Council archive · source document
Tod Eng Part2 · OPW16/0021
Attached to the e-mail OPW16/0021 - Operational Works Application 3 of 4.
_
SEDIMENT CONTROL FENCE
EROSION AND SEDIMENT CONTROL PLAN
2000 NAX
be DISTURBED AREA
Ye ~
/ DIRECTION
OF FLOW STAR PICKETS
WIRE OR —
eS eee
»*
»
GEOTEXTILE FILTER
FABRIC
SEDIMENT CONTROL :
» PROVIDE SEDIMENT CONTROL TO THE BOUNDARIES
BY WAY OF SEDIMENT FENCES.
FENCES TO BE ERECTED BEFORE COMMENCEMENT
OF EARTHWORKS, AND SHALL BE MAINTAINED UNTIL
GRASS COVER AND LANDSCAPING IS ESTABLISHED.
DURING WORKS, ALL CONSTRUCTION RUBBISH TO BE
SEDIMENT CONTROL FENCE CONTAINED WITHIN AN APPROVED BIN.
NOT TO SOLE
COPYRIGHT © ‘Associated Consultants Client Drawn Verified Project Drawing Tile Scale ISheat Size
copyghtinaccordonce wth the UNIVERSAL PROPERTY A VENESS S. PRYSTUPA PROPOSED NEW RESIDENCE AT EROSION AND SEDIMENT AS SHOWN! A1
esigne jerife
COMPANY H. GRAY s.prystupa _|71 SEAVIEW TCE, SUNSHINE BEACH CONTROL Drawing Number
ESTABLISHMENT engineers & project managers Approved RPEQ No RDP RPA97117 14517-OP33
S.PRYSTUPA 1137 LOCAL AUTHORITY NOOSA
This drawing shat
for fon ATi) OPERATIONAL WORKS APPROVAL x Signed Date MCU APPROVAL — 14/0084 HORIZ DATUM MGA-DERIVED DCDB 9 10 2 4 so Sheet Revision!
‘issued for construction’ in the : ROL APPROVAL VERT DATUM AHD —AHD-PM103003 ual)
revision descri Rev] Date [Revision Description Drawn DECEMBER 2015 OPW APPROVAL RL 41.410 MEASUREMENT BAR - INCREMENTS IN mm 12 of 12 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Tod Eng Part2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.