Council archive · source document
132008.299.02 - Applicant's Response to InformationRequest
Applicant’s Response
A Revised Waste Management Plan has been prepared in response to Item 18 and is provided at Appendix G.
The revised WMP addresses each of the matters raised by Council, including:
• quantified estimates of general waste and recyclable waste generated by the proposed 102-bed
operation;
• identification of the existing and proposed waste storage arrangements at 14 and 16 Duke Street;
• the number, size and type of waste containers proposed;
• increased collection frequencies to provide sufficient capacity for the expanded operation;
• continued separation and collection of green waste and Containers for Change materials; and
• detailed bin movement and kerbside collection procedures designed to minimise impacts upon Duke
Street, pedestrian movement, on-street parking and adjoining properties.
The revised WMP identifies an estimated overall general waste requirement of approximately 4,488 litres per week
and recyclable waste requirement of approximately 1,020 litres per week. For the expanded 48-bed operation at
16 Duke Street, the proposed service provides 4 × 360 litre general waste bins collected twice weekly and 2 × 360
litre recycling bins collected weekly, providing capacity above the estimated waste generation for that component.
On-site bulk-bin collection has been considered but is not considered practical having regard to the site
configuration and vehicle manoeuvring constraints. Waste collection will therefore continue through the
established kerbside mobile-bin arrangement from Duke Street, without waste collection vehicles entering either
site.
This ends my client’s response to matters raised by Council within their Information Request.
In accordance with section 13.2(a) of the Development Assessment Rules, the applicant is providing all of the
information requested by Council. Accordingly, pursuant to section 14.1(a), the applicant’s response period ends
upon provision of this response.
The applicant now intends to proceed to public notification and will separately advise Council of the intended start
date of public notification in accordance with section 17.3 of the Development Assessment Rules.
Should you require any additional information or have any queries please to not hesitate to contact us.
Kind Regards,
Russell Green APIA MQELA
Managing Director
RG Strategic
PO Box 1818 0438 210 182
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132008.299.02 - Applicant's Response to InformationRequest.pdfRelated documentApplication case desk ↗
About this file
- File size
- 236 KB (small file)
- File type
No other editions are linked here.