Skip to the record
Accept no imitations.

Council archive · source document

07/0463 - Op Works - Addition to Existing Single House [As Published] · 172007.463

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

hy
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004

   

Form 1 Development Application

ro

 

Operational &/or building work +
assessable against a local government’s planning scheme < | |

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

 

 

 

Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises imi - ie q
4a a cna QO Proiminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval Is a step in the approval process -
and does not authorise development to occur.
The types of work that are assessable against
a planning scheme are determined by the AND/OR
saan for apestoule foal government ard EX] Development permit - provide details of the type of work eg. reacwork, stormwater, water and sewerage
” infrastructure, etc
To determine the f work that
esceesable under parla laming [ ADDITION TO EXISTING SINGLE HOUSE IN COASTAL PROTECTION AREA_
scheme, contact the relevant local . +NEW roo
goverment. 2. Are the works subsequent to a previous development approval?
(NO [DYES - provide details of al! previous approvals (eg. file references)

 

3. Is the subdivision for a canal estate?

 

NO (Yes
Fonable Long Service Leave levy (if | 4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
9)
Prior to issuing a development permit for the kw YES - complete 05
works, the assessment manager is required oO NO - 5, 6 & 7 do not apply

by law to “sight” an approved form, issued by
Qleave, which signifies that the PLSLlevy |. Has the PLSL levy been paid?

has bean paid, (YES - completeas
LX] NO - the appticable fevy must be paid before a development permit can be given for the works

6. How much was paid? :
7. Whatis the receipt number of the payment?

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

 

 

 

OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED

 

REFERENCE
NUMBER/S

 

 

 

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0463 - Op Works - Addition to Existing Single House [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.