Council archive · source document
Decision Notice - 010.2007.00002125.001 [As Published] · 142007.2125
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/2125 Date of Decision: 4 February 2008
1. APPLICANT DETAILS
Name: BMD Major Projects
PO Box 197
Postal address: WYNNUM QLD 4178
Phone no: 5474 3065 Fax no:
2. PROPERTY DESCRIPTION
Street address: 184 Eumundi Noosa Road NOOSAVILLE, 178-182 Eumundi Noosa Road NOOSAVILLE
Real property LOT: 1 RP: 133192, LOT: 21 RP: 867627
description:
3. OWNER DETAILS
Name: Bunnings Properties Pty Ltd
Postal address: CARE The National Property Manager
Locked Bag 30 GRANVILLE NSW 2142
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Operational Works - Bulk In accordance with Engineering
Earthworks drawings Nos.
3501/54/01-001 undated Cardno
CB0849-ESC01-C dated 13
December 2007 BMD Consulting
CB0849-ESC02-B dated 13
December 2007 BMD Consulting
CB0849-ESC03-B dated 13
December 2007 BMD Consulting
CB0849-ESC04-A dated 12
October 2007 BMD Consulting
or as modified herein.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 10 6. DECISION DETAILS Council decided to approve this application on 4 February 2008, subject to conditions. 7. APPLICABLE CODES The developer must comply with the following codes for self-assessable development related to the development approved under this Development Permit:- N/A. 8. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. 9. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit N/A 10. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 11. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 10
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. The development shall be carried out in accordance with Engineering drawings Nos.
3501/54/01-001 undated Cardno
CB0849-ESC01-C dated 13 December 2007 BMD Consulting
CB0849-ESC02-B dated 13 December 2007 BMD Consulting
CB0849-ESC03-B dated 13 December 2007 BMD Consulting
CB0849-ESC04-A dated 12 October 2007 BMD Consulting
or as modified herein.
2. All Council approved plans must be signed by an engineer (RPEQ) prior to being issued for construction
purposes. Only plans signed by an engineer (RPEQ) and having the stamped approval of the relevant
Council Officer shall be used on site for construction purposes. In this regard copies of the stamped
approved plans shall be provided to Council’s Construction Technical Officer at the pre-start meeting and
shall be provided to all contractors with additional copies made available on site.
3. Existing trees in the south west corner of the property, along the Eumundi Noosa Road boundary and in
the south east corner of the property shall be retained. An on site inspection with Council staff shall be
undertaken prior to works commencing to determine which trees are to be marked for retention.
4. All vehicles shall enter and exit the site via the Gateway Drive access. All vehicles exiting the site are to
cross the vehicle wash down facility provided at this access. No vehicles are permitted to exit the site via
the Eumundi Noosa Road /Rene Street roundabout.
5. A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
placing additional fill, prior to such fill being placed.
Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the
existing levels prior to the rear and side boundaries of the property. Batters shall be at a maximum grade
of 1:4 unless retained by a wall.
Any existing fill or natural materials on the site or within the extent of approved works external to the site
which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's requirements shall
be removed and replaced with suitable material.
6. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that
all lots have been compacted to the required standard.
Any existing fill on the site that does not comply with Council’s requirements shall be removed at the
direction of the Manager - Land Development prior to additional filling works commencing.
7. Following completion of the filling works, the registered practicing Geotechnical Engineer supervising the
works shall submit compaction tests across the entire filled areas and a site classification report for each
lot subject to filling. The extent of fill and site classification shall be shown on the geotechnical engineer’s
certification.
An appropriate property notation shall be placed on Council's rates records to advise prospective
purchasers of lots that have been filled that special foundations requirements will apply.
8. The exposed surface including the sediment basins must be grass seeded immediately after the
earthworks have been completed.
9. Drainage paths/structures must be provided within the subject site for runoff from the upstream property,
Lot 26 SP 151406. The drainage paths/structures shall be sufficient to convey the current flows through
the subject property to the culvert under Gateway Drive.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 10
10. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the development.
The location and type of device to be installed shall be established at the “pre start” meeting with
Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
11. A site control and/or compliance bond of $20,000 is to be submitted to Council prior to the pre-start
meeting. The pre-start meeting will only be held once Council's Construction Technical Officer has
confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with these
conditions or any additional inspections incurred for substandard work or work undertaken not in
accordance with this permit.
12. Council’s Construction Technical Officer Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.
13. The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.
14. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
signed approved drawings and conditions by the applicant.
15. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council’s Construction Technical Officer or nominated staff.
16. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).
17. Council standards shall apply to these works unless otherwise modified herein.
18. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
19. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
20. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
21. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
22. Safe pedestrian access on Eumundi Noosa Road shall be maintained at all times. Should footpath / road
closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410
512 505) must be notified prior to the proposed closure.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 10
22. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on
drawings Nos. CB0849-ESC01-C, CB0849-ESC02-B, CB0849-ESC03-B, CB0849-ESC04-A Council’s
Manager – Land Development may request further controls to be installed should approved measures be
inefficient.
23. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
from the day this permit takes effect (4 February 2010) during which time all conditions must have been
complied with and the Plan of Survey lodged with the Council for endorsement.
24. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply.
Water & Sewerage
This Decision Notice is issued subject to and conditional upon the relevant Approved
Development Permit having been granted to the applicant.
25. Existing sewer to be capped at the eastern boundary to the satisfaction of Noosa Council’s Water and
Sewerage Capital Works Manager – Mike Froude (Ph 5449 5288).
26. The names of any proposed contractors for works are to be submitted in writing, together with copies of
current Public Liability and Workers Compensation Insurances together with certificates of currency for
those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings
and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No other
contractor or subcontractor shall be engaged to carry out the works or any part of the works without the
written approval of the Assessment Manager.
27. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
Inspector will not be available outside these hours unless prior approval is obtained from the Water &
Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
met by the Contractor/Developer. These costs will be in addition to normal inspection fees.
28. It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable
care during the construction of the engineering works to ensure that Council property or facilities (such as
underground drainage, water supply and sewerage) are protected against any damage or interference
whatsoever. If any Council property or facilities should be damaged by the applicant or any of its
consultants or contractors through any cause whatsoever in the course of, directly or indirectly, carrying
out the engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
Manager and shall forthwith rectify the damage to that property or facility at its cost to the satisfaction of
the Assessment Manager prior to the sealing of the survey plan and/or acceptance of the works on-
maintenance. Alternatively, the applicant may request the Council to carry out the rectification work at the
applicant's cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan
and/or acceptance of the works 'on maintenance' provided that in the case of emergency, the Council
shall be entitled to rectify such damage at the cost of the applicant such cost being paid prior to the
sealing of the survey plan and/or acceptance of the work 'on maintenance’.
29. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56
coordinate value to the standards and requirements of the Assessment Manager are required for Council
records. Such 'as constructed' drawings will be required prior to works being accepted "on maintenance",
where applicable. Requirements for "as constructed" information are detailed in the current version of
Council's Engineering Design Standards (Water & Sewerage) Manual.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 10
Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until
lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
29. Construction work and other associated activities are permitted only during the hours of 7:00am and
6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Assessment Manager or his nominee.
30. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional fee of
$160.00 (included below) is required to cover costs associated with these live sewer works.
32. Fees applicable to the above project are listed below <and are to be paid within fourteen (14) days of the date
of this Decision Notice.
Live sewer inspection $ 160.00
BALANCE OWING $ 160.00
33. Approval of these works has been taken as a Notice of intention to commence works on the development.
When making payment, please ensure that the attached Payment Schedule is returned
for the Cashier’s use and to facilitate prompt programming of the work.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 10
12. WATER & SEWERAGE WORKS
PO Box 141, Tewantin, Q 4565
13. PAY-IN SHEET / TAX INVOICE
2007/2008
ABN 97 969 214 121 PLEASE PRESENT TO CASHIER WHEN MAKING PAYMENT
Amount incl
GST Receipt Type JOB DESCRIPTION
GST
586 178-182 Eumundi Noosa Rd
Live Sewer Inspection (2007/08 $160.00) N/A $160.00
(32/12008.423.715)
Name Date Paid: ___________________
Addres Receipt No: ___________________
s Total GST $NIL
File/s 2007/2125 Total incl. GST $160.00 Cashier - please return form to W&S Section
C:\DOCUME~1\amoore\LOCALS~1\Temp\BCL Technologies\easyPDF 5\@BCL@D00F88D5\@[email protected]
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 10
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. Should any changes or modifications to the approved plans be required as a result of construction constraints, a
Change to an Existing Approval Application under the Integrated Planning Act must be made. Amended plans
clearly indicating the changes must be lodged with this application along with the appropriate fees.
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 10
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to against the part of the approval that represents the
development applications concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(2) The appeal must be started within 20 business (superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day if it were an application under a superseded planning
the decision notice or negotiated decision notice is scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact started at any time after the last day the decision on
assessment and code assessment, appeal rights for the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
1
Section 3.1.6 (Preliminary approval may override local planning or cancel a condition of a development approval.
instrument)
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 10
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]
Used in these records
Decision Notice - 010.2007.00002125.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 49 KB (small file)
- File type
No other editions are linked here.