Item 2 – Provide an accurate slope analysis plan of the site.
Item 3 – Provide information on the subsurface conditions down-slope of the units and towards the
creek to adequately assess the stability of the site. Provide an assessment of the subsurface
conditions by an experienced geotechnical engineer with relation to the stability of the site.
Response – Included at Attachment 5 to this response is an updated Geotechnical Assessment
prepared by Core Consultants which provides a comprehensive updated assessment of the items
identified above.
Overview of Approach to Slope Stability
Item 4 – Provide information on how the water quality of the creek will be monitored and
maintained during construction and the proposed use of the site. Demonstrate no worsening of
water quality and quantity will be achieved through the management of the site.
Item 5 – Provide information regarding the stabilisation of the site, both during construction and
the proposed use of the site.
Response – Our geotechnical consultant has reviewed these information request items and
determined that they are predominantly civil engineering matters and therefore have been dealt
with in the Engineering Report at Attachment 4, however Section 7 of the Geotechnical
Assessment provides slope stability recommendations that should be taken into account during
site preparation and in the ongoing design.
Item 6 – Provide the following additional information:
i. Advice is required on the locations to which the footing design recommendations apply. Do these
recommendations apply to all footings or only those footings within 20m of the creek?
ii. The method to be adopted in estimating the lateral loads on the piles should be confirmed. There
are several approaches available for this design.
iii. The geotechnical design parameters to be adopted in the design should be confirmed. There is
an inconsistency between the parameters quoted in Table 1 and Table 5 of the Golder Associates
Report.
Response – The Geotechnical Assessment included at Attachment 5 clarifies that the footing
recommendations apply to all footings across the site. Section 6.3 of the report provides
confirmation of lateral load calculations as well as clarification of geotechnical design parameters.
P: 07 5452 5207
E: [email protected]
45 First Ave, Mooloolaba Qld 4557
PO Box 1043 Maroochydore Q 4558
Page 3 of 19 townplanningsunshinecoast.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Response letter to Council Information Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 649 KB (small file)
- File type
No other editions are linked here.