Skip to the record
Accept no imitations.

Council archive · source document

00157AD5.001

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

v

                  INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 19.0, 2 March 2007
                  State-controlled road matters             2.   The application involves: (tick appticable box/es)
                  For mere nformaion cefer to Gurfe. 3           {] (i)   development on land contiguous’ to a State controlled road and for -
                  Untess you answered “none of the above” to 02,                        .                                    .              ,
                  the application triggers referral to the Department     (_] (a) materia! change of use assessable against the planning scheme;
                 of Main Roads (DMR} as a referral agency.                O (b) recon figu: rin ga lot unless -
                  In certain circumstances OMR wilt be an advice                                             .      .         .
                  agency, while in other circumstances DMR will                  « the total number of lots is not increased; and
                 be a concurrence agency.                                        + the total number of lots abutting the State-controlled road is not increased:
                  Schedule 2 of the [P Requlation will assist you to                      A                      :     ;          -                               ;
                  determine where DMR is an advice or                     LJ () operational work (not associated with a material change of use assessable against the
                  concurrence agency for the application.                         planning scheme or reconfiguring a lot mentioned in {b) above)-
                                                                                 * associated with access to a State-controlled road; or
           .                                                                     « for filling or excavation; or
                                                                                 + involving the redirection or intensification of site stormwater from the land, through a
                                                                                    pipe with a cross-sectional area greater than 625 cm? that directs stormwater toa.
                                                                                    State-controlled road.
                                                                 {| (ii) devetopment on land not contiguous to a State-controlled road and -
                                                                          1 (a) material change of use -
                                                                                 « assessable against the local government's planning scheme; and
                                                                                 * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                                   that schedule;
                                                                          [_J.{b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
                                                                                  and exceeding the thresholds set by that schedule;
                                      ,                                   (1 {c)  operational work (not associated with a material change of use assessable against the @
                                                                                  planning scheme or reconfiguring a lot mentioned in (b) above)—
         ,                                             ,               ‘         « assessable against the local government's planning scheme; and
                                                                                 = mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                     /             that schedule.                                                                                 ,
                                                                     (iit) none of the above
                  Clearing vegetation                       3.   The application involves: (tick applicable box/es)
,                 For more information refer to Guide 12.        C (i) material change of use—
                  Unless you answered “none of the above" to 03,                                 :             :            .
                  ihe apptication requires assessment by the               (a)  assessable against the planning scheme;
                  Department of Natural Resources and Water                                    finn
                  (NRW).                                                   (b)  on a lot containing
                  if an agency other than NRW is the assessment                 *  acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
                  manager for the application, NRWisa                           *  if there is no property map of assessable vegetation for the lot - remnant vegetation;
                  Pe ae oY (oF the eppication in relation                  (c)  where the existing use of the land is a rural or environmental use; and
                  if you ticked Q3ti) or (i), your application requires    (d}  where the size of the land is 2 hectares or larger - complete Part J of Form 1
                  whether vegetalion clearing is proposed or nol. O ( )     econtiguring     lot
                  refersat to NRW for assessment regardless of        ii)  or     figuring a fot -
                                                                           (a)  ona lot containing a category 1, 2 or 3 area shown on a property map of
                                                                            ~   assessable vegetation or, if there is no property map of assessable vegetation for
                 .                                                              the lot, remnant vegetation;                                                              ©
                                                                           (b)  where the size of the lot before the reconfiguration is 2 hectares or larger;
                                        .                                  (c)  where 2 or more lots are created; and
                                                                           (d)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                                 CJ (iii)  operational work -
                                                                           (a)  for the clearing of native vegetation where the vegetation clearing is made
                                                                                assessable under Schedule 8 of the IPA; and
                                                                           (b}  not associated with a material change of use assessable against the planning
                                                                                scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - comptete Part J of
                                                                                Form 4                                                   .
                                                                     {iv)  none of the above.
                  Strategic port land                      4.    The application involves:
                  ne bod) be, er to ous            with          (_] (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
                    you th   i} - the relevant Port Authority is the
                  assessment manager for the application.                Act) - compiote Part ! of Form 1
                  If you ticked (ii) Queensland Transportis a        (ii) a material change of use that is inconsistent with the land use plan approved under the
                  concurrence agency for the application.                TI Act for the strategic port land - complete Part fof Form 1
                                                                     {iii} none of the above

                 4  Land contiguous to a State-controlied road is defined in schedule 14 of the 1P Regulation to mean land - if part of the land Is within 100m of the State-controlled road: or that is. pat of a fulure State-
                    convolled road.
                                                                                                Page 2

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00157AD5.001.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.