Skip to the record
Beware of cheap imitations.

Council archive · source document

TPC 1135 - Change Development Approval - Awnings [As Published] · 51901.4853.02

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

af

3

Our scheme aims to sharpen the finish of the North facing facade; by the

introduction of the awnings parallel with the street aiding connectivity between
Café Le Monde, the pedestrian and Berardo’s above thus enhancing the existing
building form by providing functional and understated contemporary elements.

As the focus of this application is at the ground level we feel this will not affect
the view corridor of the neighbouring business.

Having read our proposal in conjunction with the attached drawings, we hope
you will give favourable consideration to our clients’ request for the replacement
of the existing sail structures.

Thanking you in anticipation.

Yours faithfully,

tt Falconer
Director - Building Design

Enc,
«Kidd + Co Designers drawing no. $D.001.P1, SD.002.P1, $O0.201.P1, SD.202.P1, SD.501.P1,
$D.601.P1,
Cheque for application fee - $900.00.
Form 2 Development Application.
IDAS Checklist.
Owners Consent to Build.

c.c.
Belmondos - Perry Taylor.
Belmondos - Ryan Taylor.

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

TPC 1135 - Change Development Approval - Awnings [As Published].pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.