Original source · versioned page text
Toolar Street Architectural Plan Set 08.06.2022.pdf
T O O L A R S T R E E T
NOTE:
REMOVE EXISTING REDUNDANT CROSSOVER C UNIT BINS WHEEL TO KERB DAY
TP-7020-C 1,500
TO MATCH ADJACENT GUTTER 13 OF PICKUP ONLY
12
RL 12.44
1,500
7,000
1 2 3 4 5 6 7 8 9 10 11
A LANDSCAPED BATTERED BANK H B LANDSCAPED BATTERED BANK H
TP-7020-C TO SUIT LEVELS TP-7020-C TO SUIT LEVELS
1,500 1,500 RL 12.28
RL 13.20 RL 13.00 MAILBOXES IN POST & RAIL FRAME
RL 13.87 89O 59' WM 89O 59' WM
BATTERED ZONE
BATTERED ZONE
BATTERED ZONE
BATTERED ZONE
BATTERED ZONE
(40.234) (40.234)
SETBACK TO OMP
SETBACK TO WALL
5,000
14
7,000
F F F F
F VERTICAL
F GARDEN TO LSA F F
DETAIL VERTICAL GARDEN TO LSA
DETAIL
RL 14.00 POS POS POS POS
A A
SHARED PEDESTRIAN ZONE KERB
RL 13.00
UNIT 1 UNIT 2 xx m wide UNIT 3 UNIT 4 LANDSCAPED BATTERED BANK
DRIVEWAY TO SUIT LEVELS
185.51 m2 185.51 m2
KERB
RL 14.50
14,310
B B
1
1
1
1
10
12
13
14
15
15
14
13
12
10
11
11
2
3
4
5
6
6
5
4
3
2
2
3
4
5
6
7
8
9
9
8
7
6
5
4
3
2
2,100 - 920 2,100 - 920 2,100 - 920 2,100 - 920 2,100 - 920 2,100 - 920 2,100 - 920 2,100 - 920
A/C HIGH A/C HIGH A/C HIGH A/C HIGH
LEVEL LEVEL 5,354 LEVEL LEVEL
EXISTING 1800h SCREEN FENCE
RL 14.00
15
RL 15.00
C C
RL 14.675
RL 14.50
DRIVEWAY RL 13.775 RL 13.54
359O 59'
359O 59'
(50.222)
(50.222)
RL 15.00 RL 14.00
1:10 FALL
UNDERGROUND
TANK SIZE TBA
7,571
1:10 FALL
RL 15.02 RL 14.47
D VISITOR VISITOR D
PARKING 1 PARKING 2
EXISTING 1800h SCREEN FENCE
RL 15.50
E E
FEATURE TREE
1:30 FALL
1:30 FALL
1:30 FALL
1:30 FALL
1:30 FALL
1:30 FALL
1:30 FALL
EXISTING BOUNDARY FENCE
1:30 FALL
RL 14.00
A/C HIGH A/C HIGH
LEVEL LEVEL
A/C HIGH A/C HIGH
LEVEL LEVEL
F 1 1
F
2 2
3 3
4
EXISTING BOUNDARY FENCE
1 1
5
16 2
3
4
2
3
4
6
7
UNIT 5 UNIT 6 UNIT 7 UNIT 8
5 5
RL 16.00
DEVELOPMENT DATA - NOOSA SHIRE COUNCIL
6 6
7 7
8 8
506.39 m2
9 9
SITE ADDRESS: 25- 27 TOOLAR STREET, TEWANTIN QLD 4565
LANDSCAPED BATTERED BANK RPD : LOTS 1& 2 ON RP 73072
TO SUIT LEVELS
SITE AREA : 2020 sqm
RL 14.50
ZONING: MEDIUM DENSITY RESIDENTIAL
G G
SITE COVERAGE
SETBACK TO WALL
POS
OPEN DECK WITH
POS
OPEN DECK WITH
SETBACK TO WALL
ROOF OVER ROOF OVER SITE AREA = 2020 sqm
POS POS PERMISSIBLE SITE COVERAGE = 909 sqm (45%)
5,500
300 STEP
300 STEP
300 STEP
4,500
PROPOSED SITE COVERAGE = 877.41 sqm (43.4%)
2,500
1,500
RL 14.92
269O 59' GFA 269O 59'
UNIT 1 GF 55.20 FF 39.75 TOTAL 94.95
RL 16.48 (40.234) RETAINING WALL STEPS UNIT 2 GF 55.20 FF 39.75 TOTAL 94.95
(40.234)
RL 15.86 TO SUIT LEVELS
PROPOSED 1800h SCREEN FENCE ON LOW BLOCK RETAINING WALL UNIT 3 GF 55.20 FF 39.75 TOTAL 94.95
3,000 3,000
A C B UNIT 4 GF 55.20 FF 39.75 TOTAL 94.95
TP-7020-C TP-7020-C TP-7020-C UNIT 5 GF 73.34 FF 50.50 TOTAL 123.84
UNIT 6 GF 68.33 TOTAL 68.33
UNIT 7 GF 68.33 TOTAL 68.33
1 2 3 4 5 6 7 8 9 10 11 UNIT 8 GF 73.34 FF 50.50 TOTAL 123.84
UNIT 9 FF 67.26 TOTAL 67.26
UNIT 10 FF 67.26 TOTAL 67.26
1 SITE PLAN TOTAL - GFA 898.66 (sqm)
2 SITE COVERAGE
Scale 1:200 Scale 1:200
UNITS 1-4 GOLD RATED (PLOT RATIO = 0.44 : 1 = (898.66 sqm / 2020)
UNITS 5 & 8 GOLD RATED PERMISSABLE PLOT RATIO 0.5:1 (1010 sqm)
CARPARKING
NUMBER OF DWELLINGS = 10
REQUIRED CARPARKING = 2 per DWELLING (+ 1 PER 2 BED)
NUMBER OF CARPARKS = 16 RESIDENTS
= 2 VISITORS
N
DRAWING TITLE ISSUE REVISION
1:200, 1:1.43 @ A1 7/6/22
PROPOSED TOWNHOUSES PRELIMINARY
FAS SP
H
G
09/09/2021
12/07/2021
AREAS UPDATED
AREAS UPDATED
SITE Do not scale this drawing
SITE PLAN & SITE COVER
F 24/03/2021 LHD GOLD RATING INCORPORATED
E 05/03/2021 BUILDING GFA's AMENDED, SITE PLOT RATIO ADDED
10122/18
JAMESON / STIRLING B 01/12/20 UNITS 5,6,7,8 AMENDED 300mm reduction
DRAWING NO. TP-0001-M
/Volumes/RSA-Storage/ARCHICAD/RSA PROJECTS/ACTIVE 2022/10122:18 SQUIRES, 25&27 TOOLAR STREET, TEWANTIN/ArchiCAD Files/220531.pln 4:17 pm PLOTTED 7/6/22
[OCR of page images]
EXISTING BOUNDARY FE
LANDSCAPED BATTERED BANK
TO SUIT LEVELS
Z
ae Je
“ig Ss
.
ao
Fe al
Ww
n
scale 1:200, 1:1.43 @A1
design FAS
job number 10122/18
REMOVE EXISTING REDUNDANT CROSSOVER
TO MATCH ADJACENT GUTTER
o Zz
S 5
e i
5 E
i
4,
A
RLN4.
B
RL1
Cc
D TH TE=4
VISITOR |
ARKING 1=—!
(e) =
EXISTING 1800h SCREEN
F
RL 16s
RL 16.
TOOLAR STREET
1,500_| y
LANDSCAPED BATTE BANK !
TO SUIT LEVELS
RL 13. RL
GARDEN T|
DETAIL
xx m wide
DRIVEWA\
\
DRIVEWAY
61 7
4:30 FALL
date 7/6/22
drawn SP
OTE:
NIT BINS WHEEL TO KERB DAY
PICKUP ONLY
LANDSCAPED BATTERED BANK
TO SUIT LEVELS
12.28
XES IN POST & RAIL FRAME
4:10 FALL
13.00
LANDSCAPED BATTERED BANK
TO SUIT LEVELS
1800h SCREEN FENCE
rSar cl
VISITOR = D
ARKING —
STING BOUNDARY FENCE
4:30 FALL
14.00
14.50
14.92
‘AINING WALL STEPS
DEVELOPMENT DATA - NOOSA SHIRE COUNCIL
SITE ADDRESS: 25- 27 TOOLAR STREET, TEWANTIN QLD 4565
RPD : LOTS 1& 2 ON RP 73072
SITE AREA : 2020 sqm
ZONING: MEDIUM DENSITY RESIDENTIAL
SITE COVERAGE
PERMISSIBLE SITE COVERAGE =
PROPOSED SITE COVERAGE =
NE
UNIT 1 GF 55.20 FF 39.75
UNIT2 GF 55.20 FF 39.75
UNIT3 GF 55.20 FF 39.75
UNIT4 GF 55.20 FF 39.75
UNIT 6 GF 68.33
UNIT7 GF 68.33
\
[SUFBAREA VV 2 INV VN
909 sqm (45%)
877.41 sqm (43.4%)
TOTAL 94.95
TOTAL 94.95
TOTAL 94.95
TOTAL 94.95
JUNI AGRI EF50:505 TOA 23-84)
TOTAL 68.33
TOTAL 68.33
UNIT 9 FF 67.26 TOTAL 67.26
UNIT 10 FF 67.26 TOTAL 67.26
A VV,
client:
JAMESON / STIRLING
ROBIN SPENCER ARCHITECTS PTY. LTD.
this drawing is copyright other than the purposes of and subject to the conditions prescribed by the Copyright
Act (Cth) this plan must not be used, adopted or reproduced in whole or in part without the consent in writing
of Robin Spencer Architects Pty. Ltd.
P: 3392 1066
F: 3392 1055
A.B.N. 11 011 030 292
E: [email protected]
SITE PLAN (2 SITE COVERAGE
TOTAL - GFA C 898.66 (sqm)
Scale 1:200 A DAAA DAN ay, Scale 1:200 - , - ;
TERMINAL Saye a Sear hay Site cover site cover of development, means the portion of the site, expressed as a percentage, that
UNITS 1-4 GOLD RATED (PLOT RATIO = 0.44 : 1 = (898.66 sqm / 2020) will be covered by a building or structure, measured to its outermost projection, after the
UNITS 5 & 8 GOLD RATED PERMISSABLE PLOT RATIO 0.5:1 (1010 sqm) development is carried out, other than a building or structure, or part of a building or
structure, that is—
CARPARKING (a) _ in alandscaped or open space area, including, for example a gazebo or shade
NUMBER OF DWELLINGS = 10 structure or:
REQUIRED CARPARKING = 2 per DWELLING (+ 1 PER 2 BED) b that i letely bel d level and df king:
NUMBER OF CARPARKS 16 RESIDENTS (b) | abasement that is completely below ground level and used for car parking; or
= 2 VISITORS (c) _ the eaves of a building; or
. (d) a sun shade.
Livable
Housing Australia
; amendments The Lock Up DRAWING TITLE ISSUE REVISION
project: PROPOSED TOWNHOUSES 301 main street PRELIMINARY
H 9/09/2021 AREAS UPDATED : S IT E
G 12/07/2021 AREAS UPDATED kangaroo point 4169 Do not scale this drawing
F 24103/2021 LHD GOLD RATING INCORPORATED. i
E 05/03/2021 BUILDING GFA's AMENDED, SITE PLOT RATIO ADDED brisbane qld aus S ITE PLAN & S ITE COVE R
B 01/12/20 UNITS 5,6,7,8 AMENDED 300mm reduction A.C.N. 011 030 292
prawneno. TP-0001-M
Nolumes/RSA-Storage/ARCHICAD/RSA PROJECTS/ACTIVE 2022/10122:18 SQUIRES, 25&27 TOOLAR STREET, TEWANTIN/ArchiCAD Files/220531 pln 4:17 pm PLOTTED 7/6/2|
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Toolar Street Architectural Plan Set 08.06.2022.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.