19.   No construction work is to be undertaken until separate approval is granted by the
      Environmental Protection Agency (Coastal Management Branch) and any requirements of the
      Department of Transport and Department of Primary Industries have been met.
20.   The Development Permit for Operational Works lapses if the use has not happened by 30
      April 2011, unless an application to extend the currency is approved by Council.
5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Operational Work in a       Concurrence         Queensland             Marine Operations
 Tidal Area                                      Transport - Maritime   (Brisbane) MacArthur Ave
                                                 Safety                 East PINKENBA 4008

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
2.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      2.1.   On a Sunday or public holiday, at any time; or
      2.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
3.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for building works over the site.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).




                                                                                     Page 3 of 9

Used in these records

About this file

File size
248 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A690B.001.pdf · 248 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.