Council archive · source document
0015A1E4.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
|
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
j State-conitrotled road matters. «1 al2, The application involves: (tick applicable box/es}
| ‘iiss tov noes’ ne, orto 6 > J (i) development on land contiguous? to a State controlled road and for -
i the application viggers referral to the Departinent C1 (a) material change of use assessable against the planning scheme;
Caen eee soncetare | 10) rconfiguring aot ues -
agency, while in other circumstances. DMR will, « the total number of lots is not increased; and
| Bsceeatene agency, » the total number of lots abutting the State-controlled road is not increased;
{ Schedule 2of the IF Reaulaton Wil sist YO ue (J (c) operational work (not associated with a material change of use assessable against the
| concurrence agency for the application... ap. planning scheme or reconfiguring a lot mentioned in (b) above)—
ee ee « associated with access to a State-controlled road: or
bom ge Ma ee By « for filling or excavation; or
agp we Wee * involving the redirection or intensification of site stormwater from the land, through a
a sey rete Bene att pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
. Dems deme ne State-controfled road.
jee FN Re (C (ii) development on land not contiguous to a State-controlled road and -
Poe gS OR Wee .
gh ap up a ae [1 (a) material change of use -
hug howe OE » assessable against the local government's planning scheme; and
ee * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
bok bt ef that schedule;
cept yp wee cme Saks J] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
“ele gk te nth hae a and exceeding the thresholds set by that schedule;
@ woe (] (c) operational work (not associated with a material change of use assessable against the
: . ng planning scheme or reconfiguring a lot mentioned in (b} above)}~
_ . : ¢ assessable against the local government's planning scheme; and
Powe a et we « mentioned in schedule 5 of thé IP Requlation and exceeding the thresholds set by
a we ee that schedule.
re - (iii) none of the above
Clearing vegetation ~~. {3._ The application involves: (tick applicable box/es)
j For more Information refef toGuide 12 j CL (i) material change of use -
i Unt ered ‘ndiné of the above" to Q3, . . .
| he appeaioneqtes exsessen ie (a) assessable against the planning scheme;
| aaient of Natural Resouces and Wate 8 (b) on alot containing ~
*ifan agency other than NAW is the assessment « acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
| managet fot the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
| concurrence agency forthe application in relation " (c)_ where the existing use of the land is a rural or environmental use; and
you licked 034) or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 ;
ceralo nmi suena vac | Ci) recontiguring a tot
tt t
yo mo, (a) on alot containing a category 1, 2 or 3 area shown on a property map of
- me SO assessable vegetation or, if there is no property map of assessable vegetation for
@ , : the lot, remnant vegetation;
a a (0) where the size of the lot before the reconfiguration is 2 hectares or iarger;
Pos Dott ge, (c) where 2 or more lots are created; and
es eee 4 (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Be ng wee oe C1 (ii) operational work -
ee ee a (a) for the clearing of native vegetation where the vegetation clearing is made
po as ADR 5 Saw, Regd op assessable under Schedule 8 of the IPA; and
Mg aS “gs BESS (b) not associated with a material change of use assessable against the planning
ce i scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of
Bo oe BMT “esa ‘Btad ae} Form 1
ee es din none of the above. a
{ Strategic portland .-. - 3. ..,...4. The application involves:
if eu fic teerdrarr [11 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
If you ficked (i) - tha relevant Port Authofity is the .
| assessment manager othe application.” Act} - complete Part ! of Form 1 7 .
fifyou ticked (i) Queenstand Transport is'a C7 (i) a material change of use that is inconsistent with the land use plan approved under the
| concurrence agency for the application: 3- TI Act for the strategic port land - complete Part | of Form 1
ome wen Ba ae cd i noneofthe above ee
4 Land contiguous to a State-contolled road Is defined in schedule 14 of the IP Regulation to mean land - if part of the land és within 100m of the State-controlled road; or that is part of a future State-
controlied road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A1E4.001.pdfRelated documentPublic source context ↗
07/1316 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.