

 

 
       

 
  
  
  
  

;
4
N
NI

esas

' ‘fy PROPOSED CONCRETE

| \ q COMMERCIAL DRIVEWAY. REFER
iH DRAWING R04 FOR DETAILS
4
it RL15.25
Kt

RL15.0

a onus 60
WS IN

S
2X

a
ARL15.20

   
     

ZPZTZZT A)

[LEELA LT LAZLALE

 

STAGE 4B "\,
BASEMENT ~~
FFL12.10

   
   

«

    

 

LEGEND:
Dy PROPOSED LIGHT DUTY CONCRETE
PAVEMENT AREA
PROPOSED TYPE''' INTEGRAL KERB
Be

PROPOSED TYPE 'B3’ INTEGRAL KERB

seemeeQ@eess= PROPOSED DRAINAGE NETWORK

TPIT ~~ PROPOSED TOP OF BATTER

------ PROPOSED TOE OF BATTER
5
oe PROPOSED DESIGN SURFACE LEVEL

----+- 50—---— FINISHED SURFACE CONTOUR

_509 EXISTING SURFACE CONTOUR
—— —£I0H— — — EXISTING OVERHEAD ELECTRICAL
—— —EUG— — — EXISTING UNDERGROUND ELECTRICAL
—— —1 — ——_ EXISTING TELSTRA RETICULATION
— — —p— — —_ EXISTING STORMWATER DRAINAGE
— — —w— — —_ EXISTING WATER RETICULATION
— — —s— — —_ EXISTING SEWER RETICULATION
—— —c— —— EXISTING GAS MAIN

2 EXISTING TREE

PROPOSED CONCRETE DOWEL JOINT
PROPOSED CONCRETE BOLSTER JOINT
PROPOSED CONCRETE EXPANSION JOINT

 

ALL KERB, KERB & CHANNEL,
WHEELSTOPS & BOLLARDS TO
BE PAINTED "SAFETY YELLOW"

 

 

APPROVED PLANS
OPW18/0253
NOOSA COUNCIL
16 JANUARY 2019

 

 

 

0 2.0 4.0 6.0 8.0 10.0m

|

SCALE 1:100 At, 1:200 A3

 

NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. ] Design: PBL

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Brah 101 pty Itd t/a Alta Projects PROJECT PRAWING ne
Drawn: Mi y i ROADWORKS LAYOUT PLAN
A.B.N. 91 611 354 511
Date: May 2046 ABN oteits645ii = | PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B
checees L Tal (07) 8475 4128 Fax (07) 479 1607 | at SERENITY CLOSE, NOOSA DRAWINGNO: A64Q7/18/RO2 ae
jecke . . . Email: [email protected] = 7 —
ENGINEERING : DESIGN : MANAGEMENT © This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed tmnder the

[enor] senseo Ra ies a | set SiaGcroR MpaROVAL Dan a Web: hitp/mwwalta.net.au for CAPE BOUVARD DEVELOPMENTS eRe cei kate uta dec wine tat nated mil ar
REV | DATE DESCRIPTION BY | CHKD RPEQ- 4784 ‘1 SHEET SIZE FILENAME :26107-18-RO1-202.dug- DATE : 3/10/18 -1:5tpm - XREFs: a6107-X-BASE; a6107-X-SURVEY; a6107-X-ARCH landscape; a6107-XARCH; H-Approved-SH; H-Chefked-SH Council Ref: Tededel aun Pret AT Snfeiectl property remains within ALTA Projects. all enquiries should

 

 

Page 3

       -
APPROVED PLANS
   OPW18/0253
 NOOSA COUNCIL
16 JANUARY 2019
       -


[OCR of page images]
 

    
 
 

 

 

  

  
    

     
 

  
  

 

  

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APPROVED PLANS
OPW18/0253
NOOSA COUNCIL
16 JANUARY 2019

 

 

 

 

 

    
 

  

 

 

 

 

 

 

 

 

 

>
al
ol
a
| RAMP 1
4m 2.7m 7m 15.6m
1
SERENITY CLOSE (FALL AME
an
VARIES ! VARIES
VARIES VARIES
RL15.75 1RL15.75 -IRL15.60 pits.29 Se MAXFALL ting 1S MAK
oon = RL14.92 | | SOFFIT FFL 15.0
2 4
g om call 7 STAGE 4B
N 1in8 pals BASEMENT
RUZ 35 f AS |RUI21 airy SM FALL Ch puta _FFL12.10
SECTION
SCALE 1:100 AT
RAMP 2
CONCRETE CARPARK 975m
SOFFIT FFL 17.1 i 3.05
2m. Am.
5% MAX FALL wo STAGE 4A ,
aN RL14,.78 10% MAX 5 7 BASEMENT B99 Car Vertical Clearance
=> SI FALL) orig POR FALL | RL14.2 FFL14.20 Overall Length 5.200m
= Overall Width 1.940m
Overall Body Height 2.200m
Min Body Ground Clearance 0.100m
Track Width _ 1.840m
SECTION Lock-to-lock time _ , 4.00s
SCALE 1100 At Curb to Curb Turning Radius — 6.300m
0 2.0 6.0 .
SCALE 1:100 A1, 1:200 A3
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: MB Brah 101 pty Itd Ua Alta Projects PROJECT: DRAWING TITLE:
Drawn: MB DRIVEWAY RAMP LONG SECTIONS
Date: MAY 2016 26 Memorial Aventis. Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B
PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
- Tel (07) 5475 4125 Fax (07) 5479 1607] at SERENITY CLOSE, NOOSA DRAWING No: 64(97-18-RO3 A | 1 of 1

osiror018

REVISED SECTIONS

 

 

REV

 

DATE

 

DESCRIPTION

 

BY

 

CHKD

 

 

DIRECTOR APPROVAL

RPEQ- 4784

Checked

 

 

Datum _AHD

Email: [email protected]

ENGINEERING : DESIGN : MANAGEMENT
Web: hitp:/www.alta.net.au

 

 

A‘ SHEET SIZE

 

FILENAME :26107-18-R02- ROADWORKS SECTIONS dug DATE : 810/18 - 1:80pm - XREF':H-Approved-SH; H-Checkoo-SH

 

 

for CAPE BOUVARD DEVELOPMENTS

 

Council Ref:

© This plan is Copyright. Other than for the purposes of and subject to the conditions prescribed wander the
Copyright Act, no part of it may in any form or by any means (electronic, mechanical, micro copying, photo
copsing, recording or otherwise) be reproduced, stored in a retrieval system or transmitted without the prior
wnitten permission of ALTA Projects. all intellectual property remains within ALTA Projects, all enquiries should
be directed to ALTA Projects.

 

 

 

Page 4

       -
APPROVED PLANS
   OPW18/0253
 NOOSA COUNCIL
16 JANUARY 2019
       -


[OCR of page images]
 

COMMERCIAL DRIVEWAY 'A' - 5.70m WIDTH

 

 

 

   

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMMERCIAL CROSSOVER NOTES:-
1. Concrete N32 in accordance with AS 1379 and AS 3600.
2. Reinforcing fabric to AS 1304. Lap fabric 250mm.
3. Depths of concrete and reinforcing steel shown are the
minimum requirements for good foundation conditions, and
average traffic loading. Where this does not apply, depths of PROPERTY BOUNDARY
concrete and reinforcing shall be increased to suit specific |
conditions.
4. Reprofile adjacent footpath to match driveway. Footpath SAWCUT AND
earthworks adjoining concrete must be well compacted BREAKOUT BACK OF
5. Compaction for subgrade 95% Standard to AS 1289.5.1.1. KERB AND CHANNEL
6. Where subgrade is less than CBR 5 excavate and provide concrete Oo nn
imported material to satisfaction of the Superintendent. CONCRETE I ~
7. Concrete driveway unless otherwise approved FOOTPATH FOOTPATH ann CESS
8. Paver and/or proprietary concrete surface finishes to driveway bl z x @
shall only be used when approved by Local Authority. Ss
9. Refer project drawings or Local Authority Standard Drawings 3
for Verge Type Cross Sections. s
10. All dimensions in millimetres. 2
= t= |
[ 600 (Kerb taper
1500 NOM 1500 NOM |
B1 BARRIER KERB
COMMERCIAL DRIVEWAY AND CHANNEL
(<)) CROSSOVER ‘A’ DETAIL
NOTE: DRIVEWAYS ARE TO BE CONSTRUCTED IN
ACCORDANCE WITH IPWEAQ STD DRG RS-051
ALL KERB, KERB & CHANNEL,
WHEELSTOPS & BOLLARDS TO
BE PAINTED "SAFETY YELLOW"
NOMINAL FACE. ALL KERBS ADJACENT CONCRETE
OF KERB PAVEMENTS TO BE PAINTED
' "SAFETY YELLOW’
110 | 49
pope
—_—____
150
SETOUT POINT & LEVEL
& PROPOSED CONCRETE PAVEMENT LEVEL
| ~ - 125mm CONCRETE (N32)
KERB TO BE CAST . VISQUEEN VAPOUR BARRIER a < a SL82 MESH TOP 40 COVER
INTERGRAL WITH SLAB EARTHWORKS LEVEL 3 (TO BE CONFIRMED DURING
CONSTRUCTION)
INTEGRAL KERB - TYPE B
PAVEMENT JOINTS TO EXTEND THROUGH KERB KKK 100mm CBR15 MATERIAL
DIOS onpacteb 10 100% MBO

NOMINAL FACE
OF KERB

 

KERB TO BE CAST
INTERGRAL WITH SLAB

    

SONS

 

  

SEX K RRR
SSO
RRR RINE

 

 

ALL KERBS ADJACENT CONCRETE

PAVEMENTS TO BE PAINTED
"SAFETY YELLOW’

 

 

     

INTEGRAL KERB - TYPE B3
PAVEMENT JOINTS TO EXTEND THROUGH KERB

 

 

LIGHT DUTY CONCRETE PAVEMENT DETAIL

SCALE 1:10

   

VISQUEEN VAPOUR BARRIER

   

FINISHED PAVEMENT LEVEL

  

100mm CONCRETE (F'C = 25MPa)

CONCRETE FOOTPATH

SCALE 1:10
e PROVIDE BOLSTER JOINTS @ 3m CTS

100

SL72 MESH
40 COVER

 

20mm SAND LAYER

¢ PROVIDE EXPANSION JOINTS @ 12m CTS

1500

4IN8

SL72 MESH

3500 NOM

| 25%

 
 
 

200UM VISQUEEN.

50mm BEDDING SAND

40 TOP COVER.

(_».\ SECTION

YT) SCALE 1: 20 (A1)

DOWEL SOCKETS TO
MANUFACTURERS SPEC.
OR EQUAL

PROPERTY
BOUNDARY

—/

 

APPROVED PLANS
OPW18/0253

 

 

 

 

2 NOOSA COUNCIL
” 16 JANUARY 2019
- TOOL FINISH EDGES
__R16 GALVANISED DOWELS (400 LONG)
AT 300 CTS CENTRAL
SL82 MESH
& COVER

 

125

 

 

 

 

 

 

 

  

 

200

 

 

200 UM VISQUEEN

 

LIGHT DUTY CONCRETE PAVEMENT DOWEL JOINT (DJ)

SL82 MESH
40 COVER

125

 

PROVIDE AT 9.0m

x 9.0m MAXIMUM CENTRES

NTS.

DOWEL SOCKETS TO
MANUFACTURERS SPEC.
OR EQUAL

   
  
  

R16 GALVANISED DOWELS
(400 LONG) AT 300 CTS

10mm ABELFEX OR EQUIV.

200 UM VISQUEEN

LIGHT DUTY CONCRETE PAVEMENT EXPANSION JOINT (EJ)

N.T.

CUT EVERY SECOND
WIRE OF MESH

S

TOOL FINISH CONCRETE
BREAK SLAB FULL DEPTH
WHILE STILL "GREEN"

 

 

 

 

 

 

 

 

200 UM VISQUEEN
LIGHT DUTY CONCRETE PAVEMENT BOLSTER JOINT (BJ)
NTS.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: MB . PROJECT: DRAWING TITLE:
Drawn: NB Bran 101 py id va Ata Project ROADWORKS DETAILS
Date: May 2016 26 Memorial Aventis. Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT STAGES 4A & 4B

/ PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet

Check - Tel (07) 475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No: 46497.48-RO4 | 1 of 1
ecked - ] ENGINEERING : DESIGN : MANAGEMENT E'ail: [email protected] © This plan Be Copprieht, Other @han for the purposes of and subject to the conditions prescribed under the
Comat Ack as Pov of my oxy frm O° aay Ieoas (ckctron, mechena, ro copying photos

 

 

 

DIRECTOR APPROVAL

Datum _AHD

Web: hitp:/www.alta.net.au

 

 

 

 

Rev | DATE DESCRIPTION BY

 

 

 

CHKD

RPEQ- 4784

 

 

A‘ SHEET SIZE

FILENAME : 26107-18-R04.dug -DATE: 28018. 12:46pm - XREFS: H-Approved-SH; H-Checked-SH

 

 

for CAPE BOUVARD DEVELOPMENTS

copsing, recording or otherwise) be reproduced, stored in a retrieval system or transmitted without the prior
wnitten permission of ALTA Projects. all intellectual property remains within ALTA Projects, all enquiries should

 

Council Ref:

be directed to ALTA Projects.

 

 

Page 5

                                                                Green Tape Solutions
                                                                     Quality, Integrity, Experience


               -
     APPROVED PLANS
        OPW18/0253
      NOOSA COUNCIL
     16 JANUARY 2019
               -




Bushfire Information Kit for the
Covenant Area and Fuel Control
Area
Settler’s Cove Stage 4

Prepared for Settler’s Cove




Prepared by:

Green Tape Solutions

PO BOX 282
Morayfield Qld 4506

M:   0423 081 428
E:   [email protected]
W:   www.greentapesolutions.com.au


Client Manager: Kelly Matthews
Report Number: PR18082_BIK_Settlers Cove Stage 4




                                                              Green Tape Solutions / ABN 20 162 130 627
                                      PO BOX 282, Morayfield, QLD, 4506/ www.greentapesolutions.com.au
                                      Telephone: 07 5428 6372 / Email: [email protected]

Page 6

                                                                                                                                   Green Tape Solutions
                                                                                                                                              Quality, Integrity, Experience

DISCLAIMER
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright Act, no
part of this report, its attachments or appendices may be reproduced by any process without the written consent of Green Tape
Solutions. Green Tape Solutions has prepared this report for the sole purposes of the Client. This report is strictly limited to the
purpose and the facts and matters stated in it and does not apply directly or indirectly and will not be used for any other application,
purpose, use or matter. The reproduction, adaptation, use or communication of the information contained within this report may
not be used without the written permission of Green Tape Solutions.
In preparing this report we have assumed that all information and documents provided to us by the Client, or as a result of a
specific request or enquiry, were complete, accurate and up-to-date. Where we have obtained information from a government
register or database, we have assumed that the information is accurate. Where an assumption has been made, we have not made
any independent investigations with respect to the matters the subject of that assumption. We are not aware of any reason why
any of the assumptions are incorrect.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to property,
injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or rectify any harm,
loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or financial or other loss.

Document Records - Quality

           Revision           Date                      Prepared by                                       Reviewed by                                    Approved by
                                                        (name/title)                                      (name/ title)                                  (name/title)
                                                                                                          Kelly Matthews, Director
            Version A           6/08/2018               Jasmine Vink, Ecologist                                                                          Client
                                                                                                          / Principal Ecologist
                                                        Kelly Matthews, Director /                        Kelly Matthews, Director
            Version B          25/09/2018                                                                                                                Client
                                                        Principal Ecologist                               / Principal Ecologist
                                                        Kelly Matthews, Director /                        Kelly Matthews, Director
            Version C           3/10/2018                                                                                                                Client
                                                        Principal Ecologist                               / Principal Ecologist
                                                                                                          Kelly Matthews, Director
            Version D          12/12/2018               Jasmine Vink, Ecologist                                                                          Client
                                                                                                          / Principal Ecologist




Table of Content
1.          INTRODUCTION ..................................................................................................................... 3
2.          BUSHFIRE MANAGEMENT REQUIREMENT ................................................................. 4
     2.1                      ASSET PROTECTION ZONES .......................................................................................4
       2.1.1         Fuel control area ...................................................................................................................................................................... 4
       2.1.2         POSCWP area .......................................................................................................................................................................... 5
     2.2                      REMOVAL OF RUBBISH ...............................................................................................6
     2.3                      W EED TREATMENT AND REMOVAL...............................................................................6
     2.4                      FENCING ..................................................................................................................6
     2.5                      MAINTENANCE OF FIRE SERVICES ...............................................................................6
     2.6                      PROPERTY MAINTENANCE ..........................................................................................7
3.          PREPARATION AND EVACUATION MANAGEMENT PLAN .................................... 8
     3.1                      STEP BY STEP APPROACHES ......................................................................................8
     3.2                      EVACUATION .............................................................................................................8
4.          IMPLEMENTATION PLAN ................................................................................................... 9
     APPENDIX 1    FIRE-RETARDANT FLORA SPECIES SPECIES WITH FIRE RETARDANT CHARACTERISTIC FOR
     FUEL CONTROL AREA (CONSISTENT WITH THE LANDSCAPE MASTER PLAN AND THE ERP) ........................ 11

TABLES

Table 1: Implementation plan for the bushfire within the covenant area ...............................................9

FIGURES

Figure 1: Covenant Area C and Fire Management Control Area (Extract from WMW, 2005)                                                                                                                        3
Figure 2: Cross section of the covenant areas                                                                                                                                                              4




PR18082_BIK_Settlers Cove Stage 4                                                                                                                                                                            ii

Page 7

                                                                    Green Tape Solutions
                                                                         Quality, Integrity, Experience


1. Introduction
The site is located at 12 - 14 Serenity Close, Settler’s Cove (Noosa Heads), Queensland (the site),
properly described as Lot 100 SP305332 (Previously Lots 7 and 8 on SP19587). The site contains high
density residential units and an area protected by a vegetation covenant (Referred as Covenants C and
D in Figure 1). Each covenant area is located between the development area on the site and the Noosa
Inlet. The covenant area has a steep slope down to the Noosa Inlet and is vegetated with a forest type
formation which is a low potential bushfire hazard. This Bushfire Information Kit (BIK) was prepared to
meet Condition 29 of the development approval (MCU16/0143.01) for Settler’s Cove, Stage 4 which
requires:
    ‘’to provides a clear and practical instructions regarding the bushfire management
    requirements of the covenant area. These instructions are to be in plain English, logical format,
    provide concise direction for the management of the covenant area in accordance with the
    approved Bushfire Management Plan.’’
The BIK was prepared in accordance with:
•   The approved Fire Management Plan for Settler’s Cove (the FMP) (WMB, 2005);
•   The approved Ecological Restoration Plan (ERP) (C&B Group, 2005);
•   The Landscape Master Plan (LandGraphics Landscape Architects, 2005);
•   The approved Fauna Management Plan (C&B Group, 2005); and
•   Recently prepared Fauna Management Plan for Stage 4 (Green Tape Solutions, 2018);
The Covenant Area shall be protected and maintained as per Council’s approval and in accordance with
the terms of the terms of the covenant and the management. A summary of the main management
requirement is provided below. The covenant area shall be:
• “Managed to protect and reinforce its environmental values including its Koala habitat and corridor
  values, Glossy Black Cockatoo habitat values, scenic amenity values and water quality protection
  function.
• Managed and maintained in accordance with the approved EMP, Fauna Management Plan, FMP
  and ERP.
• Separated from the adjacent development by a 1.2m high fence. The fence shall be fauna-friendly
  but shall deter unauthorised people from entering the area.
• Maintained by authorised people only permitted in this area as appointed by the Covenantor. The
  Covenantor is responsible for the management and the protection of the Covenant Area.
• Protected from infrastructure, tracks, drainage, water control devices and the like or other
  development.
• Protected so that native trees and vegetation are not removed, pruned, lopped, damaged or
  otherwise adversely affected without written approval from Council.
 • Restored and managed in accordance with the ERP.”

                               Covenant C


                       Covenant D




                      Figure 1: Covenant Area C and Fire Management Control Area (Extract
                      from WMW, 2005)

PR18082_BIK_Settlers Cove Stage 4                                                                 Page 3

Page 8

                                                                       Green Tape Solutions
                                                                            Quality, Integrity, Experience


2. Bushfire Management Requirement
This section should be read in conjunction with the approved FMP (WMB, 2005), the Fauna
Management Plan (C&B Group, 2005), Landscape Master Plan (LandGraphics Landscape Architects,
2005) and the ERP (C&B Group, 2005).
2.1        Asset Protection Zones
All vegetation removal must be in accordance with Council approval in covenant areas. The covenants
C and D are composed of the following zones (Figure 2):
      •   Fuel control area
      •   Private Open Space for Conservation and Waterways Protection (POSCWP) Area (composed
          of sclerophyll vegetation and littoral rainforest/non-flammable vegetation)




              Figure 2: Cross section of the covenant areas (Extract from WMW, 2005)

2.1.1     Fuel control area
A fuel control area of 3m in width is created adjacent to the covenant area, paths and building
envelopes. An additional fuel control area of 2.5m will be located within the covenant area (as illustrated
in Figure 2). These areas will be planted with fire retardant species. Fire-retardant species are flora
species that have the ability or tendency to slow up or halt the spread of fire. Within the fuel control area,
this species must be maintained at a height of no more than 30 cm (ground-cover species). Horizontally
growing plants are preferred to eliminate the need for intensive maintenance. A list of suitable ground-
cover species is provided in Appendix 1.
No flammable features or structures are permitted in this area. This includes barbeques, fire wood,
unmaintained grass and vegetation and hazardous substances.




PR18082_BIK_Settlers Cove Stage 4                                                                     Page 4

Page 9

                                                                       Green Tape Solutions
                                                                            Quality, Integrity, Experience

Fire retardant features accepted within the fuel control area include paved pathways, swimming pools,
mowed grass, fire-retardant vegetation (refer to Appendix 1). Any features will need to ensure that
access to the hydrant and tap is available.
A hose reel is to be permanently fitted to the hydrant.
Fuel reduction must occur in the building fuel control area, at least fortnightly, during the fire danger
season, i.e. September to March.
Fuel load monitoring of this area is to be undertaken annually before the end of June. A bushfire
management specialist will be engaged to perform fuel load monitoring in the fuel control area and the
covenant area and will consider the fuel reduction performance objectives outlined in this section when
identifying annual fuel reduction works.
Within two weeks of completing the fuel load monitoring, the bushfire management specialist will provide
a brief report which presents the results of the fuel load monitoring and identifies weeds and fuel
reduction works.
The fuel reduction performance objectives within the fuel control area are:
•   treatment of weeds;
•   surface fuel layer is < 10 – 25 mm deep across 60 – 80% of the area;
•   Lawn maintained to < 100 mm in height;
•   Groundcover plants (including plantings) in the near-surface fuel layer are maintained to remove
    dead leaves and trimmed to a maximum of 30 cm in height;
•   No forest litter from the covenant area in gardens; and
•   Fire retardant vegetation height below 30 cm.
The fuel reduction performance objectives will be achieved by:
•   Visually monitoring lawn and garden areas;
•   Mowing lawn to ensure lawn height is maintained; and
•   Collecting and removing dead leaves, branches and forest litter from gardens by hand or with a
    garden blower/vacuum.

2.1.2   POSCWP area
This section applies to fuel reduction in the remainder of the covenant area, which extends from the
covenant fuel control area to the Noosa Inlet. It consists of a mixture of sclerophyll vegetation and littoral
rainforest adjacent to intertidal vegetation fringing the Noosa Inlet.
The building is setback from the covenant area boundary by 25-40 metres. There is a 10m to 30m width
of sclerophyll forest to the west of the proposed development area that will present some fire threat but
this threat is low as it is mitigated by the presence of littoral rainforest species (e.g. swamp mahogany,
heathland and predominantly moist ground conditions).
This area is to be managed to protect and reinforce its environmental values including its Koala habitat
and corridor values, Glossy Black Cockatoo habitat values, scenic amenity values and water quality
protection function. All known Koala habitat and Glossy Black Cockatoo trees shall be protected unless
specific approval is provided by Council. All native trees and vegetation must not be removed, pruned,
lopped, damaged or otherwise adversely affected without written approval from Council’s Manager –
Environmental Services.
Control burning is not an appropriate means of fire fuel reduction in the narrow areas of restored
bushland adjacent to residential areas. Therefore, fuel reduction in these areas will continue to be
undertaken by hand. The fire fuel load shall not exceed 10 tonnes/ha.
The presence and location of weed species in the covenant area will also be recorded and the weed
are to be controlled as per identified in the ERP (C&B Group, 2005).




PR18082_BIK_Settlers Cove Stage 4                                                                     Page 5

Page 10

                                                                       Green Tape Solutions
                                                                            Quality, Integrity, Experience

Additional planting within the fuel control areas must be fire retardant plants. A list of suitable species is
provided in Appendix 1 and comprises primarily low growing plants that will limit the development of a
vertical fuel load.
As per the ERP (C&B Group, 2005), the following specific task are to be undertaken within the
POSCWP:
•     Manual removal of fuel load (Dead wood) and excessive leaf litter adjacent (5-10m) to the
      development boundary;
•     Undertake weed control / removal to avoid disturbance where possible in steep area (identified by
      the restoration ecologist);
•     Weed removal/control to recreate natural environment and allow light penetration;
•     Placement of mulch in steep areas; and,
•     Use of watering systems that enhance fire protection.
Manual fuel reduction in the covenant area must be completed annually and prior to the onset of the
annual fire danger season, i.e. before September. The bushfire management specialist will advise the
best way to treat the surface and near-surface layers to achieve a forest fuel load of < 10 t/ha in their
annual fuel reduction report following a site assessment. As mentioned earlier, site --specific events will
influence the treatment required, e.g. fallen trees, proliferation of weed species, nest building by brush-
turkeys, surface water runoff, etc.
The fuel reduction performance objectives within the covenant area are:
•     treatment of weed species; and
•     combined surface and near surface fuel load are < 10 t/ha.
The fuel reduction performance objectives will be achieved by:
•     treatment of weeds in accordance with ERP (C&B Group, 2005); and
•     undertaking fuel reduction works in accordance with the bushfire management specialist’s annual
      fuel reduction report.
2.2     Removal of rubbish
Rubbish is to be collected during fuel reduction works and is to be disposed of at an off-site facility. The
covenant area must be free off rubbish at all time.
2.3     Weed Treatment and Removal
Weed treatment and removal is to coincide with manual fuel reduction works. Care is to be taken to
avoid soil disturbance on steep areas. Refer the ERP for further information about the weed
management within the covenant. The covenant area must be controlled for weeds at all time.
2.4     Fencing
A 1.2m high fence is to be installed to deter unauthorised people from entering the area except for the
proposed pathway access /boardwalk. The fence is to be fauna-friendly and have a lockable gate
accessible to authorised personnel only.
2.5     Maintenance of Fire Services
The property will be fitted with internal and external fire services. Relevant to the bushfire management,
a external fire hydrant is located on the edge of the covenant area as shown on Figure 1.
Maintenance of fire services such as hydrants, hose reels and taps, is to be performed in accordance
with the Australian Standard for Fire Maintenance Services (AS 1851-2012). A fire services specialist
must be engaged to provide advice and services in this regard. Once the fire services specialist has
been engaged they will be requested by the Body Corporate to provide a schedule of maintenance
activities required to comply with AS 1851-2012.
A pedestrian access path is provided to the buildings and the hydrants at the interface of the POSCWP



PR18082_BIK_Settlers Cove Stage 4                                                                     Page 6

Page 11

                                                                       Green Tape Solutions
                                                                           Quality, Integrity, Experience

and along the fuel control area. This path provides access also for Queensland Fire and Rescue Service
(QF&RS) turnout crews. Path must be signposted so that each building is easily identified by QF&RS
turnout crews and correspond to the information recorded at the Fire Indicator Panel.
In addition to the signposting, the management of all buildings will have, as part of their Evacuation
Management Plan, procedures for meeting the QF&RS turnout crews and escorting them to the alarm
origin.
2.6     Property Maintenance
To avoid any adverse impacts on the management of the covenant area, the Body Corporate must also
ensure the on-site manager performs property maintenance prior to the onset of the annual fire danger
season, i.e. before September.
Property maintenance is to include:
•     removal of material such as leaf litter from the roof and gutters;
•     ensure painted surfaces are in good condition with decaying timbers being given attention to prevent
      the lodging of embers within gaps;
•     check footpaths are in good condition with gardens not being too close and forming a potential
      obstacle;
•     check roof line for dislodged roofing material;
•     check screens on windows and doors are in good condition without breaks or holes in fly screen
      material and frames are well fitting into sills and window frames;
•     doors are fitted with draft seals and are well maintained;
•     door mats are of non-combustible material or are in areas of low potential exposure to embers; and
•     hazardous materials, e.g. barbecue gas bottles, are stored in a position shielded from bushfire
      hazard;
•     Maintenance of access gates to fire break, and,
•     Maintain taps, hoses and reels.




PR18082_BIK_Settlers Cove Stage 4                                                                 Page 7

Page 12

                                                             Green Tape Solutions
                                                                  Quality, Integrity, Experience



3. Preparation and Evacuation Management Plan
Should there be a fire outbreak, there are a number of critical points to be aware of. Only those
who are capable of working quickly before, during and after a fire front has passed should stay
behind to effect protection measures.
3.1        Step by Step approaches
1. Before you can confront an oncoming bushfire, it is important that you protect yourself from
    radiant heat. This can be assisted by wearing:
   • Cotton overalls or thicker long-sleeved shirt and long pants of cotton or wool clothes
       which are loose fitting;
   • A strong pair of shoes or boots with woollen or cotton socks;
   • Gloves, (canvas not plastic);
   • Goggles, if the smoke is thick;
   • A "bandana' or large handkerchief to protect the airways from smoke and hot air;
   • A wide-brimmed hat or hard hat if one is available; but
   • Leave your ears uncovered - they warn you of heat levels; and
   • Ensure you have a well -stocked first aid kit.
   • DO NOT WEAR SYNTHETICS - wear wool, cotton or denim.
2. Keep children, the elderly and pets inside the house;
3. Give them plenty of water to drink; and
4. Make sure you keep track of their movements.
5. Close windows and doors and any shutters and fit any screens;
6. Wet down wood piles and area of garden mulch.

When the bushfire is close:
1. Remain outside as long as possible patrolling the area for spot fires;
2. Suppress any spot fires which start close to the building or in the guttering;
3. Take refuge when the smoke starts to thicken;
4. Take your hoses and fittings inside when you move inside; and
5. Activate any sprinkler system.
6. Remain calm and keep other occupants calm.

WHAT NOT TO DO
  • Do not expose yourself to prolonged radiant heat;
  • Do not try to fight a fire front directly without adequate equipment and personnel;
  • Do not go outside while the fire front is passing (wait until it passes);
  • Avoid heavy smoke and don't drive in smoke; and
  • Do not run into unburnt area as burnt areas are safer.
3.2        Evacuation

The decision to evacuate or stay in the event of a major bushfire is one that should be considered
well before a bushfire event. Early evacuation is a serious consideration where:
      •   You are not confident that your building is prepared to withstand a bushfire;
      •   You are worried about your children or elderly members;
      •   You suspect that you or members of the household will be unable to cope with the stress
          of staying;
      •   It is safe to leave and you have a clear idea of where a safe refuge is to be found; and
      •   You know the destination to be safe.

Note: you must evacuate if directed to do so by the Police. Police undertake evacuations with
the advice of fire authorities.




PR18082_BIK_Settlers Cove Stage 4                                                           8

Page 13

                                                                    Green Tape Solutions
                                                                          Quality, Integrity, Experience


4. Implementation Plan
The developer/owner is responsible for fire management up until titles are issued. Thereafter,
the Bodies Corporate will be responsible for on-going fire management within the covenant area.
Table 1 provides a summary of the responsibilities for the implementation of the bushfire
management plan with the covenant area.

Table 1: Implementation plan for the bushfire within the covenant area
 Action         Responsibility    Timing/             Performance objectives                       Reference
 required       /who to contact   frequency
 Fuel           Body Corporate    At least            Building fuel control area:                  Section
 reduction in   and on-site       fortnightly from    •    treatment of weeds;                     2.1.1 Fuel
 the fuel       manager           September and       •    surface fuel layer is < 10 – 25 mm      control area
 control area                     March                    deep across 60 – 80% of the area;
                                                      •    Lawn maintained to < 100 mm in
                                                           height;
                                                      •    groundcover plants (including
                                                           plantings) in the near-surface fuel
                                                           layer are maintained to remove
                                                           dead leaves and trimmed to a
                                                           maximum of 30 cm in height;
                                                      •    No forest litter from the covenant
                                                           area in gardens; and
                                                      •    Lawn maintained to < 100 mm in
                                                           height;
                                                      •    Fire retardant vegetation trimmed
                                                           to 30cm in height; and
                                                      •    Gardens are maintained to
                                                           remove       dead      leaves     and
                                                           branches and forest litter from the
                                                           covenant area.
 Fuel           Body Corporate    Annually prior to   Covenant fuel control area:                  Section
 reduction in   and vegetation    the start of        •    All native trees and vegetation         2.1.2 –
 the            management        September                must not be removed, pruned,            POSCWP
 POSCWP         contractor                                 lopped, damaged or otherwise
                                                           adversely affected without written
                                                           approval from Council’s Manager
                                                           – Environmental Services
                                                      •    weed species are treated;
                                                      •    surface fuel layer is < 10-25 mm
                                                           deep across 60-80% of the area;
                                                      •    groundcover plants (including
                                                           plantings) in the near-surface fuel
                                                           layer are maintained to remove
                                                           dead leaves and are trimmed to a
                                                           maximum of 30cm high;
                                                      •    elevated fuel layer covers < 20%
                                                           of the area; and
                                                      •    no dead trees or dead branches in
                                                           canopy trees.
                                                      Covenant area:
                                                      •    weed species are treated; and
                                                      •    combined surface and near
                                                           surface forest fuel load of < 10
                                                           t/ha.
 Monitor fuel   Body Corporate    Annually prior to   Report from bushfire management              Section 2.1
 load and       and bushfire      June                specialist that identifies fuel loads and
 weeds in       management                            actions required to achieve fuel
 the            specialist                            control objectives.
 covenant
 area
 Remove         Body Corporate    Annually prior to   No rubbish in the covenant fuel              Section 2.2
 rubbish        and vegetation    the start of        control area and covenant area at all        Rubbish
 from the       management        September/durin     time.                                        removal
 covenant       contractor        g fuel control
 area                             works




PR18082_BIK_Settlers Cove Stage 4                                                                         9

Page 14

                                                                      Green Tape Solutions
                                                                            Quality, Integrity, Experience

 Action          Responsibility      Timing/             Performance objectives                  Reference
 required        /who to contact     frequency
 Manage          Body Corporate      Annually prior to   No proliferation of weed species.       Section 2.3
 weeds in        and vegetation      the start of        Weed must be controlled in the          Weed
 the             management          September/durin     covenant at all time.                   treatment/re
 covenant        contractor          g fuel control                                              moval
 area                                works
 Maintain        Body Corporate      Timing/             Compliance with AS 1851-2012.           Section 2.5
 internal and    and fire services   frequency is to                                             Maintenanc
 external fire   specialist          be in                                                       e of fire
 services                            accordance with                                             services
                                     AS 1851-2012
 Maintain        Body Corporate      At all times        Pedestrian access path is clear of
 pedestrian      and on-site                             obstacles.
 access path     manager                                 Signposting of the path is prominent
 to the fire                                             to QFES.
 hydrant on
 the edge of
 the
 covenant
 area and
 signposting
 Review and      Body Corporate      Timing/             Compliance with AS 3745-2010.
 maintain                            frequency is to
 the                                 be in
 evacuation                          accordance with
 manageme                            AS 3745-2010
 nt plan
 Prepare the     Body Corporate,     Annually prior to   Check and/or complete the property      Section 2.6
 building for    on-site manager     the start of        maintenance tasks in Section 3.8.       Property
 the fire        and residents       September           Barbecue gas bottles are not directly   maintenanc
 danger                                                  exposed to bushfire hazard in the       e
 season                                                  covenant area.
 Advise          Body Corporate      As new              Residents have been
 residents to    and residents       residents           advised/reminded to follow this BIK.
 review and                          arrive/annual
 adhere to                           review prior to
 this BIK                            September



References
C&B Consultants Pty Ltd (C&B Group) 2005, Ecological Restoration Plan & Specifications –
      Settler’s Cove, Noosa Heads, Report to Settler’s Cove Development Pty Ltd
C&B Consultants Pty Ltd (C&B Group) 2005, Fauna Management Plan, Settler’s Cove, Noosa
      Heads, Report to Settler’s Cove Development Pty Ltd
Green Tape Solutions, 2018, Fauna Management Plan for Stage 4, Report to Settler’s Cove
       Development Pty Ltd
LandGraphics Landscape Architects, 2005, The Landscape Master Plan, Settler’s Cove, Noosa
      Heads, Report to Settler’s Cove Development Pty Ltd
Standards Australia Limited (Standards Australia) 2009, Australian Standard 3959-2009
       Construction of buildings in bushfire prone areas, Incorporating amendments 1, 2 and
       3, 10 March 2009
WBM Oceanics Australia (WBM) 2005, Fire Management Plan Settler’s Cove, prepared for
     Settler’s Cove Development Pty Ltd, 21 July 2005




PR18082_BIK_Settlers Cove Stage 4                                                                      10

Page 15

                                                               Green Tape Solutions
                                                                    Quality, Integrity, Experience


                                                                                    Appendix 1

                                                           Fire-retardant Flora Species

         Species with fire retardant characteristic for fuel control area (consistent
                                   with the Landscape Master Plan and the ERP)

                Ground-cover species (Species for Fuel Control and POSCWP areas)
 Alpinia caerulea            Native ginger         Hibbertia scandens       Guinea flower
 Austromyrtus dulcis         Midyim                Hibbertia vestita        Hibbertia
 Cordyline rubra             Palm lily             Hybanthus stellarioides  Spade flower
 Crinum pedunculatum         Spider lily           Laxmannia gracilis       Slender wire lily
 Cymbopogon refractus        Lemongrass            Lobelia purpurascens     White root
 Cyperus polystachyos        Bunchy sedge          Lomandra confertifolia   Cushion mat rush
 Dianella caerulea           Parro lily            Lomandra longifolia      Long leaf mat rush
 Dianella longifolia v.                                                     Many flower mat
                             Smooth flax lily      Lomandra multiflora
 longifolia                                                                 rush
 Dianella revoluta           Flax lily             Panicum effusum          Hairy panic
 Euroschinus falcata         Pink poplar           Pielea linifolia         Rice flower
 Geitonoplesium cymosum      Scrambling lily       Rhodamnia acuminata      Cooloola ironwood
 Goodenia rotundifolia       Star goodenia         Scaevola calendulacea    Scented wire lily
                                                   Xanthorrhoea
 Hardenbergia violacea       False sasparilla                               -
                                                   macronema
 Hibbertia obtusifolia       Dilleniaceae
                         Canopy Species (Species for POSCWP area only)
                              Broad-leaved lilly
 Acmena hemilampra                                  Glochidion ferdinandi     Cheese tree
                              pilly
 Acmena smithii               Lilly pilly           Liviston australis        Cabbage tree palm
 Alphitonia excelsa           Red ash               Macaranga tanarius        Nasturtium tree
 Cupaniopsis anacardioides    Tuckeroo              Polyscias elegans         Celerywood
 Elaeocarpus Eumundi          Quandong              Syzygium austral          Scrub cherry
 Elaeocarpus obovatus         Hard quandong         Syzygium luehmanii        Small leaf lilly pilly
                              Umbrella cheese
 Glochidion sumartranum                             Syzygium oleosum          Blue lilly pilly
                              tree
                          Shrub species (Species for POSCWP area only)
                                                    Pilidiostigma
 Acronychia imperforata       Fraser Island apple                             Small plum myrtle
                                                    rhytispermum
 Acacia suaveolens            Sweet wattle          Pittosporum revolutum     Yellow pittosporum
 Austromyrtus dulcis          Midyim                Ricinocarpos pinifolius   Wedding bush
 Elaeocarpus reticulatus      Blue berry ash




PR18082_BIK_Settlers Cove Stage 4                                                              11

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW18-0253 - Approved Plans.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.