Original source · versioned page text
2021-02-09 P&E Agenda - Item 6 - Attachment 2 - Draft Noosa Bushland Reserve Strategic Fire Management Plan 2021
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Bushfire FMU Asset Protection Zone Fire unit Maintenance
Interface Assessment (APZ) access requirements
Zone risk Fire access Fuel
assessment trail width Reduction
Zone (FRZ)
width
one way
access.
Narrow 3m N/A N/A control Slashing/mowing
vegetation line only every 3 months
corridor
6 >20 degree N/A 10m N/A FRZ every 4 years
slope and/or
highly erodible
soil.
Category D Industrial, commercial, agricultural
7 <20 degrees 3m N/A Small fire Fire trails every 5
appliance months
can have
one way
access.
Narrow 3m N/A N/A control Slashing/mowing
vegetation line only every 5 months
corridor
8 >20 degree N/A 6m N/A FRZ every 5 years
slope and/or
highly erodible
soil.
Table 8. Guidelines for fire trails/FRZ for bushland reserves with High to Very High bushfire risk.
Fire trails/FRZ that do not meet these standards in relation to their priority grouping will roll into the
fire trail operational works program.
6.3 New fire trails and FRZs
As per Table 8 the width of the fire trail/FRZ depends on topography, requirements for fire appliance
access and the vulnerability of neighbouring buildings. Where topography is not conducive of
locating a fire trail on a bushland reserve, neighbours are encouraged to maintain fire trails on their
land.
Prior to the development of new fire trials/FRZ, the potential impacts of works will need to be
undertaken by Council staff. The following matters will need to be considered when establishing new
fire trails:
Potential erosion
Impacts on environmentally significant vegetation and habitat such as Matters of National
and State Significance (i.e. threatened species and habitat)
Possible cultural heritage sites
Fire trails need to be well formed, drained, gated and signed
New trails can escalate other issues such as illegal access, camping and rubbish disposal.
Council receives requests from a number of sources concerning fire management. Figure 5 below
provides a decision tool for requests concerning new fire trails, FRZ’s and/or burns for bushland
reserves.
DRAFT Noosa Bushland Reserve Strategic Fire Management Plan Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.