2021-02-09 P&E Agenda - Item 6 - Attachment 2 - Draft Noosa Bushland Reserve Strategic Fire Management Plan 2021
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Action Indicator Responsibility Timeframe Cost
Engage with key Attend Area Fire Council As per AFMG In-house
stakeholders such Management Environmental meeting schedule
as QFES, QPWS Groups (AFMG) as Services Engagement as
and Traditional required to inform required
Owners on fire Operation Cool
management Burn.
Engage with
Traditional owners
on cultural burning
practices where
appropriate
Develop multi- 3 multi-agency Disaster Annual TBA/plan
agency fire plans are developed Management Branch consultant
management plans each year
for key high risk
localities (11
identified in total)
7.2 5-Year Fire Management Operational Plan
The Noosa Bushland Reserve Strategic Fire Management Plan 2021, through its bushfire risk
assessment process, identifies 60 reserves with very high to high risk ratings. For a complete listing
of the High and Very High priority reserves see Appendix 8.1. These reserves are targeted for
operational works to mitigate bushfire risk and are identified in a 5-year Operational Plan.
The final listing of high priority bushland reserves and FMUs are kept on a separate spreadsheet to
this Plan to allow annual updates. An example is shown below:
Reserve name Reserve risk Priority Fire Risk mitigation New risk Timing of
rating Management Planned burn rating works
Red-Very high Units (FMUs). Fire trail calculation (fn/yr)
(70-100) Identified in Fuel after risk
Brown-High reserve Fire reduction mitigation
(40-69) Management zone treatment
Yellow-Medium Plan (FMP) or closures
(20-39) through on-site
Green-Low inspection
(0-19)
Symplocus 76.8 FMU 3 FMU 3 planned burn 53.2 Year 1
Environment FMU 2 FMU 2 planned burn Year 5
Reserve Close reserve during
severe and above
FDI
Weyba Nature 41.6 FMU 4 FMU 4 planned burn 19.6 Year 2
Refuge FMU 3 & 1 Year 5
Close reserve during
severe and above
FDI
Sundial 31.2 FMU 1 FMU 1 planned burn 19.6 ongoing
Bushland
Reserve
Cooroy Creek 18.4 No planned No planned action 18.4 N/A
Bushland action
Reserve
Table 7. An example of the reserve risk assessment informs management actions.
DRAFT Noosa Bushland Reserve Strategic Fire Management Plan Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.