ENGINEERING WORKS CODES
The Noosa Plan
O11 Not applicable. A dam is not proposed as part of this application.
WASTE MANAGEMENT CODE
Overall Outcomes Comment
A) Not applicable. The proposal does not require the storage of on-site waste.
B) As above.
C) Any waste generated on-site during construction will be disposed off accordingly.
Further, it is expected that future dwellings will utilise Council’s waste collection
service.
Specific Outcomes Comment
O1 Not applicable. Waste separation is not required as several classes of waste will not
be generated.
O2 – O7 Not applicable. Waste storage areas are not proposed as part of this application.
WATER SENSITIVE DESIGN CODE
Overall Outcomes Comment
A) The proposed development incorporates a bio-retention basin on Lot 800 for
treatment of stormwater run-off
B) The proposed development will be connected to Councils reticulated wastewater
service.
C) As above.
D) The proposed development will not adversely impact on the environmental flows of
receiving waters.
E) Not applicable. No water reuse facilities are proposed as part of this application.
Specific Outcomes Comment
O1 The proposed development incorporates a bio-retention basin on Lot 800 for
treatment of stormwater run-off.
O2 Not applicable. no water storage devices are proposed as part of this application
O3 Stormwater will not be utilised for reuse. Stormwater will be discharged west of the
basin to the creek.
O4 The proposed development will ensure a non-worsening level of stormwater quality
and quantity such that the environmental flows of receiving waters are maintained.
O5 Not applicable. The subject land is not included in the Shire Business Centre
O6 The proposed development will comply with the water quality standards in Table 2 of
the SEQ Regional Plan Implementation Guideline No. 7 for Water Sensitive Urban
Design.
O7 Not applicable. The subject land is not included in the Shire Business Centre
O8 Not applicable. A water re-use facility is not proposed as part of this application.
O9 The proposed detention basins are shown on the Proposal Plans included at
Appendix B.
O10 Not applicable. The subject land is not included in the Shire Business Centre
WATER SUPPLY AND SEWERAGE RETICULATION CODE
Overall Outcomes Comment
A) Water and Sewerage Reticulation will be designed and constructed in accordance
with Council requirements.
B) Noted. All associated infrastructure and connections will be designed and
constructed in accordance with acceptable engineering design standards.
C) Noted.
Specific Outcomes Comment
O1 – O7 Water supply infrastructure to service the proposed development will be designed
and constructed in accordance with Council requirements. Future details will be
provided as part of a future operational works application.
O8- O14 The proposed development will achieve sewer connection, please refer to
Engineering Report included at Appendix D.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix I - Planning Scheme Code Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 99 KB (small file)
- File type
No other editions are linked here.