HRP18103.L02.002_Change application · MCU16/0133.01
Attached to the e-mail Change to Development Application - MCU16/0133.01.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0133
Bicycle Parking and End of Trip Facilities
13. The proposal must provide 10 bicycle spaces, 5 lockers and 1 shower cubicle.
Water & Sewer Connections
14. An underground connection to reticulated water and sewerage must be provided to
the development site in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
15. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to the development site.
ENGINEERING
16. A minimum of 27 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business.
17. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
18. All landscaping, awnings and other structures in close proximity to the proposed
loading zone must be designed to ensure there is no obstruction or impact on the
function and use of the loading zone.
19. For traffic and pedestrian safety in Venture Drive, trucks and deliveries vehicles
reversing in or out of the loading zone to Venture Drive must be assisted by traffic
control.
20. The applicant must provide a 2.0m wide concrete footpath along the frontage of
the site to Vision Court which must extended to the northern boundary of the
adjoining lot to the south.
21. To ensure pedestrian safety between vehicles exiting the site and pedestrians on
the footpath, the driveway and any associated fencing or vegetation near the
driveway must comply with the minimum sight line requirements as defined in AS
2890.1, section 3.2.4.
Stormwater Drainage
22. Stormwater runoff from the development must be disposed of on-site generally in
accordance with the approved engineering plans without causing scour or damage
to the subject site or any adjoining property.
Electricity and Telecommunication Services
23. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
Landscaping Works
24. The development site must be landscaped. The works must be undertaken in
accordance with the approved plans and Planning Scheme Policy PSP 3
Landscaping Plants and Guidelines.
Page 3 of 21
Document Set ID: 20278602
Version: 1, Version Date: 22/02/2017 Print Date: 22 February 2017, 1:04 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
HRP18103.L02.002_Change application.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.