Council archive · source document
Attachment 2 - Body Corporate Authorisation Resolution · 51994.1391.01
↵ 23rd December 2022 TO ALL OWNERS FOR YOUR INFORMATION BODY CORPORATE FOR BELLE DE JOUR CTS 15342 VOCM - LOT 2 REQUEST APPLICATION FOR RENOVATIONS We refer to a Voting Paper of 12 December 2022 sent out to all Committee and advise that the following Motion has been carried: VOCM - LOT 2 REQUEST APPLICATION FOR RENOVATIONS COMMITTEE RESOLUTION _______________________________________________________________________ VOCM – LOT 2 PERMISSIN TO UNDERTAKE REONVATOINS TO THE LOT COMMITTEE MOTION: That the Body Corporate permits the Owners of lot 2 , to carry out renovations to the Lot subject to the following conditions : Conditions: That the renovations are carried out in accordance with the plans and specifications provided in the Owner’s application; That the cost of installation and future maintenance of the renovation works are the responsibility of the Owner of Lot That the renovations are completed by a suitably qualified tradesman/Builder; That the renovation meets any Council requirements and any relevant Building Code Contractors work in a proper and workmanlike manner and in accordance with all Requirements; Obstruction: the occupier / contractor shall not obstruct lawful use of common property by any person, or allow any interference to the Services; Vibrations and noise from tools, plant and operation are controlled and limited to the agreed upon work hours below Rubbish removal: the occupier / contractor shall not deposit or throw on common property any rubbish, dirt , dust or other material likely to interfere with the peaceful enjoyment of the proprietor or occupier of another lot or of any person lawfully using the common property. Common Property such as stairways and landings must be adequately protected from damage prior to Works commencing; That rectification of any damage sustained to common property or another Lot as a result of the renovation will be the responsibility of the Owner of Lot Unobstructed access to all Common Areas must remain available and unobstructed for the duration of the Works; Suitable rules for those engaged in the Works concerning shouting, use of radios, appropriate clothing, proper toilet facilities, avoidance of spitting, smoking, use of drugs and alcohol must be implemented and enforced; All building work shall only be carried out between the hours of: Monday – Friday - 8:00am – 5:00pm Saturday - 9:00am – 2:00pm Sunday & Public Holidays - no Works to be undertaken; An Occupier must rectify to the satisfaction of the Committee and at the cost of the Occupier any damage caused to the Common Property as a result of the construction of the Works. Vehicles: a proprietor or occupier of the lot shall not park or stand any motor or other vehicle upon common property except with the consent in writing of the body corporate MOTION CARRIED. YES – 3 NO – 0 ABSTAIN - 1 ______________________________________________________________________ Yours sincerely,____ Sandi Henry Body Corporate Manager TEAM BODY CORPORATE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Body Corporate Authorisation Resolution.pdfRelated documentApplication case desk ↗
About this file
- File size
- 64 KB (small file)
- File type
No other editions are linked here.