Site Stability
48.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or lands, and make recommendations on the type of foundation system(s)
       best suited for the proposed development. The recommendations of this report shall be incorporated into
       the design and construction of the proposed development.
Erosion and Sediment Control
49.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
       to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
50.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works that will become Council infrastructure, which shall be submitted in
       conjunction with an application for a Development Permit for Operational Works. In this regard a
       DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
       with any application for Operational Works.

51.    Digital detailed design drawings and calculations shall be submitted with any application for a
       Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
       design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
       Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
       existing and proposed services required by the development shall be shown on the plans.

52.    To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
       in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
       available at www.adac.com.au).

53.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

54.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

55.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.

56.    As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
       intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
       and structures. All of which shall be submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage structures,
       finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
       As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
       www.adac.com.au).
       Approval of works shall not be granted until all As Constructed information has been supplied and
       accepted by Council.
Building Services
57.    Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as amended)
       and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the
       pool enclosure is not permitted.
Environmental Health
58.    A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme Policy “Waste
       Management Multi-Dwellings and Commercial and Industrial Premises”, shall be submitted for the
       demolition and construction phases of the development and approved by Council’s Environmental Health
       Section prior to the issue of the development permit for operational works. The Plan shall contain the
       following information:




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@d807e1ca\@[email protected]

Used in these records

About this file

File size
83 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2005.00002302.001 [As Published].pdf · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.