June 15, 2006

Noosa Shire Council

 

GO)

designers

 

 

 

 

Stephen Kidd

 

Principal
Land Use Department
PO Box 141 lan Gorton
Tewantin Q 4565 Associate

Attention: Nick Cooper

Carole Tretheway
Associate

 

 

Dear Nick,

Re:

20 Duke Street

Application for Operational Works Development Permit (2006 / 273 DA) Sunshine Beach QLD 4567
Duplex Dwelling, 74 Peregian Esplanade, Peregian Beach. QLD .

 

Postal address
PO Box 262

 

Noosa Heads QLD 4567

Enclosed please find the following information which forms our clients’ __

Telephone 07 6447 5633

 

application for a Development Permit for Operational Works for the above Facsimile 07 5447 5833

project. .
[email protected]

The enclosed documents address the following areas -car parking and access, [email protected]

storm water disposal. and sediment and erosion controls. (Landscaping to

[email protected]

follow under separate cover) www.kiddco.com.au

Completed Form A and Form E

Completed IDAS Assessment Checklist

Our clients’ cheque for the amount of $2,015.00

Kidd + Co Designers’ Drawing No. 0606.SK01 showing off-street parking

Cardno (Qld) Pty Ltd Engineers drawing
- 7494/1-SW11 — Site works layout plan / stormwater / gradings
— 7494/1-SW2 — Driveway section

Kidd + Co Designers Document Transmittal Form

Please proceed to process this application. If any further information is required,
please do not hesitate to contact me.

Yours sincerely,

lan Gorton

Enc.

Kidd + Co Designers
ABN 15 60B 699 524
Full text of the other 19 pages

Page 2

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

  

Common details

 

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested In the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 4. Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)
aa eae Te eae ie tend te nt | 74 Peregian Esplanade, Peregian Beach QLD 4573
required in relation to a mobile or temporary ro A 5 ny ,
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies if | n/a
development is proposed within a water body or — -
watecourse, 3, Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
iantied by lon plan descripion. Those deals [ Lot 351 on P93114
can be obtained from Ue documents orthrough Re 1 4 The above description is for: (tick applicable box)
local government. . .
However, if the land on which the development is L&I (i) the land on which the development is proposed; or
Franses Goes et have a ouaerboner Odi) the land adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed, or
0 ein meeotiodee C (ii) the water body or watercourse.
(ii) GPS coordinates where there is no . . .

adjoining/adjacent land (eg. in Moreton Bay). 5. Te / tenancy number: 6. co / level: ! 7. [oe area of land: (m? or “
Advice for completing Q7 - Q7 does not apply if the n/a nia 845sqm
davelopment is within a water body or watercourse.
Advice for completing Q8 - 8 applies if i i ic ci . , .
development is wihin a focal government area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Nota: Aras below high water mark are not within a | Noosa ]
focal government's area unlass provided for under the
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i |. i ‘te (i i
development en svategi portland ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area, For more details refer to Guide 11 | nia |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
If there is insufficient room available, details may be vacant |
provided in an attachment to the application.

11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
| Duplex Dwelling
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc)
Part A must always be accompanied by other [ art E |
completed parts of Form 1. For information about P
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicants name: 15. Contact person:
Clearly identify wha is making the application. The
applicant need not be the owner of the land. Te lan Gorton
When signing and fodging this application 44, Cont a b 16, Facsimile number/e-mail address:
The applicant is responsible for ensuring the . Lontact number:
information provided ts correct. The assessment 07 5447 5633 07 5447 5833
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when 17. Postal address: .
assessing and deciding the application. . 5
ihe apipicant is company - 2 contact person | c/- Kidd+Co designers. PO Box 262, Noosa Heads QLD 4567 |
18. Signature: 19. Date:

 

 

LY

Refer to atttached Part A - version 2.2

 

 

 

 

Page 3

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land owner’s consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the [PA prescribes that an
application must contain, or be supported pes Name Signature Date
written consent of the land owners, if the application
involves: (i) refer to attached Part A ver 2.2
(il) amatefialchangeofuse; fle eee eee eee ee beeen nee nee ee
(ii) reconfiguration of a lot; a
(ii) work on tand below high-water mark & not within a (ii)
canal as defined under the Coastal Protection and | | een ee ee eee eee ee eee eb eee ee eee
Management Act 1995;0¢ eve
{iv) work on rait corridor land defined under the (iii)
Transport tnfrastructure Act 1998. pee eee dene eee ee ee eee eee eee eee ee ech en ee een en ene
Section 3.8.1(2)(a) of the IPA provides that .
jandowner's cansent is not required for a mobile or (iv)
femporaryERA. fl peewee en nnn nn nn nn nn nnn nnn nn nn nn fn nnn nn nnn ne ce eee cece ee nw ecb ence eee wee]
For mora information refer to Gulde 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
9
Section 3,2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that =
involve a prescribed State resource. NO - go to Q24 O YES - go to Q22
Section 3.2.1(10)(a)(ii) of the IPA prescribes that an . gee . . . .
application cannot be taken to be properly made 22. This application is accompanied by evidence: (tick applicable box)
ve exience ae rescue entlement (11 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
ice for completing. Q: ree . . woe . . 9
Refer to schedule 10 of the integrated Planning Di) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go
required by the State in support of the lodging of this to Q23 envrwvvee—e—o—o—own—  ———
development application. . . . | .

D (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23

Advice for completing 023 _____ | 23. Evidence of the resource entitlement:

area ie oa ieee evidences (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)

application involves any water or riverine quarry {ii) Name of delegated officer

material under the Water Act 2000.

Section 3.2.1(5A) allows the arias to limit

the time the evidence may be used. (vi) must be iii it}

completed if the evidence is time limited. (i) Ce of delegated officer

(iv) Signature of delegated officer

(v) Date

(vi) ee date of evidence (if. ae

Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

hecompieton of Poe hia eofteramony ne Xl Yes (C1 NO - the assessment manager may refuse fo accept this application on the
must be completed for all other applications. grounds that the application has not been properly made

Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the apptication during public scrutiny or public
Notification fo understand the scope of the proposal
and any potential impact.

 

 

 

Plan / Drawing / Report Number Title Date
(i) 0606.SK01 Basement Plan Jan 06
s . Site works layout plan / ne
(i) 7494/1-SW1 stormwater / gradings 18-05-06
(ii) 7494/1-SW2 Driveway section 18-05-06
(iv)

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (eppiicabie to assessment manager's)

DATE

| FEE.) RECEIVED

REFERENCE

[ RECEIVING OFFICER'S
NUMBER/S

NAME/S:

Page 4

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

To.

Date of engagement

t

!

Notification of Engagement of Private Certifier (Optional format)

Accreditation Number. —— Name:

Signature:

Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

 

Page 5

INTEGRATED PLANNING ACT 1997

 

  

Common details

‘The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the comptated IDAS Assessment Checklist if

fequired, and by one (1) or mare other completed parts of the Form as required, For more information on the paris of the Form refer to wyrw.i

atch Bu.

Any information requested in tha form may be provided In an attachment to the application, For further Information about completing the follawing detalls, refer to Guide 1,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of fand 1. Street address: fncludinghouse number, street name, Suburbflocality name & postcode) (if applicable)
Bene eectetteampkcaton mushe [74 Peregian Esplanade, Peregian Beach Qld 4573 ]
Eauioarocen sega ore 2. Name of water bady or watercourse, within which the development is proposed: (tappicabk)
divi: co! + Q2 applies if

development is proposed within aaier body or La - _]
watecourge. 3. Lot on plan description (eg. Lot 123 on RP 4567}/ GPS coordinates:
Advige for completing Q3 - Most land can be
ienied by abt on plan deacon, These dais [ Lot 351 on P93114 |
Frat atained fam te docurentsrthmunhtia |, The above description is for: (ick applicable bax)
Howaver, the land co wich the devetopmentis (i) the land on which the development is proposed: or
Inadevebpranhi nepacea rant fe C1 (i) the land adjoining the water body or watercourse, within which the development is
watercourse} provide — proposed; or
a aianiagadgcoaiae ee Ci (ii) the water body or watercourse. ;
i) GPS coordinates where there i
" adpiningfadacynt and ‘eg Morton sy, |5. Shop/ tenancy number: 6, Storey / level: 7. Total area of land: (m? of ha):

fo + O7 does not apply tha [nla [na 845sqm |
development is within a water body or watercourse,
FE ee osetia, {8 Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ate) (it epplicabie}
Noto: Anas below high water mark ara not within a
focal goverment’ area unless provided for under the noosa _|
Local Govemment Act 1993, 9, Port authority for the strategic port land or strategic port land tidal area on which the
Pores ac orenolatng wot tera development is proposed (eg. Port of Brisbane, Port of Townsville) (# applicable)
Port tand tidal area. For more detais rafer to Gude 11 | Wa
Proposal details 10. Existing use of the land: (eg. vacani, single house, shop atc.)
If there is insufficiant room avallahle, details may be
provided in an atlachment othe appleaion. | vacant |

11. Proposed use of the fand: feg. 6 unit apartment butting, 30 fot residential: subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
| duplex dwelling |

Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Pari D, Part /, atc)
Part A must ghways be accompanied by other i
completed parts of Form 1, For information about
when 2 part of Form 1 may apply refer to Gua |,
Applicant details 13. Applicant's name: 15. Contact persan:
Cloarty identify who is making the application. The i
appicant need not be the rer of te fad. Aaa ton a Company Nadine Gorton

signing and lodain catio a - 5 16. Facsimile number/e-mail address
The applicant is responsible far ensuring the 14. Contact number:
information provided is correct. The assessment or 5 447 5446 ‘
manages, any referral agency & the Chief Executive 07 5447 4556 [email protected]
(where applicable} wil rely an this information when 17. Postal address:
assessing and deciding the application. . :
{tthe applicant is a company - a contact perean [ C/- Martoo Consulting, PO Box 1684, Noosa Heads Qld 4567
must be shown,

18, 19. Date

 

 

Signature: A, ,
&

7-0

 

 

 

Page 6

suo vn cuup t:uarn

TUNT

ritébrknty
:

vue ssDripss

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|)

ond my other relevant part of Form 4.

 

OFFICE USE ONLY (appicabl 0

Plan { Drawing # Repart Number

‘pplication

 

 

 

 

 

 

RODSS1-1-A

PLEASE NOTE: The amgassmen! manager may refuse to senept an appicetion thet, 61 tho fie of edgement

 

Proposal Report (including

 

 

 
 

fats to provide all applicable. information requkad by Part A

 

 

 

 

 

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004

Form 1 Development Application

 

Operational &/or building work '%

assessable against a local government's planning scheme <i

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (inctuding detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and
development to occur, while a preliminary Oo infrasins nay ap provide details of the type of work eg. roadwork, stormwater, water and sewerage

approval is a step in the approval process
and does not authorise development to occur.

The types of work that are assessable against|
a planning scheme are determined by the
scheme for a particular local government and
will vary across the State.

To determine the types of work that are
assassable under a particular planning
scheme, contact the relevant local
government.

 

 

AND/OR

x{ Development permit - provide details of the typa of work eg. roadwork, stormwater, water and sewerage
infrastructure, ete

OPERATIONAL WORKS —

LeloScrpina, , SToRmwalee, .
SIT & SED MEST CoNTROL ,
Dawewm) Ad PrRcidd -

 

 

2. Are the works subsequent to a previous development approval?
x NO CI YES - provide details of all pravious approvals (eg. file referances)

Wi) APR IcATION 2006/27
cokes) Beitcar ASSESOED.

3. Is the subdivision for a canal estate?

NO
YES

Portable Long Service Leave levy (if | 4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

ficable
appice® fe} . , Baves - complete Q5
Prior to issuing a development permit for the

works, the assessment manager is required LINO - 05, 6 & 7 do not apply

 

 

 

 

 

 

Page 8

INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004

by law to “sight” an approved form, issuedby |5. Has the PLSL levy been paid?
Qleave, which signifies that the PLSL tevy
has been paid. LD YES - compieteas

gw NO - the applicable levy must be paid before a development permit can be given for the works

6. How much was paid?

7. What is the receipt number of the payment?

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

 

OFFICE USE ONLY (applicable to assessment manager) :
| DATE RECEIVED | REFERENCE NUMBERIS |

 

 

{i) ts a PLS levy applicable in this instance? CINo [YES - complete afi
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application? No (1 YES - provide receipt details below

[

 

 

 

 

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005

 
   

Form 1 Development Application

IDAS Assessment
Checklist

{Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
4. This checklist was formerty referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.9. Environmental Protection
Agency, Dept. of Natural Resources and Mines, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.

Therefore, the completion of all questions In section 1 of this checklist is mandatory for all applications {other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination®.

To assist you in answering the following questions a series of guides are available free from www.ipa.qid.gov.au.

9, — Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.

10. Section 2 provides advice about the referrals that can be required for applications for building work assessable against the Standard Building Regulation 1993 (SBR).

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Standard Building Regulation 1993 (SBR).

 

NP oS

@

 

 

 

 

Environmentally relevant activity 1. The application involves: (tick applicable boxes)
For mare information refer fo Guide 4, C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
anes you eee coecnentty tie e"to.QT, the has not been made - complete Part G of Form 1
administering authority’, C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
t an entity, ater than the Eiminiteng hy, Is made - complete Part G of Form 1
le assessment manager for the application, pee
administering authority is a concurrence agency for & (ii) none of the above
the application in relation to this matter.
Note: An application involving ERA 19 and/or 20 will
also require completion of Part Kr of Form 1 for
approval where an allocation under the Water Act
2000 is required.
State-controlled road matters 2. The application involves: tick applicable box/es)
i i Guide 3, : .
tne yor rowed noe, tthe above" to 02 ine C1 (i) development on land contiguous’ to a State controlled road and for -
applcaton tages tft to the Department of (J (a) material change of use assessable against the planning scheme;
in Roads as a referral agency. .
In certain circumstances DMR will be an advice O (b) reconfiguring alot unless -
agency, white In other circumstances DMR will be a « the total number of fots is not increased; and
conte bat hath Re ston wil axistyouto « the total number of lots abutting the State-controlied road is not increased;
determine where DMR is an advice or concurrence (1 (©) operational work (not associated with a materia! change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an appiication is prescribed in schedule 8A of the IPA.

2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant tocal government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

4 Land contiguous to a State-controiled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlied road; or that is part of a future State-
controlted road.

Page 1

Page 10

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

IDAS Assessment Checklist, Version 15.0, 18 November 2005
CJ (i) development on land not contiguous to a State-controlled road and -
LJ (a) material change of use - ‘
* assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule;
( (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
¢ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

KX (iii) none of the above

 

Clearing vegetation

For more information refer to Guide 12,

Untess you answered ‘none of the above" to Q3, the

pplication requires assessment by the Department

of Natural Resources and Mines (NR&M).

If an agency other than NR&M is the assessment

manager for the application, NR&M is a concurrence
+ agency for the application in relation to this matter.

The application involves: (tick applicable boxes)
OO (i) material change of use ~
(a) assessable against the planning scheme;
(b) on a lot containing - ,
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
{d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
C1 (i) reconfiguring a lot -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) -where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Di) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

KI (iv) none of the above.

 

Strategic port land

For more information refer to Guide 11,

{fF you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

ifyou ticked {ii) Queensland Transport is a
coneurrence agency for the application.

The application involves:

(1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1

Ci (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1 ”

(iii) none of the above

 

Acid sulfate soils

For more information refer to, Guide 10,

Unless you answered “none of the above” to Q5, the
application requires assessment by Department of
Natural Resources and Mines (NR&M).

If an agency other than NR&M is the assessment
manager for the application, NR&M Is an advice
agency for the application in retation to this matter.

 

The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)

(1 (i) below 20m AHD® and the development will involve the excavation of 1000m3or more:of
soil or sediment at or below 5m AHD, or

C1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material

(iti) none of the above

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Australian Height Datum (AHO).

Page 2

Page 11

INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

Ifyou answered "YES" to 06, the application
requires assessment by the Department of
Ememency Services (DES).

If am agency other than DES is the assessment

manager for the application, DES Is a concurrence
agency for the application in relation to this matter.

IDAS Assessment Checklist, Version 15.0, 18 November 2005

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

NO
(DYES - complete Part L of Form 1

 

Water related development under the
Water Act 2000

For more information about items (a} - (d), refer to
Guide 15. For more information about item {e),
Tefer to Guide 14 Does my application involve
assessment of a referable dam?

Untess you answered ‘none of the above" to Q7, the
application requires assessment by the Department
of Natural Resources and Mines (NR&M).

If an agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
agency for the application In relation to this matter.

 

The application involves:

C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

Ota)

Di (b)
O(c)
Di)
Oe)
On

in a watercourse, fake or spring, or from a dam constructed on a watercourse (eg.
@ pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ks, Ks, Ke, or Ko of
Form 1 whichever is applicable;

for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;

for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1;

for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K; of Form 1,

for constructing a referable dam® or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; or

for taking or interfering with overland flow water - complete Parts Ke and G of Form 1

1 (ii) none of the above.

 

Removal of quarry material froma
watercourse

For more information refer to Guide 16.

If you answered "YES" to Q8, the application
requires assessment by the Department of Natural
Resources and Mines (NR&M).

If an agency other than NR&M is the assessment
manager for the application, NR&M is a concurrence
agency for the application in relation to this matter.

Note: Part G of Form 1 is required to be completed
as the activity of removing quany material from a
watercourse is also an Environmentally Relevant
Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Wafer Act 2000?

INO

(DYES - complete Parts K; and G of Form 1

 

 

Operational works in a tidal area or
coastal management district

For more information refer to Guide 18. For more
information about prescribed tidal work in local
government tidal areas refer to Guide 24,

Unless you answered “none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA Is the assessment
Manager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for afl
prescribed tidal work.

 

 

The application involves operational work that is: ( tick the applicable boxes)

E (i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; of

tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF

carried out within a coastal management district under the Coastal Act and for — complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.

Diti
0 i)

Ol)

[7] (b)
Dt)
CI (a)
Ole)
Ot
Og

Oth)
Of

constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Wafer Act 2000 ;

constructing a canal’? intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;

interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

1 (iv) none of the above.

 

7 The declared ground water areas are listed in Guide 13 Development in ¢ declared catchment area.

8 Referable dam is defined under the Water Act 2000.

3 Watercourse is defined in sch 10 of the IPA.
10 Tidal work is defined in sch 10 of the [PA.

411 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastaf Protection and Management Act 1995

Page 3

Page 12

 

 

 

 

 

 

 

areas
For more information refer to Guide 18.

Unless you answered ‘NO” to 14, the refevant Port
Authority is the assessment manager for the
application and the Enviconmentat Protection
Agency (EPA) and Queensland Transport (QT} are
concurrence agencies for the application.

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es}
mark i) ti AS nder the Co: ie
For more information refer to Guide 18, For more OD (i) tidal work's as defined undei | 1 astal Protection and Management Act 1995 (the
information about prescribed tidat work in locat Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; OF
goverment tal areas refer to Guide 24 LD (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
Untess you answered ‘none of the above” to Q10, ee . a pet
the application triggers referral to Queensland O iii) carried out within a coastal management district'S under the Coastal Act and for -
‘Transport (QT) (Maritime Safety Qid) as a on : . eg
aero agency. me 8 (a) _ disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager fot all MofFom 1;
preseribed fda work. (Db) reclaiming tand under tidal water - complete Part M of Form 1; or
(J (c) constructing a canal", if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1;
EX (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information rite on [J (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11, ‘i, i ictrinti5
the spptation requires assessment bythe work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). (i) a material change of use assessable under a planning scheme involving building
If an agency other than EPA is the assessment } i istrit is —
rar the coptccion EPA is a concurence work, carried out completely or partly in a coastal management district that is
agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
(ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'S — complete Part M of Form 1
J (v) none of the above
Development within the limits of a 12. Does the application involve development below high water mark'? and within the limits of a port
port under the Transport infrastructure Act 1994?
For more information refer to Guide 18. For &® NO
information about prescribed tidal work refer to
Guide 24, (7 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
ifyou answered “YES” to Q12, the application
‘tiggers raferral to the Port Authority.
The Port Authority is a concurrence agency if the
development Is -
@ within 200m of a shipping channel or an entry
and exit shipping corridor for the port
«@ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned part facility identified
in a land use plan approved under the Transport
Infrastructure Act 1994.
{n all other situation the Port Authority is an advice
agency.
Marinas 13, Does the application involve operational work that is tidal work for a marina? with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
fdal work refer to Guide 24, The local government XI NO
§ the assessment manager fr all prescribed ida (CIES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
(fyou answered “YES* to Q13, the application
triggers referral to Queenstand Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal| 14, Does the application involve tidal works within a strategic port land tidal area2"?

No
[YES - compiete Part M of Form 1

 

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and inciudes certain tidal works completely or partly within a focal government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastat management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.

16 Canai means canal as defined under the Coasta! Protection and Management Act 1995

17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

18 Under s117 of the Coastal Profection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an arlificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.

20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.

Page 4

Page 13

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
It you answered "YES" fo Q15, the application & NO
‘triggers referral to the Queensland Heritage Council
as concurrence agency for the application. O YES- complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the declared involves: (tick the applicable box/es)
thi , refer to Guide . . . . _

gens fn Queensland, refer (CO ()__ reconfiguring a fot, if any tot resulting from the reconfiguration is less than 16 hectares;
tnless you answered “none of the above" to ate, LI (ii) development assessable against the planning scheme involving the establishment or
Ce eT Natal Rec ua ices expansion of a waste water disposal system, other than a disposal system for carrying
(NR&M). out an environmentally relevant activity under the Environmental Protection Act 1994;
Hf an agency other than NR&M Is the assessment ae
manager for the application, NR&M Is aconcurrence (iil) none of the above
agency for the application in relation to this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use and / ; ji j i: -
or reconfiguring a ot may tigger tis referal Da reconfiguring alot for which all of part of the premises are
For more information refer to Guide 5. (a) premises mentioned in the IPA, schedule 8, part 1, table 2—
Unless you answered ‘none of the above" to 17, « item 5, including the exemption otherwise provided for by paragraph (d);
the application requires assessment by the « item 6, including the exemption otherwise provided for by paragraph (e); or
Environmental Protection Agency (EPA). If an 7 « . . . . ae sa
agency other than EPA is the essessment manager ¢ item 7, including the exemption otherwise provided for a mining activity or petroleum
for the application, EPA will bea concurrence activity; or
agency forthe application in relation to this matter. (b) in an area for which an area management advice has been given for unexploded

ordnance - complete Part N of Form 1 :

C1 (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
& (ii) none of the above

Electricity infrastructure 18, The application involves: (tick the applicable box/es)

For more information refer to schedule 2of the IP
Regulation,

Unless you answered ‘none of the above" to Q18,
the application triggers referral to the agency to
which the easement is aranted in favour of as advice
agency.

 

(1 (i) reconfiguring a tot where any part of the lot is -
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Oi)

Oi

Oi tiv)

 

 

21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port and.

Page 5

Page 14

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Land designated for community 19. Does the application involve development assessable against the planning scheme and on tand
infrastructure designated for community infrastructure?

Applications involving development on land .
designated for community infrastructure may trigger
this referral.

For more information refer to schedule 2 of the IP
Regulation.

lf you answered “YES” to Q19, the application
requires assessment by the chiet executive of the
department administering the Act authorising the
development for the designated purpose.

tf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter,

(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
KINO
DYES .

 

SEQ Regional Plan

For more information refer to schedule 2 of the IP
Regulation.

Unless you answered "none of the above" to 20,
the application requires assessment by the Office of
Urban Management (OUM).

20. The application involves a material change of use of premises in the SEQ Region?? for: (tick the

applicable box/es) .

(1) _ urban activities?3, other than where the premises are zoned for urban activities under a
planning scheme in a rural village®4 or the Mt Lindesay/North Beaudesert Study Area, for
which all or part of the premises, the subject of the development, is in the -

(a) Regional Landscape and Rural Production Area;

(b) Rural Living Area;
(c) Investigation Area; or
(d) Mt Lindesay/North Beaudesert Investigation Area.

(ii) rural residential purposes?5 where the premises are not zoned for rural residential
purposes and the premises are in the -

(a) Regional Landscape and Rural Production Area;

(b) Investigation Area; or

(c) MtLindesay/North Beaudesert investigation Area;
(iii) none of the above

 

Fisheries matters
For more information refer to schedule 2of the [P
Regulation.

Unless you answered “none of the above” to 021,
the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F).

(f an agency other than OPI&F is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in relation to Items (j) -
{iv) and an advice agency in relation to item (v).

21.

 

The application involves: (tick the applicable box/es)

CI (i) anassessable material change of use for aquaculture - complete Part O: of Form 1;

(1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

LC (iii) assessable operational work completely or partly within a declared fish habitat area-

complete Part O2 of Form 1;

assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part Oz of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

none of the above.

Ow)
Ow
WI (wi)

 

22 Local Governments within the SEQ Region are identified in the South Easi Queensland Regional Plan as Beaudesert Shire, Boonah Shire, Brisbane City, Caboolture Shire, Catoundra City, Esk Shire,
Gatton Shire, Gold Coast City, Ipswich City, Kilcoy Shire, Laidley Shire, Logan City, Maroochy Shire, Noosa Shire, Pine Rivers Shire, Redcliffe City, Redland Shire and Toowoomba City.

23 Urban activity means urban activity as defined in schedule 2, Part H Regulatory Provisions, South East Queensland Regional Plan. The term inctudes some facilities and purposes and excludes some
purposes. A single residential dwelling on a lot is not included in urban activity.

24 Rural village means rural village as defined in schedule 2, Part H Regulatory Provisions, South East Queensland Regional Plan.

25 Rural residentia! purpose means rural residential purpose as defined in schedule 2, Part H Regulatory Provisions, South East Queensland Regionat Plan.

Page 6

Page 15

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For mora information refer to Guide 23, schedule 8A
of the IPA, & schedule 2 of the IP Regulation.

Uniess you answered “none of the above’, the
application triggers referral to QT as a concurrence
agency.

IDAS Assessment Checklist, Version 15.0, 18 November 2005
22. The application involves: {tick the applicable box/es})—

1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

C1 (ii) reconfiguring a tot—

C1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

C1 (b) on lang that is completely or partly within a future public transport corridor or
an airport's public safety area;

Cl (c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(CJ (d) for a residential purpose within the 25 ANEF contour for an airport;

Ce) _ for aresidential purpose resulting in 100 or more allotments.

LD (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) _ will result in work that encroaches into an airport's operational airspace.

EX] (iv) none of the above.

 

 

Railway safety and efficiency

For more information refer to Guide 23, schedule 8A
of tha PA & schedule 2 of the |P Requlation.

Unless you answered “none of the above", the
application triggers referral to QT as a concurrence
agency.

23. The application involves: (tick the applicable box/es)—

( (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

O (ii) reconfiguring a lot—

(a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement,

(1 (b) — on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

CJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

LJ (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

Ce) ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

(J (f) for a residential purpose resulting in 100 or more allotments.

LD (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—

C1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(J (b) is completely or partly within future railway land, or a railway tunnel easement;

(1 (c) abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
EX] (iv) none of the above.

 

* Referral coordination

An information request requires referral coordination
if the application involves -
(} 3. or more concurrence agencies; or
(ii) a factlity or area assessable under a
planning scheme and prescribed in
schedule7 or 8 of the IP Regulation; or
(ii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the IPA.

For more information go to Guide2 and Guide 6,

24, Does the application trigger referral coordination?

ie)

(YES, as the application: (tick the applicable box/es)

 

 

C1 (i) triggers 3 or more concurrence agencies;

LU (ii) involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

Li (il) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

LA (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA

 

Page 7

Page 16

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 15.0, 18 November 2005
Referral agency responses priorto | 25. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the

lodgement application was made to the assessment manager?
Under 53.3.2 of IPA a referral agency may give a w NO

referral agency response on a matter wai Its

jurisdiction about @ proposal before an application . fi feral

for he proposals made to the zsessment (1) YES - attach @ copy of the referral agency/s response/s
manager.

This is commonly the case where an application

requires referral to a building referral agency (eg.
Qkd Fire and Rescue Service}.

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Checklist (if applicable).

OFFICE USE ONLY (applicable to assessment manager)
| DATE RECEIVED | I REFERENCE NUMBER/S |

 

Page 8

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 15.0, 18 November 2005

 

SECTION 2 - BUILDING REFERRALS (completion not mandatory)

Note: Below is alist of the referrals that can apply to an application for building work assessable against the Standard Building Regulation 1993 {SBR)). This section of the
IDAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the SBR only.

 

Fire safety

For more information go to scheduts 2 of the IP
Requiation

1.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the
building work the subject of the application requires the installation of a fire safety system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For more information go to schedule 2 of the IP
Requiation

 

Fire safety for budget accommodation [2 An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the
fe PP Lic 9)

For more inert go schedule 2 of the IP building work the subject of the application requires the installation of a fire safety system for a
budget accommodation building.

Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a

Fe information go to schedule 2 of the IP i ication i i 4 inti

Reaction goto sched concurrence agency if the application involves a workplace incorporating spray painting.

Retail meat premises 4. Anapplication may trigger referral to Safe Food Qld as a concurrence agency if the application

For more information go to schedule 2 of the [P involves a retail meat premises.

Regulation

Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the

For more information go to schedule 2 of the IP application involves a private health facility.

Regulation

Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice

For more information go to schedule 2 of the IP agency if the application involves a work place area less that 2.3m?.

Requlation

Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or|

road advice agency if the application involves land contiguous to a State-controlled road.

For more information go to schedule 2 of the IP

Regulation

Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a

For mor informaton go fo schedule 2 of he [P concurrence agency if the application involves pastoral workers accommodation.

Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency

For more information go to schedule 2 ofthe [P if the application involves a childcare centre.

Requtation .

Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a

fue go to schedule 2 of the IP concurrence agency if the application involves tand completely or partly seaward of a coastal
building line?é.

Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the

For more Information go to schedule 2 of the [P ication i 7 ji

eculat a u application involves a heritage registered place.

Fishertes matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries

For more information goto schedule 2 ofthe IP (DPI&F) as a concurrence agency if the application involves assessable building work in a

Reaulaion declared fish habitat area; or as an advice agency if the application involves assessable building
work on land that adjoins a declared fish habitat area.

Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the

transport application involves existing or future public transport corridors, or airport operational airspace?”,

.For more information go to schedule 2 of the [P

Regulation

Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the

application involves future railway land.

 

 

 

28 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
@ Operational airspace is as defined in State Planning Policy 102 “Development in the Vicinity of Certain Airports and Aviation Facilities".

Page 3

Page 18

kidd
+CcO

designers

20 Duke Street
11.0 10.0 Re reek LD 4587

PO Box 252
Noosa Heads QLD 4587

‘Telephone 07 54d? S633
Fecsimie 07 S447 5833

 

 

/

~~ _ Infof®kiddeo.com.au
/ swevvkddoo.com. a

‘Tha drewing in tobe
‘odin corjencton with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AQVNVIdSS NVISS3edSd
:
t

 

 

 

 

 

 

 

 

 

PEDESTRIAN ACCESS

 

20 m setback fine

 

 

 

Prget
PROPOSED NEW
DUPLEX

Loceien
74 PEREGIAN ESPLANADE
PEREGIAN

 

BASEMENT FLOOR PLAN...

Cent,

WELLCLOSE PASTORAL CO.
Detail

BASEMENT PLAN

‘Scale Dele =
1:200@A4 JAN 06

Oren By

deb No
IAG Value field empt

0606.SKO1.

 

Page 19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ZMS-L/P6bL wos fener eg LENS | see nme: 5 anya tmraccmes PSH soi any js
‘uelBaleg penne 290 700 190 £0 ‘NEY 54 e260 BA AO) upon) AS wa ML BD
‘ wD pr Aig (PID) CUPIED ‘2a pi 0 yon OM 10) SBE BT fd (OND) OUND A PRCNPOHD §| HAUG 9
“on yeaa ‘epeueldsy uelBeed ps fag fone wa “Toda “c3K0ude | -NYH ‘foud ‘agONgRINODIN
oes
OOZSOrEL vo XaF1dNnd assodoud woe oup.Jiegd Ly an Foe ee a une ree peer in
. emus ‘OHV ‘Walva TRNVEO | PURO Ag xD) cured 01 thsnIG Cav mao It Ad Pum oars Ag HONS
O09 WHOLSVd SSOTOTISM eo ao =SNDRSAO “9002 PONRSEH SMGIH ITy PIT Aid (PIO) UPI G)
2v Lv O14
vO
VY NOILISS AVMSAIO
‘yed moyy puey2a0
VY LMS-1/7674 Bumesp uo
Gedioog 40} UR}g INOAET B95
burysixg
L
L
oS — Trenanragy x — =
3 ia 88S bu COPE 5
q
see in
Tse [NaW3s¥g]
SCR
Be
v
3E
t \.
‘ISN
se 3 Ez
ele e s
ae 5 3
we la
gs 8
ae -
3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

 

 

 

 

~ rw arenine a : 28 aru)
- SBUIPEID / JJEMULIOIS / UEIel MOLL] SHON BUS | gars yea coor crte sean too sa «SEE A "Rcntnocare aay SMB 6s nr sacs vrs oN Sens —anscraratianeweniets urbe HE THEATTEOE ge tama esp a Ee eet aman [SO oes =
LMS-L/Pp6PZ veiberes Sie wneud nies ritrnat mecmne empresa
' Seaz tear wo ee PIT Ad (PID) OuRIEg {yer 2 Wm 14 KOON BT Aig OID) DULG Aa DUNO MRR WH,
‘apeue|ds3 ueBaled ¢2 Sere ree ual ag tnt "uIO “oud “aRACuddy | "NYA Tous “a3QNaNnOOR
oN ONUAYIO T Bise 4 ; 2
"2a 00z/S0IET =v xaldng dasodoud fexeire Go aoe AEORHO| guts indus eaten oops pom fa bee nk
: sco "= oupJleg ‘ay ‘ania! LW S| nse aneen nes a aaa
09 WHOLSVd ASOTOTIAM ear eee aaNOSIO ‘900g pawesou sui ty PIT Aid {PIO} OUPIED
“Lewis 20 95Les UHM O9s9E :
6 Buysoddns yas Aynp . NOLLONALSNOD HO Y30N2.L HOS LON
“ A'INO 3NSS!I G29NVAGQV
“syuawauinbas ‘GT's yy!4 Aldwoa 0] yuajeainba wo
deal queqn}sd $8045 G4+1Id9G Koy $940UdQ, ‘Vad
‘yPAa| a2ejANs paysjuy pasodoud sayousg &
Joa] areyuns Guiys}xa sayouag wu x
y
ONS
HL¥dL004 31343NO) 2v L¥ 0024

DaS/EZ 5/020
96494 04 1184, 491100 Jad

 

"aaj5Ues} qyedIOOS

 

70
m
2
m
Q
>
z
m4
7)
$
2
Pr
=
>
oO
m

298/16) 6/020

96594 04 N1EMH 4100 Jad

 

           

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

      

ty 1¥ ool
Js NV 1d LNOAVT SMYOM SLIS
+ S/F
~
a *
a =
1
+
, 3
1 ee $ 2
s a s°
+
\ ©o AVARAIUO
| or ODE ued aBes04s TW ONINIVL3Y BBBHIL | is.
Jayemwsoys punosbsapuy, 4 . “
Pts La Sp i £ if ge) )
pets a - Se
y war ok Teo. 200) =
a eds vm zie =
1 .
69 iO =
L fon, ST
o at Har ™ we. [=
. J 80517 > ue 4B doy 7 uoyeya6=4 40 9673
| SPOT Tees Ane oF » * \
~deo io .
. 5 ——--\
‘ y
Poo , N1Ebd |
fy
on LSE + y |
Ie co
fh |
ie mS \ s -
E x \ Les He
s
Salat Kemeny Rope, € -
‘ vs |e $ > ayasau0 m +
NY g. ends ud © P 44900) v | sujewas &
3 424900 BE “Ww at 4 nity Wengen
ls ; ES rT
| BM |
§ + |
‘ Ee Ee | %
F F 098 Tu
aAN) yooTd
sl c
a =
* t
3 o
cS —_—— —_—_— oo
itd _ Zz. +L 7 S]
WH 4.) bee OV a ee —- ey
L BOSI7Z WoL < —L_ fost NF ap MHERISOH 9001 “sano J00)) jo aur) .
w le \ = Es
5! 1s q f
& y el 3
2/-~——__] ~— “WOD0E yuey aGeso4s ‘WRap 440 4nd
& d & Q J84RAWs04$ punosBsapup) payens adesspuey ~
2! , TV ONINIVLGY: BRAWL x
3 o9%67u >
agedyy 2009 wp aavas 2
wal =
©
: =
surewas ~
N Tes leangen
s
&

 

 

 

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.