Council archive · source document
07/0463 - Op Works - Addition to Existing Single House [As Published] · 172007.463
hy INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004 Form 1 Development Application ro Operational &/or building work + assessable against a local government’s planning scheme < | | Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme. Nature of the application 1. This application is for (tick one (1) or both if applicable) A development permit authorises imi - ie q 4a a cna QO Proiminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage approval Is a step in the approval process - and does not authorise development to occur. The types of work that are assessable against a planning scheme are determined by the AND/OR saan for apestoule foal government ard EX] Development permit - provide details of the type of work eg. reacwork, stormwater, water and sewerage ” infrastructure, etc To determine the f work that esceesable under parla laming [ ADDITION TO EXISTING SINGLE HOUSE IN COASTAL PROTECTION AREA_ scheme, contact the relevant local . +NEW roo goverment. 2. Are the works subsequent to a previous development approval? (NO [DYES - provide details of al! previous approvals (eg. file references) 3. Is the subdivision for a canal estate? NO (Yes Fonable Long Service Leave levy (if | 4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal? 9) Prior to issuing a development permit for the kw YES - complete 05 works, the assessment manager is required oO NO - 5, 6 & 7 do not apply by law to “sight” an approved form, issued by Qleave, which signifies that the PLSLlevy |. Has the PLSL levy been paid? has bean paid, (YES - completeas LX] NO - the appticable fevy must be paid before a development permit can be given for the works 6. How much was paid? : 7. Whatis the receipt number of the payment? PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (applicable to assessment manager) DATE RECEIVED REFERENCE NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0463 - Op Works - Addition to Existing Single House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.