Council archive · source document
07/0463 - Op Works - Addition to Existing Single House [As Published] · 172007.463
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Operational work that is tidal work or 9. The application involves operational work that is: ( tick the applicable box/es)
work in coastal management district . -
For more information refer to Guide 18. Far (JQ) tidal work" as defined under the Coasta! Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - compfete Part M of Form 1; or
va government arniirenereen J Gi) tidal work that is prescribed tidal work"' other than in a canal2 -complete Part P of Form 1; OF
the aprcaton rome assessment by tha , DO di) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
ite nn fea GPAs the assessment (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
ecaton, EPA a other than those works in tidal water} where the development has been determined not
concurrence agency for the application
refation to this matter. sepicaton in to be assessable against the Water Act 2000 ;
Local government is the assessment manager (1b) constructing a canal’? intended to be connected to tidal waters;
for all prescribed tidal work. . te
Ci (c) constructing an artificial waterway;
(1) (a) reclaiming land under tidal water,
C1 (e) disposing of dredge spoil or other solid waste material in tidal water,
(L) () _ interfering with quarry material on State coastal land above high-water mark;
(1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(Ci) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal {and, above high-water mark; or
§1 (iv) none of the above.
Operational work below high water 10. The application involves operational work that is: ( tick the applicable box/es)
mark C1 (i) tidal work'3 as defined under the Coastal Protection and Mana:
, . gement Act 1995 (the
Me eet shout eased ioe work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
eee kidal areas oe aike2t 7 (Gil tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
GH, te epson riggers refer C1 Gi) carried out within a coastal management distict'S under the Coastal Act and for -
aig popepernerenenay , Oe Geposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager ,
for all prescribed tidal work. (1 (6) reclaiming Jand under tidat water - complete Part M of Form 1; or
(©) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
iv) none of the above.
RA (iv) none of the abo
Coastal management 11. The application involves: (tick the applicable box/es)
For more information rater to Guide 18, C(i) amaterial change of use assessable under a planning scheme involving operational
it Po eppanan regures eave erat the work carried out completely or party in a coastal management district"
Environmental Protection Agency (EPA). Ci (i) a material change of use assessable under a planning scheme involving building
ian agency other than EPA's the assessment work, carried out completely or partly in a coastal management district that is -
Soren ageey ta ta gph in « the construction of a new premises with a GFA'® of at least 100m?
elation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
C1 (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 () reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? — complete Part M of Form 1
Rw none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain Gdal works completely or partly within a focal government tidal area.
15 Coastal management district is defined in sch 10 of the 1PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an erea declared as 4
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean tha gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the apptication is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must bo
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0463 - Op Works - Addition to Existing Single House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.