Council archive · source document
000A88A4.082.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 04:03.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:19.
5.3.3 5.34 As required by the National Water Quality Management Strategy “Guidelines for Sewerage Systems — Use. of Reclaithed Water and as detailed in the EMP a program will be developed and implemented to monitor effluent, surface:and . groundwater water quality to ensure the environmental values of the land and surrounding land are protected. k Drainage and Flooding Drainage was considered by Cardno MBK as part of its assessment. of infrastructure provision (see Annex E: Noosa North Shore Eco-Tourism Portal Infrastructure Assessment). The. assessment found that the proposed’ development does not alter existing drainage paths, which generally exit the development site on the northern and eastern sides. The nearest open water body is Lake Cooroibah, which is located some several kilometres downstream with extensive wetlands located between it and the proposed development. Potential impacts of development were assessed using AQUALM (XP Software) with established ‘parameters to determine potential pollutant loadings. The AQUALM analysis indicated that the. expected pollutant exporis from the proposed develapment can be reduced to-sustainable loads by the implementation of appropriate stormwater quality treatment measures. These measures comprise the use of filter strips/swales in the East Visitor . Precinct and the use of bio-retention systems followed by treatment within the proposed lake at the West Visitor Precinct. The AQUALM analysis also indicated that there is sufficient runoff in the West Visitor Precinct to maintain a functional body of water within the lake, provided infiltration losses are minimal. Given the size of the catchment and the topography of the site, there are predicted to be no flooding issues associated with the proposed Noosa North Shore Eco-Tourism Portal. Waste Management Waste Management at the proposed Noosa North Shore Eco-Tourism Portal will be conducted through the construction and operation of two waste transfer stations to be strategically located adjacent to the proposed sewage package treatment plant (for the East Visitor Precinct) and the proposed services workshop (West Visitor Precinct). Waste management practices will be based upon techniques that reduce the volume of waste produced, encourage reuse and recycling of waste products and minimises the volume of waste disposed to landfill. 8090476RP1/FINAL/19 SEPTEMBER 2003 ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA, 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.082.tifRelated documentApplication case desk ↗
About this file
- File size
- 53 KB (small file)
- File type
- TIF
No other editions are linked here.