               Author                  Senior Development Planner, Andrew Gaffney
                                       Development Assessment



                  APPLICATION DETAILS

                  Application No.                  MCU24/0153 & OPW24/0202

                  Applicant                        Archend

                  Proposal                         Material Change of Use - Multiple dwellings (6x small dwellings)
                                                   Operational Works (Road Work, Drainage Work, Stormwater,
                                                   Earthworks, Car Parking & Landscaping)

                  Properly Made Date               27 November 2024

                  Information Request Date         24 December 2024

                  Information Response Date        25 March 2025 & 5 June 2025

                  Decision Due Date                11 August 2025

                  Report Reviewed &                Nadine Gorton 11.08.2025
                  Finalised By
                                                   G.Schramm


                  PROPERTY DETAILS

                  Property Address                 51 Elanda St Sunshine Beach Qld 4567

                  RP Description                   Lot 403 RP 48112

                  Land Area                        754 m²

                  Existing Use of Land             Dwelling house


                  STATUTORY DETAILS

                  SEQRP Designation                Urban Footprint

                  Zone                             High Density Residential zone

                  Precinct                         Not applicable

                  Local Plan Area                  Coastal Communities

                  Overlays                         Landslide Hazard Overlay (Moderate Hazard)

                  Assessment Type                  Code




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025
Full text of the other 27 pages

Page 2

               1.     PROPOSAL
               The application seeks development approval for a Material Change of Use - Multiple dwellings (6x
               small dwellings) and Operational Works (Road Work, Drainage Work, Stormwater, Earthworks,
               Car Parking & Landscaping).
               The site is located within the High Density Residential Zone and the Coastal Communities Local
               Plan Area under the Noosa Plan 2020 and is subject to the Landslide Hazard Overlay.
               The development consists of 2 x two-bedroom units at the ground level and 4 x three-bedroom
               units for levels 2 & 3. All proposed units are small dwellings (<100 m² gross floor area (GFA)).
               Other aspects of the development include request for two unroofed roof top terraces accessed by
               the upper two units only.
               The site's irregular fan shape and highly sloping topography results in a stepped built form. The
               proposal includes a basement carpark for 10 resident spaces (including 3 car stackers) and 2
               visitor spaces located at the site frontage.
               The site adjoins a public pedestrian pathway along the length of the southern side boundary. The
               path is approximately 3.6 metres in width and in certain sections in poor condition. As part of the
               application, the applicant requests upgrading of this pedestrian pathway to complement the
               development design and to also provide a safer pedestrian connection from the development and
               the members of the public east towards the coast.
               The locality and proposal plans are included below, Figures 1 – 4.




                                                        Figure 1 – Locality




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 3

                                       Figure 2 – Site Plan




                                       Figure 3 - Basement




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 4

                                       Figure 4 - Ground floor




                                         Figure 5 - Level 1




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 5

                                         Figure 6 - Level 2




                                               Roof
                                       Figure 7 – Floor Plans




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 6

                                       Figure 8 - Northern Elevation




                                       Figure 9 - Southern Elevation




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 7

                                                            Figure 10 – Elevations

               2.     APPLICATION BACKGROUND
               25 July 2024 - Pre-lodgement meeting held (Council Ref: PLM24/0024); preliminary advice
                              provided regarding basement encroachment, building height, stormwater
                              management, landscaping, and site access.
               28 Nov 2024 -           Development application lodged for a Material Change of Use (Multiple Dwelling
                                       - 6 units) and Operational Works (Engineering and Landscaping).
               24 Dec 2024 -           Council issued an Information Request.
               10 Jan 2025 -           Council issued a Further Advice Request identifying the need for additional detail
                                       on stormwater infrastructure, pedestrian access, earthworks, car parking, and
                                       service impacts.
               25 March 2025 - Applicant submitted a Further Advice Response including revised architectural,
                               engineering, landscape, and traffic documentation addressing Council’s
                               concerns.
               6 May 2025 -            Council issued a further advice outlining remaining matters including rooftop
                                       height encroachments, overlooking, communal pool location, and site cover
                                       calculations.
               5 June 2025 -           Applicant submitted a Further Issues Response with updated plans and
                                       justification for rooftop setbacks, privacy treatments, landscaping enhancements,
                                       and basement redesign only.
               In response to Council’s most recent further advice request on 6 May 2025 the applicant submitted
               amended architectural documentation however these amendments were not reflected in any
               subsequent Operational Works technical reporting or assessments.
               It is recommended that the Material Change of Use be issued as a Development Permit as
               requested by the applicant (subject to amended plans and operational works) with the updates to
               the technical reporting for Operational Works addressed as preliminary approval to ensure
               outstanding engineering matters are updated and resubmitted to Council for assessment and
               approval.


               3.     SITE DETAILS
               3.1. Site Description
               The site is described as Lot 403 on RP48112 and is located at 51 Elanda Street, Sunshine Beach.
               The site is 754 m² in area and is irregularly shaped, with a splayed configuration that presents a
               narrower frontage of approximately 12 metres, widening to approximately 22 metres at the eastern
               rear boundary.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 8

               The topography of the land slopes steeply from the site frontage (RL 50AHD) towards the rear
               boundary (RL 43AHD) and contains areas of the eastern side of the site within the moderate
               Landslide hazard overlay.
               The site is currently improved with a single dwelling house, which is proposed to be removed.
               During the assessment Council raised concerns about the determination of the ground level given
               that the site includes an existing dwelling. Information provided by the Applicant and prepared by
               a surveyor, indicates that the ground level has been lawfully changed. These ground levels have
               been incorporated within the latest proposal plans and elevations.
               3.2. Site History
               The site has been subject to a number of approvals involving applications for Demolition,
               Operational Works and minor building approvals dating back to 1995.
               Council approved a Duplex dwelling on 25 October 2002, application 132002.220489. The duplex
               comprised 4 levels with a maximum building height of RL58.72.
               3.3. Surrounding Land Uses
               North - 47 Elanda Street ‘Pacific Outlook’, is a 4 storey Multiple dwelling development (9 units)
               which gains vehicle access partially along the neighbouring side boundary to the subject site. This
               building contains three large rooftop terraces.
               South - 3.6 metre pedestrian accessway to Henderson Street and 53 Elanda Street, a 3 - 4 storey
               Multiple dwelling development (5 units).
               East – 19 Henderson Street, 2 storey Multiple dwelling and Sunshine Beach approximately 300
               metres to the east.
               West - Residential uses including large Dwellings houses contained within the Low Medium
               Density Residential zone.


               4.     ASSESSMENT
               4.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •    State Planning Policy;
               •    South East Queensland Regional Plan;
               •    Planning Regulation 2017; and
               •    Noosa Plan 2020 (25 September 2020).
               4.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •    High Density Residential Zone Code;
               •    Coastal Communities Local Plan Code;
               •    Dual Occupancy and Multiple Dwelling Use Code;
               •    Works Codes;
               •    Landslide hazard Overlay Code.
               The subject site is located in Sunshine Beach and is zoned High Density Residential. The proposed
               use is identified as a consistent use within the zone and is required to follow a code assessable
               application process.
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below:




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 9

                Criteria                   Planning Scheme           Proposal                           Complies


                Building height
                •    Storeys               3 storeys max             4   storeys    involving    the       X
                                                                     pedestrian access
                                                                                                           X
                                                                     12.6 metres (minor partial
                •    metres                12 metres
                                                                     rooftop           balustrade
                                                                     encroachments) TBC

                Site cover                 45%                       44%                                   

                Plot ratio                 0.75:1 max.= 565m² 0.76:1 = 571 m² GFA TBC                      X
                                           GFA

                Step Free access           1 in 3 multiple dwelling All units have access to the           
                                           units provide step free basement carpark and lift
                                           access

                Personal security and Main entrance clearly The proposal complies with the                 
                safety of residents   identifiable from the requirements
                                      street;
                                           Internal path network
                                           has clear sightlines;
                                           Visitors have    direct
                                           access    to     main
                                           entrance.

                Boundary setbacks
                Basement

                Frontage                   6.0 metres min            4.56 metres                           X
                Side (north)               1.5 metres min            0.3 – 1.5 metres                      X
                Side (south)               1.5 metres min            0.0 metres                            X
                Rear                       6.0 metres min            6.0 metres                            

                Ground Floor Plan / up to 4.5m

                Frontage                   6.0 metres min            13.2 metres                           
                Side (north)               1.5 – 2.0 metres min      1.5 metres                            X
                Side (south)               1.5 – 2.0 metres min      1.5 metres                            X
                Rear                       6.0 metres min            6.0 metres                            

                First Floor Plan / 4.5m – 7.5m

                Frontage                   6.0 metres min            13.2 metres                           
                Side (north)               2.0 – 2.5 metres min      1.5 metres to planter 2.0 metres      X
                                                                     to wall
                Side (south)               2.0 – 2.5 metres min      1.5 metres to planter 2.0 metres      X
                                                                     to wall
                Rear (eastern)             6.0 metres min            8.0 metres                            



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 10

                Criteria                   Planning Scheme           Proposal                          Complies


                Second Floor Plan / 7.5m – 10.0 metres

                Frontage                   10.0 metres min           13.2 metres                           
                Side (north)               2.5 – 3.0 metres min      1.5 to planter – 2.5 metres to        X
                                                                     wall
                                                                     1.5 to planter – 2.5 metres to
                Side (south)               2.5 – 3.0 metres min                                            X
                                                                     wall
                Rear
                                                                     8.0 metres                            
                                           8.0 metres

                Above 10.5 metres – Roof top

                Frontage                   10.0 metres min           More than 10 metres                   
                Side (north)               2.5 – 3.0 metres min      1.5 to planter – 2.5 metres to        X
                                                                     wall
                Side (south)                                                                               X
                                                                     1.5 to planter – 2.5 metres to
                Rear                       2.5 – 3.0 metres min
                                                                     wall
                                           8.0 metres                                                      
                                                                     8.0 metres

                Landscaping
                Landscaped open space 264m² min                      306 m²                                
                Soft landscaping           158m² min 60% of 168 m²                                         
                                           total

                Private open space         25 m² min – ground All units are located above                  
                                           level              ground level
                                           12m² - above ground
                                           level                                                           

                Carparking                 10 covered min            10 covered                            
                                           2 uncovered min           2 visitor uncovered                   

                Bicycle Spaces             3 bicycle spaces          3 bicycle spaces in basement          
                End of Trip Facilities*
                *(required only where 5    na
                + spaces are required)


               Plot ratio
               Acceptable Outcome PO8 of the High Density Residential Zone Code states for development
               which provides a ratio of at least three small dwellings to every one other dwelling, plot ratio does
               not exceed 0.75:1 for sites up to and including 7,000m2.
               Assessment
               The proposal has omitted to include the portions of the laundry and kitchen areas in GFA
               calculations. Compliance with plot ratio is a Performance Outcome within the zone and there is no
               reason for the exclusion of these areas. The GFA will be required to be reduced to ensure
               compliance and conditions have been included as part of plan amendments for resubmission and
               endorsement.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 11

               Building Height
               Acceptable Outcome AO5.2 of the High Density Residential Zone Code states:
               AO5.2 Where excavation is required, the maximum portion of the exposed external façade of
                      the building cannot exceed :
                     a) 15 metres in building height for lots with frontage to Serenity Close, Noosa Heads; or
                     b) 12 metres in building height on any other site.
               The applicant is proposing a building height of up to 12.6 metres and does not comply with AO5.2
               of the Hight Density Residential Zone Code. The proposal is therefore required to assessed against
               Performance Outcome PO5 of the High Density Residential Zone Code, which states:

               PO5 Buildings and structures:
                     a) are low rise and present a building height consistent with structures on adjoining and
                         surrounding premises;
                     b) are designed to provide an interesting streetscape and complement landform
                         changes and landscapes;
                     c) do not visually dominate the street or surrounding area;
                     d) respect the scale of existing vegetation, maintaining a vegetated skyline;
                     e) preserve the amenity of surrounding premises including privacy, views and access to
                         sunlight;
                     f) do not exceed three storeys , except for lots with frontage to Serenity Close, Noosa
                         Heads which do not exceed four storeys.
               Assessment
               The proposed development seeks a minor increase in building height above the 12 metre
               maximum as required under AO5.2. The exceedance occurs towards the eastern side of the
               building and includes architectural elements such as contained planters, stairs and handrails
               associated with the rooftop terraces.




                                         Figure 11 – Rooftop terrace height encroachments

               The building includes a substantial 13.2 metre front setback from Elanda Street and presents a
               narrower building façade when compared to other adjoining buildings. The proposed building does
               not dominate the street frontage with the areas of non-compliance not highly visible from publicly
               accessible areas around the building.
               The eastern rear elevation includes an under croft which ensures the eastern external façade does
               not exceed 12 metres.
               The proposal does not adversely impact neighbouring amenity, privacy, or access to sunlight and
               complies with PO5 of the High Density Residential Zone Code.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 12

               It is noted that the current proposal which has a height of RL 58.2 for the front façade to Elanda
               Street and a maximum roof top terrace pool height of RL 59.3 has a similar height to the original
               approval issued over the site in 2004.


               Basement
               Acceptable Outcome AO12 of the High Density Residential Zone Code states:

               AO12 Basements:
                 a)     are limited to one access a maximum of 6 metres wide; and
                 b)     do not encroach into building setback areas.

                 PO12    Basements:
                  a) visually integrate with the building;
                  b) do not dominate the street or building design;
                  c) area screened through landscaping; and
                  d) do not present as a storey to the street.


               Assessment
               Council raised concerns relating to the area of the basement within the northern and southern side
               setbacks and area of the basement above the ground level. The applicant submits:
               Parts of the basement level have been dropped to achieve consistency in the basement ceiling
               (3.5m high) and to reach NGL above. The basement area will be under the ground level along the
               southern side, and subsequently achieves more landscaping. The basement walls have further
               been stepped down where they interface with the pedestrian path.




                                               Figure 12 - Basement revisions to site cover
                       Information request response left and amended response plan on right received on 4 June 2025

               The shape and width of the basement has been determined by the requirement to include 10
               carparking (i.e. spaces and aisle) across the width of the site as shown in Figure 12. Figure 12
               indicates that the northern basement wall setback has been somewhat increased, making more
               area of the northern side boundary available for soft landscaping.
               The adjoining property directly to the north of the site at 47 Elanda Street also contains a driveway
               adjacent to this boundary and the relocation of the basement wall at this location enables a degree
               of soft/deep landscaping to occur between the sites and driveways.
               The revised plans demonstrate that the basement has been lowered such that it will not be visible
               from Elanda Street nor highly visible from publicly accessible pathways along the southern side of
               the site . The plans further clarify that the basement level will be reduced from RL 48.6 to RL 48.1
               and will be located below the lawfully established ground level.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 13

                                                           Figure 7 - Elevations
                       Information request response left and amended response plan on right received on 4 June 2025

               While the basement encroaches within the front 6.0 metre set back the basement is significantly
               below ground level and will not be visible from the street. The site frontage includes areas of soft
               landscaping which enables screening planting to assist with screening the visitor spaces and
               building behind.
               It is agreed that the basement visually integrates with the building form and will not be visible from
               Elanda Street or a highly visible or an obvious structure when seen from the public pedestrian
               walkway along the southern side of the site.
               The southern area of the basement will be integrated with both containerised and soft landscaping
               along its length and will not present as an additional storey even though ground levels across the
               site and along the southern boundary have been lawfully changed as a stepped topography as
               shown at Figure 7 (red shade areas).
               For the above reasons the proposed basement as shown complies with PO12 of the High Density
               residential zone code.


               Roof Top Terraces
               Acceptable Outcome AO15.2 of the High Density Residential Zone Code states:
               AO15.2         Development does not include rooftop terraces.
               The applicant is proposing two roof top terrace of approximately 90m² (Figure 8) and as such does
               not comply with AO15.2 of the High Density Residential Zone Code. The proposal is therefore
               required to comply with corresponding Performance Outcome PO16 of the Low Density Residential
               Zone Code, which states:
               PO15       Roof forms:
                 a. contribute positively to the character of the streetscape;
                 b. complement the character of the locality and the topography of the site;



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 14

                 c. avoid box profiles/parapets; and
                 d. do not create opportunities for overlooking the private open space or internal spaces of
                    neighbourhood properties.


               Assessment
               The proposed development contains two unroofed rooftop terraces accessed exclusively from
               Units 5 and 6. The design includes an open terrace area towards the building’s eastern extent
               (approximately 4.5 metres by 6 metres in dimension) and a plunge pool towards the buildings’
               western side. The eastern area of the roof top terrace will be setback approximately 3.3 metres
               from the northern side boundary.
               To improve privacy to adjoining sites, the terrace floor area and pool will be required to be setback
               a minimum 2.5 metres from the edge of the roof (currently 1.5 metres). This will enable the rooftop
               planters to be widened and also an increased side setback from 3.3 to 4.5 metres (See Fig 8).
               Additional screening landscaping along the northern side will also be conditioned to ensure
               overlooking between properties will be minimised.
               The roof terraces are framed with vegetation across the entire roof level. The roof will not present
               as a boxy profile and will integrate with the presentation of the roof when seen from neighbouring
               sites, ground level and street frontage.




                                                        Figure 8 – Northen roof top terrace



               Side setbacks - PO9 and AO9 of the High Density residential zone code

               Acceptable Outcome AO9.1 of the High Density Residential Zone Code states:
               AO9.1 Buildings and structures meet the following minimum boundary setbacks:
                      a)       for frontages:
                                       i.     First and second storeys - 6 metres
                                       ii.    third storey and thereafter - 10 metres
                          b)           for side boundaries -
                                       i.          1.5 metres setback up to 4.5 metres height;
                                       ii.         2 metres setback between 4.5 metres and 7.5 metres height; and
                                       iii.        2.5 metres plus 500 mm for every 3 metres above 7.5 metres height
                   c) Rear boundary




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 15

                      i.      First and second storeys - 6 metres
                      ii.              third storey and thereafter - 8 metres
               The applicant is proposing a range of side setbacks from 1.0 to 2.5 metres and as such does not
               comply with AO9.1 of the Low Density Residential Zone Code. The proposal is therefore required
               to comply with corresponding Performance Outcome PO9 of the High Density Residential Zone
               Code, which states:


               PO9          Buildings and structures are designed and sited to:
                             a) provide a high level of amenity to users of the subject site and adjoining premises,
                                  including provision of visual and acoustic privacy;
                             b) not unreasonably obstruct views or cause overlooking of private open space or
                                  habitable areas of adjoining premises;
                             c) provide adequate distance from adjoining land uses;
                             d) preserve existing vegetation that will help buffer development;
                             e) allow for space and landscaping to be provided between buildings including
                                  adequate area at ground level for landscaping with trees, shrubs, outdoor living
                                  and utilities;
                             f) be consistent with the predominant character of the surrounding area; and
                             g) protect the natural character and avoid adverse impacts on ecologically important
                                  areas such as national parks, waterways and wetlands.
               Assessment
               The proposed side setback encroachments are highlighted in Figure 9 (yellow shade).
               The Applicant submits that:
               The proposed setback encroachments are best shown on the Isometric -Setbacks/Encroachment
               and Section Plans. The proposed front basement setback will not be visible from the street.




                                              Figure 13 – Side setback encroachments looking west



               The encroachments shown at the left side of Figure 13 relate to the southern elevation which fronts
               the 3.6 metre wide pedestrian pathway. Based on the areas of encroachment, combined with the
               width of the pedestrian pathway, the proposal will not unreasonably obstruct views or overlook
               private open spaces to adjoining developments to the south of the site.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 16

               Encroachments shown on the right side of Figure 13, interface to the adjoining northern property
               at 47 Elanda Street. Existing development at this site includes a ground and first floor setback of
               2.5 metres increasing to 4.3 metres for levels two and three (see Figure 10). Of relevance is the
               level 2 external balcony which runs in an east /west direction along the southern side boundary.
               It is reasonable to request amended plans to;
                 - remove an external blade wall from Unit 3 to improve the setback non-compliance at this level;
                 - increase the side setback of the external northern contained planters for Unit 5 from 1.5 to 2.0
                   metres (2.5 metres compliance);
                 - at the roof terrace level, increase the side setback of the external northern container planters
                   from 2.0 to 2.5 metres (3.0 metres compliance) to assist with reducing the volume and bulk of
                   the building elevation facing the 47 Elanda Street southern elevation; and
                 - an increase in screening width of 3.5 metres for the Ground floor Unti 1 to maintain privacy
                   between premises.




                                              Figure 10 - Side setbacks 47 Elanda Street




               Design – PO7 and AO7 of the Coastal Communities local plan code




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 17

               The Coastal communities local plan code support buildings and structures which are consistent
               with the ‘beachside character’ of the local plan. Relevant acceptable outcomes support visible roof
               forms which are not concealed behind parapets and do not contain rooftop terraces. Colour
               schemes should include understated colours with low reflective roofing and cladding materials.
               PO7        Buildings, structures and landscaping are consistent with and reflect the beachside
                          character of the local plan area in terms of form, composition and use of materials.
               AO7.5 Buildings are designed to:
                      a)      suit the local subtropical climate;
                      b)      incorporate a mix of lightweight and textured external building materials,
                       including timber finishes with variation provided in texture, detailing and articulation;
                      c)      incorporate verandahs, open balconies with transparent or open balustrades
                       or shaded patios for outdoor living; and
                      d)      allow for landscape integrated with the buildings on site.
               Assessment
               The proposed development’s architecture incorporates a substantial proportion of the building
               material as glazing and coloured masonry finishes.
               While the proposed development could be argued not to incorporate a predominance of lightweight
               building materials as required under AO7.5 of the code, the building’s use of sculptural off form
               concreate and landscape treatments at each level of the building results in a subtropical
               presentation to all street frontages and site boundaries.


               5.     CONSULTATION
               5.1. Referral Agencies
               Not Applicable
               5.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •    Development Engineer, Development Assessment –
                    There are outstanding engineering issues that have not been sufficiently addressed.
                    Conceptually the design appears feasible, a preliminary operational works approval can be
                    issued. The proposed external frontage works were sent to the Assets team for review, who
                    were agreeable to the latest plans.
               •    Senior Environment Officer, Development Assessment
                    The application material includes engineering plans that show contiguous piling along the
                    northern and southern side boundaries. An area of natural ground has been provided along the
                    northern boundary between the boundary and the contiguous piles that varies in width for
                    planting in natural ground. Most of the landscape along the southern boundary will be on
                    podium.
                    Conditions have been provided for inclusion within the decision notice.
               •    Infrastructure Planning, Design & Delivery
                    Design Services would recommend conditioning stainless steel handrail in lieu of the existing
                    timber log barrier handrail. The applicants RPEQ engineer will sign off as required by the
                    ramp/stair design.
                    There is no external catchment flowing to the easement however surface flows falling on the
                    concrete path should still be shed off the path by introducing some crossfall. Suggest the
                    applicant provide 1-2% crossfall for the pathway sections uphill of the stairs to shed water to
                    the northern side. This would align well with existing surface inlet. Turf should be adequate
                    scour protection given the minimal flows but adding some plantings to slow down any flows
                    that do concentrate would be beneficial.




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 18

               6.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. In response to Council’s most recent request for increase to basement setbacks the
               Material Change of Use plans were changed however were not reflected in the Operational Works
               technical reporting and assessments.
               Therefore, it is recommended that the Material Change of Use be issued as a Development Permit
               with the updates to the technical reporting for Operational Works addressed as Preliminary
               approval until the outstanding engineering matters are updated.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No MCU24/0153 and OPW24/0202 for a Material Change of Use -
               Multiple Dwelling (6 x small dwelling) and Operational Works – Roadworks, Stormwater,
               Landscaping and Earthworks situated at 51 Elanda St Sunshine Beach Qld 4567 and described
               as Lot 403 RP 48112, it is recommended the application be approved in accordance with the
               following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:              MCU24/0153 & OPW24/0202

                   Street address:              51 Elanda St Sunshine Beach Qld 4567

                   Real property description:   Lot 403 RP 48112

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit Material Change of Use - Multiple dwelling (6 x small dwellings);
               •       Preliminary Approval for Operational Works – Roadworks, Stormwater, Landscaping and
                       Earthworks.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                           DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU24/0153)
               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.
                       Currency Period
               2.      This development approval lapses if the use has not happened by 11 August 2031, unless
                       an application to extend the currency period is approved by Council.




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 19

                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the tables below. The plans must be amended to incorporate
                      the amendments listed within the table below and resubmitted to Council prior to the issue
                      of any Development Permit for Operational Works*.

                         Plan No.       Rev.         Plan/Document Name                           Date

                         -                -          -                                            -

                      The following plans require amendment.

                         Plan No.             Rev.    Plan/Document Name                          Date

                         08                   C       Site Plan prepared by Archend               01.06.205

                                              C       Site Plan – landscaping areas prepared by 01.06.205
                                                      Archend

                         15                   C       Floor Plan – Basement prepared by 01.06.205
                                                      Archend

                         16                   C       General Arrangement - Ground Floor 01.06.205
                                                      prepared by Archend

                         17                   C       Floor Plan - Level 1 prepared by Archend    01.06.205

                         18                   C       Floor Plan - Level 2 prepared by Archend    01.06.205

                         23                   C       North Elevation - prepared by Archend       01.06.205

                         24                   C       South Elevation - prepared by Archend       01.06.205

                         25                   C       West and East Elevation - prepared by 01.06.205
                                                      Archend

                         26                   C       Section A - prepared by Archend             01.06.205

                         27                   C       Section A2 - prepared by Archend            01.06.205

                         28                   C       Section B & B2 - prepared by Archend        01.06.205

                         19                   C       Floor Plan – Roof - prepared by Archend     01.06.205

                         Amendments           Plot ratio
                                              1) Reduce the development’s plot ratio to achieve a 0:75:1 / total
                                                 gross floor area no greater than 565.7m2. The laundry areas in
                                                 Unit 1 and 2 and kitchen areas in Units 3 - 6 are to be included
                                                 in gross floor area calculations

                                              Building Setbacks
                                              2) Unit 1 - Courtyard screening is to be increase to 3.5 metres in
                                                 length along northern alignment;
                                              3) Unit 3 - Northern external curved blade wall outside Bed 3 and
                                                 Living and dining area is to be removed.




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 20

                                              4) Unit 5 - the ‘garden bed’ along the northern side setback to be
                                                 increased to 2.0 metres.

                                              Building Height
                                              5) Provide revised plans reduce the building height to 12 metres
                                                 above ground level, except where relating to minor elements i.e.,
                                                 part of balustrade on rooftop terrace.

                                              Rooftop Terrace
                                              6) Unit 5’s rooftop terrace platform is to achieve a minimum setback
                                                 of 2.5 metres (this includes the pool, terrace and planter box).

                      *(Refer to Advisory Note)
                      Nature and Extent of Approved Use
               4.     The approved development consists of Multiple Dwelling (6 x small dwellings).
                      Building Height
               5.     The maximum height of the development must not exceed 12.0 metres above ground level,
                      except where shown on the Approved Plans.
               6.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that the building does not exceed the maximum height requirement of this Decision
                      Notice.
                      Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
                      Street Identification
               8.     The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
               9.     The entrance to the building and lift must be clearly visible and discernible from the visitor
                      car parks by the provision of a directional sign where appropriate.
                      Building Appearance
               10.    External design features, materials and finishes must be as shown on the Approved Plans,
                      with no inclusions or alterations made without approval in writing by Council.
               11.    The ‘open balcony’ areas shown for Units 3,4 5 and fronting Elanda Street are not to be fully
                      screened and are to remain open above balustrade height or 1.2 metres above slab level.
               12.    External finishes of the building must be a mix of lightweight and textured external finishes,
                      with masonry areas incorporating a variety of textured finishes to break up the surface.
               13.    All deck and balcony areas must not be enclosed with shutters, louvres, glass panelling or
                      the like thus remaining as open structures, except where required to satisfy any privacy
                      condition of this Decision Notice.
               14.    External colours and finishes must be of an understated colour scheme and low-reflective
                      roofing and cladding materials.
               15.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.



Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 21

               16.    Waste storage areas, clothes drying areas and external storage areas must be screened
                      from view of the street.
                      Protection of Privacy
               17.    The upper level balconies located on the eastern elevation of Units 3-6 must include either
                      balcony planter boxes, balustrading or fixed external screens, positioned in such a way to
                      obscure direct views into the habitable room windows or private open space areas of the
                      adjoining property. Any fixed external screen(s) must not extend more than 50% of the length
                      of the balcony.
                      Water & Sewer Connections
               18.    An underground connection to reticulated water and sewerage must be provided to the
                      premises in accordance with the standards and requirements of Northern SEQ Distributor–
                      Retailer Authority (Unitywater).
               19.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the premises.
                      Noise – Services and Pool Equipment
               20.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration
                                  i.   7am to 10pm: Maximum level allowable = background + 5dB(A)
                                 ii.   10pm to 7am: Maximum level allowable = background + 3dB(A)
                      b.      Pumps, Service Room
                                  i.   7am to 7pm: Maximum level allowable = background + 5dB(A)
                                 ii.   7pm to 10pm: Maximum level allowable = background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
               21.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies and with the requirements of this Decision Notice.
                      External Works
               22.    Elanda Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      construction of kerb and channelling to the development side only
                      b.      widening and sealing of the existing road pavement to the centreline of Elanda Street.
                      c.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice
                      d.      relocation of the existing overhead electricity pole
                      e.      removal of the existing property access and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed
                      Condition 22 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Site Access and Driveways
               23.    A sealed access driveway must be provided from Elanda Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must include in particular:




Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 22

                      a.      Dimensions and grades generally in accordance with Council standard drawings RS-
                              049 and RS-050.
                      b.      safety measures, including warning signage, to improve driver awareness of
                              pedestrians and enhance pedestrian safety. Warning signage must be provided near
                              the exit ramp from the underground parking area to warn motorists of pedestrian
                              movement along the frontage street
                      Car Parking
               24.    A minimum of 12 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      2 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities;
               25.    Directional signage must be provided to direct visitors to the car parking spaces provided on
                      site.
                      Paving Treatment of Vehicle Movement Areas
               26.    Alternative materials, patterns, or threshold treatments must be used to articulate the
                      pavement treatment of vehicle movement areas.
                      Pedestrian and Bicycle Facilities
               27.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      A 1.5 metre wide footpath within the road verge for the entire length of the site’s
                              frontage to Elanda Street
                      Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               28.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      Post-development peak flow rates must not exceed pre-development peak flow rates
                              up to a 1% AEP event, accounting for climate change and incorporating appropriate
                              detention measures
                      Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               29.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               30.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Geotechnical Stability
               31.    All works must be carried out in accordance with the recommendations contained in the
                      Proposed Unit Development report prepared by Tectonic listed within this Decision Notice.



                                                                                                       Page 22 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 23

                      Earthworks and Retaining Walls
               32.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               33.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               34.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Landscaping Works
               35.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      the works shown on the reference plans.
                      b.      The area between the southern boundary and the proposed footpath, landings, and
                              stairs must be landscaped. The works must include the provision of tall tree species
                              capable of growing to a minimum of 5 metres tall, to assist in softening the built form
                              of the development when viewed from neighbouring properties and Councils footpath.
                      c.      Landscaping plans that substitute Nandina domestica for a variety of shrubs from the
                              Noosa Plan 2020 PSP 2 – Landscape.
                      d.      The area between the swimming pool and rear fence is to be screened by a 3.5 metre
                              wide buffer densely planted with trees and shrubs.
                      e.      Landscape plans that incorporate additional trailing vines that can achieve the
                              architectural intent of the submitted renders.
                      f.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      g.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
               36.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               37.    The existing trees located within neighbouring properties must be assessed by a qualified
                      person* and retained and protected in accordance with an Arborist Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
               38.    All planting areas on the eaves must be planted and maintained at all times, with replacement
                      planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
               39.    All planting areas on the northern side of the Unit 5 - Roof terrace is to contain suitable dense
                      screening and landscaping to ensure a minimum height of 2.0 metres. The landscaping is
                      to ensure overlooking is minimised and visual privacy is maintained to adjacent roof terraces
                      and private open spaces.
                      Waste Management
               40.    A waste storage area must be designed and maintained in accordance with Planning
                      Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
                      The waste storage area must be:

                                                                                                       Page 23 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 24

                      a.      imperviously paved and correctly sized for all refuse and recycling containers;
                      b.      bunded and graded so that wastewater and bin leakage drain to the sewer;
                      c.      provided with a conveniently located hosecock and backflow prevention device,
                              connected to a water supply to service the area; and
                      d.      roofed or otherwise covered.
                      Community Management Statement
               41.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               42.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and must include the following additional
                      clauses:
                      a.      The dwelling units are not permitted to be used for short term accommodation, unless
                              where identified as accepted development by the Noosa Plan or where there is a
                              Development Permit for Material Change of Use for Short Term Accommodation in
                              effect. Short term accommodation means the use of the premises for providing
                              accommodation of less than 3 consecutive months to tourists or travellers.




                                                                                                      Page 24 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 25

                        PRELIMINARY APPROVAL FOR OPERATIONAL WORKS (OPW24/0202)
               1.     Amended plans and associated reports must be submitted to Council prior to any further
                      development applications being made and must include the following to the reasonable
                      satisfaction of the Manager, Development Assessment:
                      1.1. Provide updated stormwater and engineering drawings including:
                              a.       Additional detail demonstrating that the post-development peak flow rate
                                       discharging to structure “7/1” does not exceed the pre-development peak flow
                                       rate. The detail must clearly demonstrate that the development and calculations
                                       incorporate appropriate climate change allowances in accordance with AO2.4 of
                                       the Water Quality and Drainage Code.
                              b.       Additional detail confirming an appropriate climate change allowance has been
                                       applied to the sizing of all detention tanks.
                              c.       A stormwater design calculation table.
                              d.       Details of detention outlet orifices / controls.
                              e.       Engineering documentation showing the materials, stair treatment and handrails
                                       along the pedestrian pathway adjacent to the southern frontage;
                              f.       Prepared by a suitably qualified person (RPEQ)
                      1.2. Provide updated access drawings/documents including:
                              a.       Appropriate manoeuvring areas for access to the car stackers in accordance with
                                       AS2890.1:2004 and the manufacturers specifications.
                              b.       Linemarkings for the car stackers.
                              c.       Prepared by a suitably qualified person (RPEQ).
               Currency Period
               2.     This development approval lapses if the requirements of the conditions have not been
                      completed and lodged with Council by 11 August 2027, unless an application to extend the
                      currency period is approved by Council.
               5.     REFERENCE DOCUMENTS

                Plan No.        Rev.       Plan/Document Name                                     Date

                Material Change of Use

                24265-          0          Proposed Unit Development prepared by Tectonic         30/09/2024
                001

                LD1             D          General Notes, Sheet Layout & Site Location 21/03/25
                                           prepared by Anembo Consultants

                LD2             D          Project Specifications      prepared     by    Anembo 21/03/25
                                           Consultants

                LD3             D          Project Specifications, Annual Maintenance & 21/03/25
                                           Finishes Schedule prepared by Anembo
                                           Consultants

                LD4             D          Plant Schedules prepared by Anembo Consultants 21/03/25

                LD5             D          Typical Details prepared by Anembo Consultants         21/03/25


                                                                                                         Page 25 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 26

                LP1             D       Landscape Plan (Ground 1/2) prepared by 21/03/25
                                        Anembo Consultants

                LP2             D       Landscape Plan (Ground 2/2) prepared by 21/03/25
                                        Anembo Consultants

                LP3             D       Landscape Plan (First Level) prepared by Anembo 21/03/25
                                        Consultants

                LP4             D       Landscape Plan (Second Floor) prepared by 21/03/25
                                        Anembo Consultants

                LP5             D       Landscape Plan (Roof) prepared by Anembo 21/03/25
                                        Consultants


               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               MATERIAL CHANGE OF USE
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                          a.    the Disability Discrimination Act 1992 (Commonwealth);
                          b.    the Anti-Discrimination Act 1991 (Queensland); and
                          c.    the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.




                                                                                                           Page 26 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 27

                      Advertising Devices
               4.     All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to being
                      installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
                      prohibited from being erected in the Shire.
                      Infrastructure Charges
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Performance Bond Agreement
               6.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
                      Submission of Amended Plans Required
               7.     The conditions of this Decision Notice require resubmission of plans to Council with
                      amendments. Please address the amended plan/s to Council’s Development Assessment
                      Branch with the Reference No. MCU24/0106 & OPW24/0202.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               8.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Qualified Person
               9.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                      b.      has a degree in civil engineering or engineering geology; and
                      c.      has a minimum of 5 years experience in the field of geotechnical engineering or
                              engineering geology.
                      Co-ordination of Operational Works Assessment
               10.    Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               11.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Safley managing pedestrian traffic on all adjacent footpaths
                      b.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      c.      provision for safe pedestrian access across the frontage of the site both during daily
                              construction and after daily construction has ceased.
                      Road Reserve Permit



                                                                                                      Page 27 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Page 28

               12.    This development permit provides the applicant with written authority to undertake the
                      development in accordance with the conditions. Any additional activities that are undertaken
                      inside Council’s road reserve for the purpose of acting on this development permit may
                      require a Road Reserve Permit. These additional activities may include, but are not limited
                      to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
                      Permit, or for more information, Contact Council’s Road Reserve Officer at
                      [email protected] Act 2014 – Fire Ant Control
               13.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Operational Works         Road Work, Drainage Work, Stormwater,
                                                                 Earthworks, Car Parking & Landscaping

                Development Permit for Building Works            All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                     Page 28 of 28

Document Set ID: 23409043
Version: 7, Version Date: 18/08/2025

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU24 0153 & OPW24 0202 (As Published).pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.