Council archive · source document
06/1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published] · 142006.1304
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
Form 1 Development Application
Operational &/or building work '%
assessable against a local government's planning scheme <i
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (inctuding detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and
development to occur, while a preliminary Oo infrasins nay ap provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against|
a planning scheme are determined by the
scheme for a particular local government and
will vary across the State.
To determine the types of work that are
assassable under a particular planning
scheme, contact the relevant local
government.
AND/OR
x{ Development permit - provide details of the typa of work eg. roadwork, stormwater, water and sewerage
infrastructure, ete
OPERATIONAL WORKS —
LeloScrpina, , SToRmwalee, .
SIT & SED MEST CoNTROL ,
Dawewm) Ad PrRcidd -
2. Are the works subsequent to a previous development approval?
x NO CI YES - provide details of all pravious approvals (eg. file referances)
Wi) APR IcATION 2006/27
cokes) Beitcar ASSESOED.
3. Is the subdivision for a canal estate?
NO
YES
Portable Long Service Leave levy (if | 4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
ficable
appice® fe} . , Baves - complete Q5
Prior to issuing a development permit for the
works, the assessment manager is required LINO - 05, 6 & 7 do not apply
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1304 - Operational Works for 74 Peregian Esplanade, Peregian Beach [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.