Skip to the record
Every meeting, every word.

Council archive · source document

Appendix I - Planning Scheme Code Response · REC15/0011

Attached to the e-mail REC15/0011 - Development Application for Reconfiguration of a lot - 1 lot into 11 lots plus balance lot - Appendices F, G, H & I email 2 of 2.

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                       ENGINEERING WORKS CODES
                                                                                   The Noosa Plan


        O11            Not applicable. A dam is not proposed as part of this application.
                                 WASTE MANAGEMENT CODE
 Overall Outcomes                                        Comment
         A)       Not applicable. The proposal does not require the storage of on-site waste.
         B)       As above.
         C)       Any waste generated on-site during construction will be disposed off accordingly.
                  Further, it is expected that future dwellings will utilise Council’s waste collection
                  service.
Specific Outcomes                                        Comment
         O1       Not applicable. Waste separation is not required as several classes of waste will not
                  be generated.
     O2 – O7      Not applicable. Waste storage areas are not proposed as part of this application.
                               WATER SENSITIVE DESIGN CODE
 Overall Outcomes                                        Comment
         A)       The proposed development incorporates a bio-retention basin on Lot 800 for
                  treatment of stormwater run-off
         B)       The proposed development will be connected to Councils reticulated wastewater
                  service.
         C)       As above.
         D)       The proposed development will not adversely impact on the environmental flows of
                  receiving waters.
         E)       Not applicable. No water reuse facilities are proposed as part of this application.
Specific Outcomes                                        Comment
         O1       The proposed development incorporates a bio-retention basin on Lot 800 for
                  treatment of stormwater run-off.
         O2       Not applicable. no water storage devices are proposed as part of this application
         O3       Stormwater will not be utilised for reuse. Stormwater will be discharged west of the
                  basin to the creek.
         O4       The proposed development will ensure a non-worsening level of stormwater quality
                  and quantity such that the environmental flows of receiving waters are maintained.
         O5       Not applicable. The subject land is not included in the Shire Business Centre
         O6       The proposed development will comply with the water quality standards in Table 2 of
                  the SEQ Regional Plan Implementation Guideline No. 7 for Water Sensitive Urban
                  Design.
         O7       Not applicable. The subject land is not included in the Shire Business Centre
         O8       Not applicable. A water re-use facility is not proposed as part of this application.
         O9       The proposed detention basins are shown on the Proposal Plans included at
                  Appendix B.
        O10       Not applicable. The subject land is not included in the Shire Business Centre
WATER SUPPLY AND SEWERAGE RETICULATION CODE
 Overall Outcomes                                        Comment
         A)       Water and Sewerage Reticulation will be designed and constructed in accordance
                  with Council requirements.
         B)       Noted.     All associated infrastructure and connections will be designed and
                  constructed in accordance with acceptable engineering design standards.
         C)       Noted.
Specific Outcomes                                        Comment
     O1 – O7      Water supply infrastructure to service the proposed development will be designed
                  and constructed in accordance with Council requirements. Future details will be
                  provided as part of a future operational works application.
     O8- O14      The proposed development will achieve sewer connection, please refer to
                  Engineering Report included at Appendix D.

Used in these records

About this file

File size
99 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix I - Planning Scheme Code Response.pdf · 99 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.