Original source · versioned page text
Minor Change Existing Approval RAL19 0037.01
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: RAL19/0037.01 Your Reference: M2843P 24 March 2022 K J Shaw Pty Ltd C/- JFP Urban Consultants Pty Ltd T1.209 Kon-Tiki Business Centre Tower 1/55 Plaza Parade MAROOCHYDORE QLD 4558 [email protected] [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 18 February 2022, requesting a minor change to an existing development approval. Council on 18 March 2022 decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: RAL19/0037.01 Street address: 98 , 82 & 66 Coveys Rd & 39 Tinbeerwah Rd Tinbeerwah Real property description: Lot 5 RP 172460, Lot 4 RP 172460, Lot 2 RP 172460 & Lot 7 RP 895754 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 8 April 2020 Development Permit for Reconfiguration of a Lot – Boundary Realignment In relation to the request to make a minor change to the existing approval, Council on 18 March 2022, decided to approve the requested changes. The changes are detailed below. Approve the change Amend conditions 2, 5, 19 & 20 currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions Must Be Complied With Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date M2843-01 B Proposal Plan Sheet 1 of 2, prepared by JFP Urban Consultants Pty Ltd 24.11.2021 M2843-01 - Proposal Plan Sheet 2 of 2, prepared by JFP Urban Consultants Pty Ltd 24.11.2021 J000545 V2 Bushfire Hazard Assessment and Management Plan prepared by North Coast Environmental Services 14.01.2022 All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. All future dwellings, outbuildings, effluent disposal and the like on the approved lots must be sited and constructed in accordance with the approved building envelopes shown on the Approved Plans. A copy of the approved plans must be included in the contract of sale for the approved lots, together with a clause which requires future dwellings, outbuildings, effluent disposal and the like to be constructed in accordance with it. The applicant must prepare a metes and bounds building envelopes plan indicating House site areas and effluent disposal areas, including outbuildings and the like for the proposed lots. The areas must be in accordance with the approved plans M2843-01 (Sheets 1 & 2) prepared by JFP Urban Consultants Pty Ltd, dated 24.11.2021. The plans must be submitted in both hardcopy and digital format (dwg) on GDA 94 zone 56 coordinates. The applicant must submit the plans to Council for approval prior to the endorsement of the Plan of Survey. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 9 April 2024, unless an application to extend the currency period is approved by Council. Boundary Encroachments Certification must be submitted to Council from a Licensed Surveyor which certifies that: the setback/s to any new boundaries for any existing buildings remaining on the site comply with the relevant provisions of the planning scheme and the Building Act 1975, unless varied by this Decision Notice all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement all existing effluent disposal areas are wholly located within the lot they serve and comply with the boundary setback requirements of the Plumbing and Drainage Act 2002 and associated codes and requirements all dams (including ponded water, dam walls and associated spillway structures) are wholly located within the boundaries of a single lot all retaining walls and structures are fully contained within the lot they retain any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties Effluent Disposal Sufficient area must be provided and retained on each lot for effluent disposal. Engineering Property Access and Driveways A residential driveway must be constructed to Lots 8, 9 and 12. The works must be undertaken in accordance with a written approval from Council and be constructed as part of any subsequent building approval for the respective lot. The following Property Notation or similar will be added to Council’s rates records for Lots 8, 9 and 12 to advise private certifiers, owners and prospective purchasers: Private Certifiers, owners and prospective purchasers are notified that special access requirements apply to this parcel of land. Contact Council’s Planning department for details. Stormwater Drainage Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. Electricity and Telecommunication Services Reticulated electricity and telecommunication services must be provided to each lot in accordance with the standards and requirements of the relevant service provider. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Ecological Bushfire The development must be carried out in accordance with section 6 of the Bushfire Hazard Assessment and Management Plan V2 listed within this Decision Notice. *(Refer to Advisory Note) A copy of the Bushfire Hazard Assessment and Management Plan V2 report listed within this Decision Notice must be provided to the nearest fire authority. Certification must be submitted to Council from a qualified person* which certifies that the development has been constructed in accordance with the bushfire management conditions of this Decision Notice. *(Refer to Advisory Note) referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Qualified Person Qualified Person, for the purpose of: Supervising and certifying Bushfire Management is considered to be an Ecologist with suitable experience or a person with Fire Protection Association Australia – Bushfire Planning and Design certification. Environmental Protection Areas of the site identified under the Biodiversity Overlay of the planning scheme must be conserved in accordance with the planning scheme and other relevant legislation. property notes The following property notes will be placed against the subject property in Council’s property record system: RAL19/0037 - Property Access Driveway The following notation applies to approved lots 8, 9 and 12: Private Certifiers, owners and prospective purchasers are notified that special access requirements apply to this parcel of land. Contact Council’s Planning department for details. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Lisa Pienaar Development Planner Enc: Appeal Rights Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice – 9 April 2020. Decision Notice - Minor RAL19/0037.01 – 18 Mach 2022; with an amendment to conditions 2, 5, 19 & 20 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 2 of 6 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.