NEOkOK We Checklist - Applications Involving Land Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 41.1. Form PartA 1.1.1. Ensure that the form is fully completed. | 1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. Teese 1.1.2.1 If there are multiple owners, the consent of each owner is required. 1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required. 1.2 Form‘ Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. re 2. REFERRAL INFORMATION. - - a. at 2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. Let 3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES. ~ | _ we 7 “s 3.1 Ensure that Part G Is completed if EPA referral is required. | 3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. 4. ' FORM 2’- REQUEST TO CHANGE APPROVAL yt 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding applicant details and owners consent. 5. PLANS . . : : a Lo : 5.1 Ensure that at least 6 sets of the Plan of Development 6 for Reconfiguration and Operational Fz Works) accompanies the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. 6. SUPPORTING INFORMATION Lo , 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 7. FEE . 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. 7.2 Ensure that the fee which has been paid is recorded on the application form. AI LS. pecereseteeeeeees Date ...... 1573. (72... Having completed this form and accepted the aplication, please deliver both to the following IDAS Application Receiving trays:- * If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. ¢ If the application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section. e If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the Land Development Section. e Inall other circumstances ~ AOP1's desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. Receiving Officer SEP g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 26 pages
Page 2
y
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Form 1 Development Application
The completion of all applicable questions on Part A is mandatory for al applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.aid.goy.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land
1.
Street address: (neludinghouse number, street name, suburbflocality name & postcode) (if applicable)
Gti Howat adeopten ola ct [ 9 ARAKOON CRESCENT, SUNSHINE BEACH. QLD 4567 |
SE ay ielecert ketal Chak 2. Name of water body or watercourse, within which the development ptoposepl. (ippmicable)
Auta for completing G2 Gh ees [ NA rn
development is proposed within a water or
Wetecourse, 3. Loton plan description (eg. Lot 123 on RP 4567) / GPS cording” yan xe
pleting Q3 - Most tand be
ented by» ton pan destpton.Thve deta [Lot 779 on RP4811 [/*7 RECEIVED ¥
(agra Sine” fore documents or wough he | 4 The above description is for: (ck applicable box) 14 MAR 2007
However, ifthe land on which the development is {1 (i) the land on which the developmentis proposed; 0&—-
iene usher i mhereel ea Ci) the land adjoining the water body or watercourse, \wi WARES HIRE Oat ig %
watercourse) provide — proposed; or 2
0 neater ° C1 (ii) the water body or watercourse. Ks)
" een peent tend fan ieeon Be. 5. Shop / tenancy number: 6. Storey / level: 7. rea a Tim? or ha):
Adylce for completing Q7 - Q7 does not apply if the | | | 674
development is within e water body or watercourse,
se ee Oa crront era 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc) (if applicable)
Hot: Aves bob high water makers petwihine | — [ NOOSA COUNGIL
Jocal government's area unless provided for under the
Local Government Act 1993, 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - 29 if j . i ,
oe ee patieueea development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port land tidal area, For more detaits refer to Guide 11 [NA |
Proposal detalts 10. Existing use of the land: (eg. vacant, single house, shop etc.)
If there is insufficient jeitable, detuits bi
Meare nil roc meant, tae ay be [ SINGLE HOUSE
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
| SINGLE HOUSE |
Other applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part 7, etc)
Part A must always be accompanied by other | PART’ E- |
completed parts of Form 1. For information about
when @ part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
Cl identi it the application. The
conicutnoedpafte ecune oelend [ MARK LOVERIDGE | [IAN GORTON
en siantya and todatng this application 14. Contact number: 16. Facsimile number/e-mail address:
Hsnsangliatint pws dah an [ 5447 5394 | [[email protected] |
manager, any referral Chief Executive
{where epphcabi) wala on this bsorendon when 17. Postal address:
assessing and deciding the application.
ithe apaieant sacomoaes a contzct person | PO Box 1261. NOOSA HEADS. QLD 4567 |
must be shown. 18. Signature: as 19. Date:
(GF-3- of
Z
a
Page 3
y
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2008
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that
application tenn onbe supparted oy. the Name Signatury Date
‘itten consent of the land owner/s, if the application
involves: i} MARK LOVERIDGE . -
@) a material change of use; o veseeeesecereeeceseteneececeee eed | é Lei awnitfe a 4-3-7
reconfiguration of a lat; 7 °
(3) work on land below high-water mark & not within a (ii) 4
canal as defined under the Coastal Protection and| [nite necn ene cecechecececceeececececcecceesceeeeereacbecececeeeeee-
Management Act 19950 _
(4 work on rail corridor land defined under the {iii)
Transport infasiuctua Act 1994, pee eee eee eben eee ce ene eee eee enn eee cnc aber eee snenennal
Section 3,8.1(2a) of the IPA provides that
landowner's consent is not required for a mobile or ()
fempormmvERA. fl rvre rere reer ereeecratescsesessarcseseapescaeasascarcscrececcorccscsccccacbonacssecersee|
For more information refer to Guige 1, )
Resource entitlement {if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than invoving
Section 32.16) of bro peli aeeseried a : quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
TeSOUrce len fications
invoNe a preserbed Stale resource, BX] NO - goto a24 (11 YES - go to. q22
See ON ee oe pet = hela" | 22. This application is accompanied by evidence: (tek applicable box)
vent eines of the resource entidement. [1 (i) ofthe allocation of, or entitlement to, the resource - attach evidence and go to Q23{v)
Refer fo schedule 10 of tha /nfograted Ptanning (fii) the chief executive of the department administering the resource Is satisfied the
Regulation 1998 that prescribes the nature of evidence
required by the State in support of the lodging of this
development application.
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
(iii) the chief executive of the department administering the resource Is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go to Q23
Advice for comptetina 023 428, Evidence of the resource entitlement.
Oe a a armen eer | (1) Resource entitlement / authority details (wiyorica stamp of the department
‘The official stamp of the Department of Natural ministering the resource (if
Resources, Mines and Water is mandatory where the applicable)
application involves any water of riverine quarry (ii) Name of delegated officer
tmatarial under the Water Act 2000, o_o
Section 3.2.1 (5A) allows the resource manages to imit
the time the evidence may be used. C23 (vi) must be fi i
compel te anne ine nied (il) Position of delegated officer
{iv) Signature of delegated officer
{v) Date
a) pe date of evidence we
Assessment tiggers 24, ts the IDAS Assessment Checklist completed and attached to this application?
foomnband Poe hy Berne fom san ~ YES (71 NO - the assessment manager may refuse to accept this application on the
must be completed for all ather applications. grounds thet the application has not been properly made
Plans | drawings / reports 25. Plans/drawings/reports accompanying this application:
An apptication should be accompanied by details to
‘support the propasat & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potentiat impact.
Plan f Drawing / Report Number
{i) REFER TO ATTACHMENT
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of jodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
1 DATE RECEIVING OFFICER'S REFERENCE
feo ONS [ RECEIVED Lod 3(-7 | Meo ers by Sno; | namene Lo7/yuR |
Notification of Engagement of Private Certifler optional tormet_) .
To, Council. | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement {
Accreditation Number.
_— Name:
Signature:
Page 4
PLAN / DRAWING / REPORT NUMBER TITLE DATE 0702WD.01 -SITE PLAN / ROOF PLAN MAR 07 0702WD.02 -LEVEL 1 PLAN MAR 07 0702WD.03 -LEVEL 2 PLAN MAR 07 0702WD.04 -LEVEL 3 PLAN MAR 07 0702WD.05 -ELEVATIONS MAR 07 0702WD.06 -SECTIONS MAR 07
Page 5
hy INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004 Form 1 Development Application ro Operational &/or building work + assessable against a local government’s planning scheme < | | Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme. Nature of the application 1. This application is for (tick one (1) or both if applicable) A development permit authorises imi - ie q 4a a cna QO Proiminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage approval Is a step in the approval process - and does not authorise development to occur. The types of work that are assessable against a planning scheme are determined by the AND/OR saan for apestoule foal government ard EX] Development permit - provide details of the type of work eg. reacwork, stormwater, water and sewerage ” infrastructure, etc To determine the f work that esceesable under parla laming [ ADDITION TO EXISTING SINGLE HOUSE IN COASTAL PROTECTION AREA_ scheme, contact the relevant local . +NEW roo goverment. 2. Are the works subsequent to a previous development approval? (NO [DYES - provide details of al! previous approvals (eg. file references) 3. Is the subdivision for a canal estate? NO (Yes Fonable Long Service Leave levy (if | 4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal? 9) Prior to issuing a development permit for the kw YES - complete 05 works, the assessment manager is required oO NO - 5, 6 & 7 do not apply by law to “sight” an approved form, issued by Qleave, which signifies that the PLSLlevy |. Has the PLSL levy been paid? has bean paid, (YES - completeas LX] NO - the appticable fevy must be paid before a development permit can be given for the works 6. How much was paid? : 7. Whatis the receipt number of the payment? PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (applicable to assessment manager) DATE RECEIVED REFERENCE NUMBER/S
Page 6
oe INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004 () Is aPLSL tevy applicable in this instance? me) (1 YES - complete ari (i) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment manager / private certiffier at the time of lodgement of this application? LINO [C1 YES - provide receipt details below LL
Page 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Form 1 Development Application idas
IDAS Assessment
Checklist
{Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1, This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
‘Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe Its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensiand State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
determine the assessment manager' for the application.
4, — Therefore, the completion of all questions in section { of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. tis the responsibility of the applicant to accurately complete this checkfist.
6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
8. — The assessment manager for the application wilt rely on the information provided in this checklist (as weil as any material lodged in support of the application} to Identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
epplication triggers referral coordination?,
9. Toassist you In answering the following questions a series of guides are available free from the IPA website www,ipa.qid.gov.au. Guide 25 expiains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10, Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa. id. gov, au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
| Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For mare Information refer to Guide 4, (1) an environmentally relevant activity (ERA) for which a code for environmental compliance
Untase you answered “none of the above’ fo Qt, has not been made - complete Part G of Form 1
the application requit tby the = , . ;
a *y (J (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
Itan ently, other than the administering Made - complete Part G of Form 1
authority, is the assessment manager for the ai none of the above
application, the administering authority isa
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 end/or 20
will also require completion of Part Kr of Form 1
for approval where an affocation under the Water
Act 2000 is required,
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable fo assessment manager)
DATE RECEIVED 3 REFERENCE NUMBERIS |
1 The assessment manager is responsibis for assessing and deciding an IDAS application. The essessment manager for en application Is prescribed in schedute 8A of the IPA.
2. For additional information refer to Guide 6 ‘Does my application tigger the referral coordination process?"
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Page 8
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3.
Unless you answered “none of the above” to Q2,
the application tiggers referral to the Department
of Main Roads (DMR) as a referral agency.
in certain circumstances DMR will be an advice
agency, while in other circumstances OMR will
be a concurrence agency.
Schedule 2 af the !P Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves: (tick applicable box/es)
(14) development on land contiguous’ to a State controlled road and for -
CO (@) material change of use assessable against the planning scheme;
CO (0) reconfiguring a fot unless -
« the total number of lots is not increased; and
» the total number of lots abutting the State-controlied road is not increased;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in {b) above)—
associated with access to a State-controfled road; or
« for filling or excavation; or
« involving the redirection or intensification of sits stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(CD (i) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
« assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(J (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(J (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)}-
« assessable against the local government's planning scheme; and
e mentioned In schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule,
Bw (ii) none of the above
Clearing vegetation
For more Information refer to Guide 12.
Unless you answered “none of the above" to 3,
the application requires assessment by the
(NRW).
If an agency other than NRW is the assessment
Tanager for the application, NRW is a
concurrence agency for the application in refation
to this matter.
Ifyou ticked Q3{i) or (i), your application requires
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not
The application involves: (tick applicable box/es)
(1 ()_ material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -—
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Fonn 1
reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(1) (ii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
Daw) none of the above.
CI Gi)
Strategic port land
For more Information refer to Guide 11.
Ifyou ticked ()) - the relevant Port Authority is the
assessment manager for the application.
Ifyou ticked (i) Queensland Transport is a
concurrence agency for the application.
The application involves:
CD (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
CA (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - compiete Part ! of Form 1
1 Gil) none of the above
4 Land contiguous to a State-controlied road is defined in scheduts 14 of the IP Regulation to mean iand - if part of the land is within 100m of the State-controlted road; or that is part of a future State-
Page 9
INTEGRATED PLANNING ACT 1997
Acid sulfate soils 5.
For more information refer to Guide 19.
Unless you answered “none of the above” to Q5,
the application requires assessment by
Oepartment of Natural Resources and Water
(NRW).
if an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in retation to this
matter.
Major hazard facilities or possibie 6.
major hazard facilities
For more information refer to Guide 17.
Ifyou answered “YES” to Q6, the application
requires assessment by the Department of
Emergency Services (DES).
Ifan agency other than DES is the assessment
manager for the application, DES is a
Concurrence agency for the application in
relation to this matter.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)
(1 @)_ below 20m AHD® and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
(CJ (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
1 (iii) none of the above
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
J No
(YES - complete Part L of Form 1
Water related development under the | 7.
Water Act 2000
For more information about items (a) - (f), refer
to Guide 15. For more information about item
(9). refer to Guide 14 Does my application
Involve assessment of a referable dam?
Unless you answered "none of the above” to Q7,
the application requires assessment by the
O ent of Na esources and Water
(NRW).
\f an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.
The application involves:
C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
(1 (a) inawatercourse, lake or spring, (eg. 2 pump, gravity diversion, stream re-cirection, weir or
dam) - complete Part K2, Ks, Ka, Ke, or Ke of Form 1 whichever is applicable;
(J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
CJ (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
USE - complete Part K; of Form 1;
(1 (4) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
(1) €e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1;
O
for interfering with overland flow water in a drainage and embankment area -
complete Part Ky of Form 1
(1 (g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; oF
[XI di) none of the above.
Removal of quarry matarial from a 8.
watercourse
For more information refer to Guide 16.
Ifyou answered “YES” to Q8, the application
tequires assessment by the Department of
Natural Resources and Water (NRW).
{f an agency other than NRW is the assessment
Manager for tha apptication, NRW is a
concurrence agency for the application in
Felation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse Is also an
Environmentaly Relevant Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
Tequiring an allocation notice under the Water Act 2000?
Bano
(11 YES - complete Parts Ky and G of Form 4
5 The identified tocal government ereas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cains, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Doungies, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiero, Torres, Townsville, Whitsunday.
8 Australian Height Datum (AHD).
7 The declared ground water areas are listed in Guide 13 Development in a dectared catchment aree,
8 Referable dam is defined under the Water Act 2000.
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Operational work that is tidal work or 9. The application involves operational work that is: ( tick the applicable box/es)
work in coastal management district . -
For more information refer to Guide 18. Far (JQ) tidal work" as defined under the Coasta! Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - compfete Part M of Form 1; or
va government arniirenereen J Gi) tidal work that is prescribed tidal work"' other than in a canal2 -complete Part P of Form 1; OF
the aprcaton rome assessment by tha , DO di) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
ite nn fea GPAs the assessment (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
ecaton, EPA a other than those works in tidal water} where the development has been determined not
concurrence agency for the application
refation to this matter. sepicaton in to be assessable against the Water Act 2000 ;
Local government is the assessment manager (1b) constructing a canal’? intended to be connected to tidal waters;
for all prescribed tidal work. . te
Ci (c) constructing an artificial waterway;
(1) (a) reclaiming land under tidal water,
C1 (e) disposing of dredge spoil or other solid waste material in tidal water,
(L) () _ interfering with quarry material on State coastal land above high-water mark;
(1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(Ci) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal {and, above high-water mark; or
§1 (iv) none of the above.
Operational work below high water 10. The application involves operational work that is: ( tick the applicable box/es)
mark C1 (i) tidal work'3 as defined under the Coastal Protection and Mana:
, . gement Act 1995 (the
Me eet shout eased ioe work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
eee kidal areas oe aike2t 7 (Gil tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
GH, te epson riggers refer C1 Gi) carried out within a coastal management distict'S under the Coastal Act and for -
aig popepernerenenay , Oe Geposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager ,
for all prescribed tidal work. (1 (6) reclaiming Jand under tidat water - complete Part M of Form 1; or
(©) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
iv) none of the above.
RA (iv) none of the abo
Coastal management 11. The application involves: (tick the applicable box/es)
For more information rater to Guide 18, C(i) amaterial change of use assessable under a planning scheme involving operational
it Po eppanan regures eave erat the work carried out completely or party in a coastal management district"
Environmental Protection Agency (EPA). Ci (i) a material change of use assessable under a planning scheme involving building
ian agency other than EPA's the assessment work, carried out completely or partly in a coastal management district that is -
Soren ageey ta ta gph in « the construction of a new premises with a GFA'® of at least 100m?
elation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
C1 (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 () reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? — complete Part M of Form 1
Rw none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain Gdal works completely or partly within a focal government tidal area.
15 Coastal management district is defined in sch 10 of the 1PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an erea declared as 4
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean tha gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the apptication is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must bo
Page 11
INTEGRATED PLANNING ACT 1897
Development within the limits of s
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
Ifyou answered “YES” to 12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development Is ~
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port
within 1000m of a swing hasin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
{n all other situation the Port Authority is an
advice agency.
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
Prescribed tidal work,
Ifyou answered "YES" fo Q13, the application
‘triggers referral to nstand Fire and Rescue
Service as an advice agency.
Tidal works In strategic port land tidal
ateas
For more information refer to Guide 18.
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) end Queensland Transport (QT)
are concurrence agencies for the application.
Heritage
For further Information refer to Guide 49.
if you answered “YES” to Q15, the application
triggers referral to the Queenstand Heritage
Council as concurrence agency for the
application.
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
D of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
Manager for the application, NRW Is a
concurrence agency for the appileation in
relation to this matter.
12.
13.
a
15.
16.
4.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport infrastructure Act 19947
BX[NO
(1 YES -— complete Part M of Form 1, or Part P of Form 1 ifthe work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
XNo
(1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Does the application involve tidal works within a strategic port land tidal area?
INO
(FD YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
KINO
(1 YES - complete Part C of Form 1
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
[1 @) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
(Gi) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
Rw
18 High water mark is defined in the Coastal Protection end Management Act 1995 and means the ordinary high water merk at spring tide.
19 Marina 48 defined in the Transport Operations (Maritime Pothition) Regulation (1995.
Page 12
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use [1@ reconfiguring a lot for which all of part of the premises are —
ing a tot tt
arr conning alot may tage tis (a) premises mentioned in the IPA, schedule 8, part 1, table 2-
For more information refer to Guide 5, « item §, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an activity; or
agency other than EPA ts the assessment , . . .
manager for the apptication, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence for the application i .
rel op agency te application in ordnance - complete Part N of Form 1
0D (i) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and ff all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
Kili) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable bor/es)
For more information refer to schedule 2of the |P (1@ _ reconfiguring a lot where any part of the lotis -
Reston 0 a “none of the above to subject to an easement in favour of a distribution entity or transmission entity under the
ate, ne application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act, or
favour of as advice agency. « situated within 100m of a substation site;
(1 (i) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a fot if -
« any part of the premises is subject to an easement In favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement,
OO (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
(C1 (iv) operational work thatis filling or excavation assessable against the planning scheme,
Not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partty in
the easement;
the work is located wholly or partly within 10m of a substation site;
TX\(v) none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
Infrastructure designated for community infrastructure?
Applications involving development on tand
designated for community Infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Regulation.
Ifyou answered "YES" to Q19, the application
fequires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
if an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behaff of the State; and
(iii) other than development —
(a) for the designated purpose; or
{b) carried out by, or on behalf of, the designator.
Kino
CIYES
Page 13
INTEGRATED PLANNING ACT 1997 SEQ Regional Pian For mare information refer to schedule 2 of the IP Requtation. Refer to Chapter 2, part SA and schedule 10 of the f ited. ti 4997, and schedule 2 of the Regulatory Provisions for relevant definitions. Unless you answered “none of the above” to Q20, the application requires assessment by the Office of Urban Management (OUM). Fisheries mattors For more information refer to schedule 2of the IP Regulation. Unless you answered “none of the above" to 021, the application requires assessment by the Qepartment of Primary Industries and Fisheries (OPI&F). It an agency other than OPI&F is the assessment manager for the application, DPI&F is a concurrence agency for the application in relation to Items (i) ~ (Iv) and an advice agency Jn relation to item (v). IDAS Assessment Checklist, Version 19.0, 2 March 2007 20. The application involves (tick applicable boxes) - (1 (i) amaterial change of use of premises — (a) ina Major Development Area in the Urban Footprint for - 0 @ anurban activity - (1 inan area included in a structure plan where the IPA, section 3.1.6 applies; C1 inanarea not included in a structure plan where - « the IPA, section 3.1.6 appiies to the application for the material change of use; or e the premises exceeds 10,000m2; or « the gross floor area (GFA) on the premises will exceed 10,000m2; or « impact assessment is required under the relevant planning scheme CD (i) intensive animal husbandry, or CI (ili) residential development involving a rural residential purpose (b) in the Regional Landscape and Rural Production Area for - ( (i) anurban activity and not specified in section 2.4(2); or ( (i) residential development involving a rural residential purpose and not specified in section 2.6(2) (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2); (d) in the Investigation Area for - CJ @ anurban activity and not specified in section 2.10(2); C (ii) residential development involving a rural residential purpose and not specified in section 2.12(2); or ( (ii) intensive animal husbandry (ii) reconfiguring a lot- On land in a Major Development Area in the Urban Footprint that is: (a) not included in a structure plan; and (b) not specified in section 3.1(2). Kl ii) none of the above 21. The application involves: (tick the applicable box/es) (C]() an assessable materlal change of use for aquaculture - complete Part O1 of Form 1; Ci (ii) assessable operational work that is the construction or raising of a waterway barrier - complete Part O3 of Form 1; Odi) assessable operational work completely or party within a declared fish habitat area- Ow) development assessable under the IPA, schedule 8, part 1, on land that adjoins a complete Part O2 of Form 1; assessable operational work that is the removal, destruction or damage of a marine Ow declared fish habitat area; TR (vi) none of the above, O plant - complete Part O2 of Form 1;
Page 14
INTEGRATED PLANNING ACT 1997
integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requtation.
Untess you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
22. The application involves: (tick the applicable box/es)—
CO @) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
CO Gi) reconfiguring a tot—
O(a) _ onland that is completely or partty within a public transport corridor, and the
total number of lots increases;
[J (b) _ ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;
CJ (©) _ ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 (@) _ for aresidential purpose within the 25 ANEF contour for an airport,
CJ (e) _ for a residential purpose resulting in 100 or more allotments.
D (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
C1 (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) _ will result in work that encroaches into an airport's operational airspace.
fEL(iv) none of the above.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Regutation.
Unless you answered "none of the above", the
application triggers referral to QT as a
23. The application involves: (tick the applicable box/es)—
C () a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
concurrence agency. O (ii) reconfiguring a fot—
C1 (a) __ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement,
(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
CJ (c) _ ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (@) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) _ onland that is completely or party within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(CO (f) for aresidential purpose resulting in 100 or more allotments.
C (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—
O(a) __ is completely or partly within rail corridor land or commercial corridor tand, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1) (b) is completely or party within future railway land, or a railway tunnel easement;
(1c) _ abuts rail corridor jand, commercial corridor fand or future railway land, and
the work is within 25m of the railway boundary.
Rw none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP
Reguiation.
Unless you answered "none of the above", the
application tiggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice,
Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
(1 @ a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
O (ii) reconfiguring a lot
CO (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
® {iv) none of the above.
Page 15
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application requires referral to the Envionmental
IDAS Assessment Checklist, Version 19.0, 2 March 2007
25. The application involves: (tick the applicable box/es)—
(1) (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in-
Protection Agency as a concurrence agency. Ci fa) clearing of native vegetation over an area greater than 2500m2,
(CO (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?,
LJ (©) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
CO (d)_ extracting gravel, rock or sand from an area greater than 5000m?;
CJ (e) excavating or filling an area greater than 5000m?;
LJ () additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
CO (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in —
(J (a) an increased number of lots;
LJ (b) clearing of native vegetation over an area greater than 2500m2.
J (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (net associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2,
() (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in —
{_] (a) clearing of native vegetation over an area greater than 2500m2,
(J (b) extracting gravel, rock or sand from an area greater than 5000m2,
(1) (c)_ excavating or filling an area greater than 5000m2,
WwW (v) none of the above.
Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
For more information, refer to Guide 27 2005?
ifyou answered YES to Q26, you must also w NO
complete section 2 of this checklist. This will
enable you to determine if your application can (J Yes
proceed in a wild river area and which referral
agency will your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wid river area
Note: Development can be ‘prohibited’ in a wild
fiver area because the application cannot be
accepted by the assessment manager.
Referral coordination 27. Does the application trigger referral coordination?
An information request requires referral K NO
coordination if the application involves - a
) 3.r more concurrence agencies: or (2 YES, as the application: (tick the applicable bowes)
(i) a facility or area assessable under a . . .
planning scheme and prescribed in (1) triggers 3 or more concurrence agencies;
schedule? or 8 of the IP lation, a i ‘ i
wi development which is subject to an * (i) involves a material change of use made assessable under a planning
application for preliminary approval scheme and prescribed in schedule 7 of the IP Regulation;
mentioned in 83.1.6 ofthe PA. C ii) involves a material change of use (other than a dwelling house, outbuilding
For more information go to Guide 2.and Guide 6. or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;
C1 (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA
Referral agency responses priorto 28. Did areferral agency give a referral agency response under $3.3.2 of the IPA before the
lodgement
Under 53.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an
application for the proposal is made to the
assessment manager.
This is commonty the case where an application
requires referral to a building referral agency (eg.
Qld Fire and Rescue Service).
application was made to the assessment manager?
{no
(YES - attach a copy of the referral agency/s response/s
Page 16
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)
Wild River Area
it the responsibility of the applicant to
determine if the development is proposed in
a wild river area.
Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website waww.new.gid.gov.au or
contacting the department by email on:
wild [email protected]
Note on Referrals
Referrals for development In a wid river area
{other than for agricultural activities and animal
husbandby activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For Information regarding development in a wid
tiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
agalnst the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas, The relevant
declaration will provide the information applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications,
for development activities which may be made
Including these in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a retevant
wild river dectaration.
Environmentally refevant activities
{ERAs) in a designated urban area
Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there ere no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.
if you answered NO to Q2, please complete the
remaining questions in Section 2.
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
(Ji) a high preservation area (HPA);
(J ii) a preservation area (PA) ;
(_) ili) a wild river floodplain management area (FMA);
[J iv) a wild river nominated waterway;
(71 v) a designated urban area (DUA).
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ii) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
CINno [1 YES (ensure you have completed Part G of Form 1)
Clearing native vegetation
If YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted ina HPA See
Guide 27 for a list of relevant purposes for
which an application may be made ina HPA.
IFYES and you ticked Q4 box j) the application
May be made and Is assessable against the Wild
Rivers Code, if YES and you ticked Q4 box ii)
the application will not be accepted.
Note: if clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
Is the application operationat work for clearing native vegetation in a HPA?
{no [1 YES (ensure you have completed Part J of Form 4)
If YES, is the clearing?
[-] i) clearing regrowth {as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
oO ii) in a HPA outside a registered area of agriculture?
Page 17
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas
\fyou answered YES to Q5, and ticked any
boxes in Q6), your application Is required to be
assessed against and must comply with the Wild
Rivers Code.
ifyou answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.
Note: If specified works are proposed in a local
government area, Itis prescribed tidal work ~ the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency
Hyou answered YES to Q5, and ticked box ii) or
iil) In Q6, your application requires referral to
OPIF.
Ifyou answered NO to Q5 and ticked box i) in
Q6, the appfication will not be accepted.
(fyou answered NO to Q5, ticked box ji) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is he!d, the application must be
assessed against and must comply with the Wid
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted,
Ifyou answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
Ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located Ina HPA.
For more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
Ifyou answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river dectaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
Ifyou answered NO to Q7 and ticked either box
{) or il) in Q8, the assessing agency Is the
relevant local government. The appileation must
be assessed against and must comply with the
Wild Rivers Code.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
[no (Yes
The application is for one or more of the following:
(Ji) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF
(ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), OF
O iii) Buitding or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
ls the application for residential, commercial or industrial development in a designated urban
area?
Lino (J Yes
If NO, does the application for residential, commercial or industrial development involve:
in i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or
J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
Animal husbandry activities
{fyou answered YES to Q9 your appfication
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
(no [71 YES (ensure you have completed Part R of Form 1)
Agricultural activities
Ifyou answered YES to Q10, your application
Tequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activites
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
10.
Does the application involve agricuttural activities (as defined under the Wild Rivers Act 2005) in
a PA?
LJNo
[1 YES (ensure you have completed Part Q of Form 1)
. If YES is the application for:
(1 i) a material change of use; or
(J ii) operational works.
Page 18
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river dectaration will state
works that take overland flow water are either
Self assessable or assessable, or are exempt
from wild river requirements.
you ticked 13 3), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 i) an application is not required
tp be made however the works must comply with
the relevant seff-assessable section of the Wid
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ficked Q13 fil) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
ere either self assessable, assessable or exempt
from wild river requirements.
Ifyou ticked Q15 i), your application must be
essessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant seff-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Coda
and must comply with the code.
Ifyou ticked Q15 ii} your application is not
‘Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
(fyou answered YES to Q16, your appficafion
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
13.
15.
16.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
LNno [1 YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works
LD ii) self-assessable works
(iii) exempt works
Does the application involve works that interfere with overland flow water in a FMA?
Eno [2D YES (ensure you have completed the relevant Part K of Form 1)
\f YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
(2) ii) setf-assessable works
(71 iti) exempt works
Does the application involve building or raising waterway barrier works in a PA?
LJ No O YES (ensure you have completed Part O3 of Form 1)
Aquaculture (non ERA)
Appfications for aquaculture in a HPA will not be
accepted.
\fyou answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
] No (1 YES (ensure you have completed Part O; of Form 1)
Works that interfere with water ina
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted,
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
(Fyou ticked box fi) in Q19, your application will
hot be accepted.
Note: Operational works outside a HPA or
nominated waterway are net subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
AW new. cld,gov.au or contacting the
department by emai} on:
wild [email protected] goy.au.
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
(No [7] YES (ensure you have completed the relevant Part K of Form 1)
If YES,
(Ji) The application is for an instream dam or weir; or
{_] ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 19
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of
‘some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW of delegated
local government (sea EPA website for more
information on devolved ERAs)
Ifyou answered NO to 020 you do not need to
complete Qs 21-24.
Ifyou answered YES to Q20 and the
development is In a PA, your application must be
assessed by the administering authority?"
agalnst the Wild Rivers Code and must comply
with the code, unfess the proposat is for
development where an application will not be
accepted, ot is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - 024.
Ifyou answered NO to Q21, you do not need to
complete Q22. Ifyou answered YES to Q21 you
are required to complete Q22,
Ifyou answered NO to Q22, the spplication wil
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,
Ifyou answered NO to Q23 and the development!
is proposed in the HPA the apptication will not be
accepted, Ifyou answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
{fyou answered YES to Q24 the application wilt
not be accepted, If you answered NO to 024,
your appiication must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
Ifthe development is proposed in a designated
urban area there may be no wild rver
requirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area),
Documentation
ifyou answered NO to Q25, your apptication
may be subject to an information request and
processing of the application may be delayed.
20.
21.
22.
23.
24.
25.
LNo
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve an ERA?
No (71 YES (ensure you have completed Part G of Form1)
Is the application for an ERA 20 instream?
(CJ Nno (J Yes
ts a quarry allocation notice held for the proposed ERA 20 instream?
[No Clyes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii} an ERA 19 (dredging)
iti} Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
()No (] Yes
\s the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— notlow impact and
— not for a residential complex in the area, or for specified works.
[no (Yes
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the retevant part/s of the Wild Rivers Code?
Dyes
Page 20
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
SECTION 3 -
BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1.
For mora information go to schedule 2 table 1 and
schedule 2A of the [P Regulation.
Assessment period 15 days, No response is 8
deemed refusal.
An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.
Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the IP
Regutation
An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.
Spray painting 3.
For more information go to schedule 2 of the iP
Regtutation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.
Retail maat premises 4.
For mere information go to schedule 2 of the IP
equation
An application may trigger referral to Safe Food Qid as a concurrence agency if the application involves a
fetal meat premises.
Privata health facilities 6.
For more Information go to schedule 2 of the IP
Requtation
An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.
Workplace area less than 2.3m? 6.
For more information go to schedute 2 of the iP
Beguistion
An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?.
Land contiguous to a State-controlied | 7.
toad
For more information go to schedute 2 of the |P
Reguistion
An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves iand contiguous fo a State-controlled road.
Pastoral workers accommodation 8.
For more information go to schedule 2 of the IP
Regutstion
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.
Child care centre 9,
For more information go to schedule 2 of the IP
Reautation
An application may trigger referral to the Department of Communities as a concurrence agency if the
application invaives a childcare centre.
Coastal development 10.
For more information go to schedule 2 of the IP
Requiation
An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves !and completely or partly seaward of a coastal building line”.
Heritage 11.
For more information go to schedute 2 of the IP
Renulation
An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.
Fisheries matters 12.
For more information go to schedule 2 of the IP
Requiafon
An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 13,
transport
For more information go to schedule 2 of the IP
Regulation
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”.
Railway safety and efficiency 14.
For more information go to schedule 2 of the IP
An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
tefusal. However for amenity and aesthetics impact of particular building work for a single detached class {a or class 10 building or structure (15), no
fesponse is taken to be a deemed approval.
Amenity and aesthetic Impact of
particular building work for single
detached class 1 building or class 10
building or structure
For more information go to scheduis 2 table 1 of the
IP Regutation.
Assessment period 15 days. No response is @
deemed approval.
15,
An application will trigger a referral to the local goverment if it is :
e forasingle detached class 1 building or class 10 structure; and
e the locat govemment has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
Page 21
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Whather particular buildings may be
occupled for residential purposes
For more information go to schedule 2 table 1 of the
(E. Regutation.
Assessment period 15 days. No response is a
deemed refusal.
An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
referral to the local government as the concurrence agency.
Design and siting 17. An application may trigger referral to the tocal government as the concurrence agency if the building work
For mare information go to schedute 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Reguletion. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days, No response is a does not comply with the qualitative statement for building clearance and site cover.
Soomed refusal 19. An application may trigger referral to the local goverment as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safaty in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Buliding Act 1975 when the building work has
For mora information go to schedule 2 tabla 1 of the been completed.
IP Reguetion,
Assessment period 15 days. No response is a
doomed refusal.
Higher risk personat appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services
For more information go to schedule 2 table 1 of the
IP Regutstion end the QOC part 15.
Assessment period 15 days, No response is. a
deemed refusal,
building work
« — complies with the performance criteria of the Queensland Development code part 15; and
e the work does not comply with an acceptable solution stated in the part.
Bullding work for residential service
For more information go to schedule 2 teble 1 of the
{P Reguaagon and the QDC part 20.
Assessment period 15 days, No response is a
deemed refusal.
22.
An application for building work for premises in which residential care service under the Residential
Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
teferral to the local government as the concurrence agency.
Building work for removal or
rebullding
For more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 5 days, No response is a
deemed refusal.
An application for the removal! and/or rebuilding at another site of a building or other structure, will trigger
teferral to the local government as the concurrence agency.
Building work for rainwater tank In
designated rainwater tank area
For more information go to schedute 2 table 1 of the
{P Regulation and the QDC pert 25.
Assessment period 15 days. No response is a
deemed refusal,
24,
An application may trigger referral to the local government as the concurrence agency to determine if the
building work or structure complies with the relevant performance criteria if -
© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area, and
e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.
Page 22
raw inl ony b mani tot ere
ROOF PLAN / SITE PLAN | nouns ot popcsod now wots shown shaded
STORMWATER
‘Note: Roof & surface stormwater to ba disposed
of in accordance with Noosa Counal requirements.
SEWERAGE
Note: New drainage Bnes to be connected into.
existing house drain system In accordance with
Plumbing and drainage regulations.
SUPPLY
Note: {t mains water pressure exceeds or could
exceed 500 kPa, 8 water pressure imiting device:
‘shall be Installed to ensure that the maxdmium
operating pressure al any outlet within the boundaries:
‘of the property doss nol exceed 500 kPa.
Note: Water Supply: Connect new ixtures to exisiting
house waler supply in accordance with Councal
requirements.
TANKING OF HABITABLE AREAS
‘Ad steps in foors where retaining walls have been
installed or where retaining walls are used as
extemal walls of habitatte roams are tobe
walerprocied by an approved tanking system and
instaffad by an accredited instatter. The approved
‘system is to be certified for compliance upon
completion.
TERMITE PROTECTION
‘The buicing shai be protected trom subterranean
tarrites by approved physical and / or
chemical bartiers in acoordanos with AS3660.1. The
Precise method of proteciion shall be
<daterrined by the owner! s andi or builder onty after
consultation wath a licensed pest control
“operator. This informaton then shall be advised to
the Local Government or Licensed
‘Cerlifiler prior to, or at tha time of lodgernent of the
Bulking Part Application.
THEREAFTER, THE OWNERIS SHALL ENSURE
that any physical baiers ara kept dear
of garden beds and or soit build up, that any
chemical bariers remain undisturbed and that
‘annual inspections (ptus eradication as necessary )
‘are canted out thoughout the fife of the
building by a icensed pest control operator in
accordance with AS36601.
On the completion of the building prior to the thal
Inspection by the tioonsed Bulding Certiier, a
Sicensed Pest Controlar is to inspect and confirm
‘thal the termite system Installed has nol bean
bridged or breached and the required visual barrier
‘has been maintained.
SURFACE WATER DRAINAGE
‘Note. The extemal finished ground level surrounding
the building must be graded to a slope not less than
‘SOmm aver the frst 1.0m from the building in.
accordance with Figure 3.1.2.2 of BCAS6 Housing
Provisions.
‘Tho finished ground level is fo be a minimum of
150mm below ground floor tevel..
ENERGY EFFICIENCY
REQUIREMENTS
Pro Therm ‘Reflecta Call insutation to ba instaed
below al roof sheeting (exctucing decks) to
manutactures wettten instructions.
Pro Thar ‘Reflects Call insulation to be instafed to
‘#8 axdericr [ramed walls tp manufactures waitten
instructions,
All extemal doors & windows to be fitad with a seal
$o restrict at infitration.
‘Al exhaust fans to conditioned spaces fo be fitted
‘wih a sf dosing damper.
Hot water system shall be fitted wath a heat trap
‘within ttn of the oul of the heater and before the
‘Siret branch.
NOOMVAY
LNFIISFAD
GENERAL NOTES
Note; Plumber to provide tundshes within an of
‘@ach AC Fan Cail - exact location to be determined
‘on sita with AC Contractor, Builder and Bulking
Designer.
Note: Toilet doors are to open outwards ar be Gtted
‘wilh lift off hinges in aocordance with part 3.8.3.3 of
OCA Housing Provisions,
Note: All glazing in butdings to comely with tha
Taquimnents of part 3.6 of BCAS6 Housing Provision
and AS1288/1994. A gazing certiicate trom the
manufacturer for compitance wih AS1 288 must be
Provided on completion,
‘Smoke alarms must compty wih AS 3786 andbe
connectad to the consumer mains power. Smoke
alarms must be located in accordance with part
3.7.2.3 of the building code of Australia,
BUILDING WORKS SETOUT
Bulking Works shall be setout by Licensed Surveyer,
identification and height verificalion suvey to be
artied out once fascla/guttar and ridge toroot has
been erected fo confirm ne works encroach,
‘boundaries and the building has been constructed
in aecordance wilh approved plans and height does
not exceed 8.0m height limit as par Noosa Ptanring
‘Schema.
FLOOR AREAS.
EXISTING few
tt — eq, Lave Sgn,
Lol? == 188g. Lvl? gm,
Lave) eq, Ld 1 ag,
fora tego gn, TOTAL 97 ag]
SQASTING DECK AREAS. NEW DECK AREAS.
ttt — dad? —
SHEET PILING / EXCAVATIONS
Shee! Piling to be designed and corfiled by RPEQ
‘80.4 to support ikely imposed loads and not cause
or alow damage to adjacent bukding works oF land,
- Note: afl boundary works, including temp. works not
10 encroach over boundary.
Builder to make allowands to prop, shore and retain
the sides of all excavations required for butding
construction. The builder shall salsty himself aa to
tha method to employ prior fo commencing ‘any’
excavation. Any sippage or damage caused as a
result of excavation shal be made good by builder .
‘Adequate retention methods are the ful responsibilty
‘of the builder.
WATER PROOFING WETAREAS
Note: Waterprooling of wet areas fo comply with:
AS3740-2004. A certificate including bathrooms,
WC and laundry from an approved waterproofing
applicator wal be required betore a final certificate
can beissued,
TAL —_ mn]
REAL PROPERTY DESCRIPTIO
Lot 779 on RP4BTI
QARAKOON CRESCENT
‘SUNSHINE BEACH
SITE AREA: 674n*
~SITE PLAN / ROOF PLAN
LEVEL 1 PLAN
LEVEL 2 PLAN
“LEVEL 3 PLAN
ELEVATIONS
SECTIONS
‘Tieamabgib teneinorpncin whergrees Diary Rpt
(Canaecten comply wal nisart Sich Astate ECAC,
Ahead 95 Sarat ear,
Vea Grannies nth phos cormecwunt di
nlcinocl cay Sorin anpt taken teres
[gece areola]
Peed Gen ‘som ate Gomty
PROPOSED ADDITION TO BEACH HOUSE MARX LOVERIDGE £:100 @AZ :200QA4 MARAT AG
Doeryiae or
oak
9 ARAKOON CRESCENT SUNSHINE BEACH
‘SITE PLAN / ROOF PLAN.
(Creargho.
0702WD.01
O
Bis eT em)
Page 23
oO 70°'GMZ020 Nvtd 113057 HOV3G JNHSNNS LN3OSTYO NOONVUYS ; won _) Werea aut ae a ema xml : js ‘MECTY GP ALITY SPAURS DE AD CRIT Welw re SK0 l=] 2M Mae rYBOR: ZyBooI —_SeAREAOT avi ISNOH HOVaA Qi NOLLIGGY O3SOdOud eres sebh meetin anon seen nm bong tap | 1JA31- NV1d YOOT4 wo MN - ez = \ \ 80° \ \ \ Ly \ \ \ Fa Y F = Ly buy Have © a _ fadaviis MOH Ssow OMISTG 30 DAD ony] zuvO dele Ta) ee tel WOOY 3801S q soveols 24 L To | / »0E,9P0P8b ~“6SS-r1 ARAKOON Buyjomg Sunsixa
Page 24
O £0°0MZ020 NW1dZ 13037 HOVE SNHSNNS IN3OSTHO NOOMVEYS =,
Ul To {aa sem cd metneo a7 "pial yarn agememny eg
eet oro R0l=) OVE LUA pyYDORs TBO 300RGA07 IVA 3SNOH HOVE Ol NOLLIOTY G3SOdOUd ra oe ee eS
Aqueg ~ 3 0 Pag “eedryy Cheng teeta nparhicou pai attr a
2 13A31° NV1Id YOOT4
Sum age gna Opn aL pees WL
CRESCENT
ony
zee td
(OUUEND UI HEN
war
q
ON
sOE.OP HBL
ARAKO
Buyjjeng Gunsix3
Page 25
StS) = =] a
[Sled ee e286)
CRESCENT
OHY
dehe we
feuueuD 4 TPN
wel
ARAKOON
O yO'OMz00 Avide 72A71 HOV3E BNIHSNNS 1N3OS3YO ROOMY S
im teen wide oe)
OM dR UNA pYBoK:) Z¥BoOK| «= JOURACT WA 3SNOH HOW3A OL ROUIOIY G3S0d0ud
fquag ~ = = py
mR
phages Cap ridley H{sfen pen per otesae
sCupmp oem, CRUE p peeeMemEe trl ITU LCIMAND ARR
“KA pea en yey EEEPATAMS 2 POT
Lait’ <ddeapaieh uaeicteete tabetononpaesenaanicd
‘Tradirg p Lyre) crap unper foi pame GLI
«0C,9P P81
€ T3Ad1- NV1d YOOTS
dre Lagoa wap reas oa TeN
pecereeee oth
9862 ©
Buyjemg Sugsra
Page 26
oO $0°0Mz0/0 SNOLLVAA HOVE ANHSNNS LNZOSSUD NOONVEY 6 ‘a
coat Coven L lvctet bralade Lendbedecart
ee ee = see ~— = ‘See
maT EL
[eel ie ela eeic| OV ORM PY Boor: Z¥ DoF 39CMaA01 MAYA 3SNOH HOV3E OL NOWIOGY C3S0d0ud SSR yO0 F Ny Gaps nee pra AD EET
Jena ~~ 7 oD ray ‘erty piper coe gpiopert.noy pee ig oe Corre OL
Amin
OOl} — uogena}3 nog QOL) — UOgeAd|z ISON
a lala >
mrt onan 4
peganoans"™) 5 semen =
— emcomcer 2
geen a el + z Sanc82 2 che po eae
sono petra he ws = = —
= tovomeo:
= nS ssn amine jE==
P88 waar = .
Cie “ “Cinta
- nts ws are
satepacors
tugs
peptruco ssn
scp pasty ureaane 2380 tupem2pmccmgo
3SNOH ONES
NOLOGY G380d08d
COL} «— UOREASTZ YON OOF} © uogeas|y se3
008s me Reapon pains mir — | | ee
eyo Aa pm 1 ame ear
: Eg
= _ aan
eT i _# os = seid Miya
ms — q—=—————] == wie = arom tS tna ns0
{=} Doeee7 a
codon i] bau
Ourpepranqmyon oo] sms puoan—
———— a
= : pot —— =
rat ‘_— Ope saa sume 4
sana ono ——= += bea aw gad ope om we B 4
= | al
SS == seta ama eases
tno ngt aaa = mde poste aD
eine e062 i
— a ‘ idinpaceee maspig 800
meee adh 0 orcas peocmgens rae DRS
Partha pasa Bacon Sano ow at pomtruna eT
1806 —_——________»
NOILOGYG3S000ud @ e NOlLidaY Gasodoud
Page 27
xn _ To [AND USE SECTION FEES aia — RECEIPT TYPE SALE OF DOCUMENTS . : . " Superseded Planning Scheme Documentation : : 520 Copy of Permit/Approval Letter ‘ 110. The Noosa Plan Documentation : “4140 APPLICATION FEES ~ : Material Change7of Use ¢Cedelihpact - . Consisten? Sos 521 neonsistent , Lo j 521 Assessment under Superseded Planning Scheme : _ $21 . Modification to a Development Permit : : §21 ‘Extension of a Currency Period . §21 Operational Works - Landscaping : 521 Bldg Work assessable against the Planning Scheme : _. 521 @> Lovcement Review oo Half Hour . §22 One Hour . . 522 ADVERTISING Purchase Advertised Applications . 523 JETTIES 7 Jetty Application Fee . : : : 524 Jetty Bond. . . : _ AS! (ue) BONDS vo : * Performance Bond , . — - 50 SIGNS SC _ Registration Fee : : : , _. _ 222 ‘SEARCHFEE 7 : @ Search of Land Use Section file . a 112 Liquor Licensing Request — ce . 113 TOTAL $ S?7S. NAME: -§ (NG bore wage ADDRESS: ate fo Bere” (2b! . -WIOCesA HteAd 5. estes FILE NO: C7] 3. ____DATE: (57.3 (7? RECEIPT NO: AAC agg? _. Signature of TP Officer: eS are 9 ° . : v AUTHORITY. NO: aN 7 “S (2?(r20% | yes),
Used in these records
07/0463 - Op Works - Addition to Existing Single House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.