1.     The development shall be carried out in accordance with Engineering drawings Nos.

              3501/54/01-001        undated Cardno

              CB0849-ESC01-C        dated 13 December 2007 BMD Consulting

              CB0849-ESC02-B        dated 13 December 2007 BMD Consulting

              CB0849-ESC03-B        dated 13 December 2007 BMD Consulting

              CB0849-ESC04-A        dated 12 October 2007 BMD Consulting

              or as modified herein.

2.     All Council approved plans must be signed by an engineer (RPEQ) prior to being issued for construction
       purposes. Only plans signed by an engineer (RPEQ) and having the stamped approval of the relevant
       Council Officer shall be used on site for construction purposes. In this regard copies of the stamped
       approved plans shall be provided to Council’s Construction Technical Officer at the pre-start meeting and
       shall be provided to all contractors with additional copies made available on site.

3.     Existing trees in the south west corner of the property, along the Eumundi Noosa Road boundary and in
       the south east corner of the property shall be retained. An on site inspection with Council staff shall be
       undertaken prior to works commencing to determine which trees are to be marked for retention.

4.     All vehicles shall enter and exit the site via the Gateway Drive access. All vehicles exiting the site are to
       cross the vehicle wash down facility provided at this access. No vehicles are permitted to exit the site via
       the Eumundi Noosa Road /Rene Street roundabout.

5.     A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
       placing additional fill, prior to such fill being placed.
       Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the
       existing levels prior to the rear and side boundaries of the property. Batters shall be at a maximum grade
       of 1:4 unless retained by a wall.

       Any existing fill or natural materials on the site or within the extent of approved works external to the site
       which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's requirements shall
       be removed and replaced with suitable material.
6.     Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
       registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that
       all lots have been compacted to the required standard.
       Any existing fill on the site that does not comply with Council’s requirements shall be removed at the
       direction of the Manager - Land Development prior to additional filling works commencing.
7.     Following completion of the filling works, the registered practicing Geotechnical Engineer supervising the
       works shall submit compaction tests across the entire filled areas and a site classification report for each
       lot subject to filling. The extent of fill and site classification shall be shown on the geotechnical engineer’s
       certification.
       An appropriate property notation shall be placed on Council's rates records to advise prospective
       purchasers of lots that have been filled that special foundations requirements will apply.
8.     The exposed surface including the sediment basins must be grass seeded immediately after the
       earthworks have been completed.

9.     Drainage paths/structures must be provided within the subject site for runoff from the upstream property,
       Lot 26 SP 151406. The drainage paths/structures shall be sufficient to convey the current flows through
       the subject property to the culvert under Gateway Drive.




NSC c:\docume~1\amoore\locals~1\temp\bcl technologies\easypdf 5\@bcl@d00f88d5\@[email protected]

Used in these records

About this file

File size
49 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002125.001 [As Published].pdf · 49 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.