NOOSA COUNCIL IDAS Development Application Decision Notice                                                   11 of 15


Defence also recommends that owners or occupiers of potentially affected land and workers and contractors
employed on the land need to be aware of the procedure if a suspect object is found.

As the EPA has no record of the site being further investigated or remediated, it is considered that there remains a
possibility of UXO being found on it.

4       Conditions
The following concurrence agency conditions are to be attached to any approval:

4.1       Prior to the commencement of any development-related excavation, earthworks or soil disturbance, that
          part of the site to be so worked is to be subjected to investigation and, where necessary, appropriate
          remedial action.

4.2       Any person employed to work on any part of the site where Condition 4.1 has not been satisfied is to be
          forewarned in writing by the applicant.

          This warning is to explain that information available to the EPA indicates a potential for residual UXO
          exists on the site and work should proceed with due caution. It is to state the procedure to be followed
          by any person finding an object suspected of being explosive ordnance or component thereof:

             Do not disturb the object.
             Take action, where appropriate, to prevent it being disturbed by another person.
             Note its approximate dimensions and general appearance.
             Note the route to its location.
             Advise the Police as soon as possible.

4.3       Following investigation and any remedial action taken to satisfy Condition 4.1 above, the applicant is to
          submit a report, prepared in accordance with current guidelines, to the EPA for assessment. The EPA is
          to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4.1
          being satisfied.

4.4       No gravel, rock, sand or soil is to be removed from the site without written EPA approval.

4.5       The applicant is to advise the owner and any occupier of the site of the above responsibilities.

5       Additional comments or advice

Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence website
http://www.defence.gov.au/uxo for the details of current UXO investigation and remedial search
contractors. The EPA accepts reports based on investigative and remedial work carried out by these contractors.

Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search programs with
detection equipment unless the use of such equipment is:

    considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or,
      conversely, of any filling proposed as part of the development program; or
    prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal waste.

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For example,
where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or natural barrier,
issuance of the standard UXO warning (see Condition 4.2) may suffice while the structure, stockpile or barrier
remains in place. Where a structure is to be removed or reduced as part of the development program, protective
precautions, commensurate with any greater risk to which workers might then be exposed, may need to be
considered. Progressive assessment will be necessary where such circumstances exist. Unless, at the
completion of preliminary works, there is evidence then available to the UXO contractor that any residual risk is
negligible, the use of detection equipment will typically be required to confirm the site’s status.

Where investigation, along with any subsequent remedial action and assessment, is to be implemented by stages
to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be submitted by the applicant to the
EPA along with a management plan for the proposed work. Staged investigation/remediation is most likely to be
applicable where development of smaller, built-on lots (which can present circumstances such as those discussed
above) or broadhectare sites is proposed. In such cases, the EPA’s assessment of the report and advice to Council
in regard to approval of the development will be dependent on agreement with the management plan.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@d807e1ca\@[email protected]

Used in these records

About this file

File size
83 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2005.00002302.001 [As Published].pdf · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.