Original source · versioned page text
Appendix A - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
20 WOONGAR ST, BOREEN POINT. NEW RESIDENCE LEGEND AR ARCHITRAVE AW AWNING BAL BALUSTRADE BAL 2 BALUSTRADE 2 C COLUMN CFC COMPRESSED FIBRE CEMENT CD 02 CHT CEILING HEIGHT 6000 01 CONC CONCRETE CONC EX CONCRETE EXPOSED AGG CPD CUPBOARD 1 DP DOWNPIPE DW DISHWASHER I E EXISTING (PREFIX) 2000 2000 2150 2150 1700 2000 2000 1500 EG EAVES GUTTER TREE EGL EXISTING GROUND LEVEL H FC FC SJ FIBRE CEMENT FIBRE CEMENT SET JOINTS FC BJ FIBRE CEMENT BUTT JOINTS/COVER STRIP G FFL FGL FINISHED FLOOR LEVEL FINISHED GROUND LEVEL FL FLASHING TREE F G HC GUTTER HOSE COCK E HR J HANDRAIL JOINT NEW LF LIGHT FITTING CD 02 2 RESIDENCE 1 CD 02 02 D FRONT VIEW MC MCR METAL CLADDING METAL COMPOSITE ROOFING 02 2 MR MRS MIRROR METAL ROOF SHEETING C MS N METAL SHEET NEW (PREFIX) NGL NATURAL GROUND LEVEL B OH P OVERHANG POST PB PLASTERBOARD A PLY SC PLYWOOD SHEET CLADDING 2 SHR SHOWER SK SKIRTING OUTLINE OF POSSIBLE AREA SLF SHELF CD 02 IN WHICH AES CAN BE LOCATED SW STORMWATER 01 SWP STORMWATER PIT EXISTING T TILES TS TIMBER SCREEN SHACK TB TIMBER 13115 TREE TANK T DK TIMBER DECKING T FB TIMBER FLOOR BOARDS TR TOWEL RAIL 20m2 MINIMUM AREA FOR AES BED TS TIMBER SCREEN WC TOILET TANK WM WASHING MACHINE EXISTING N CARPORT 1250 1175 1975 1250 2500 2500 500 1720 7 6 5 4 3 2 10 REAR VIEW DRAWING SCHEDULE 3 Sheet Number Sheet Name Current Revision Current Revision Date SITE PLAN CD 01 01 CD 01 02 SITE PLAN PLANS 6 6 27.02.23 27.02.23 1 CD 01 03 PLANS 1 01.11.21 1 : 200 CD 02 01 ELEVATIONS 5 27.02.23 CD 02 02 ELEVATIONS 5 27.02.23 CD 02 03 SECTIONS 6 27.02.23 27/02/2023 11:57:21 No. Issue Date Morrison Architecture 21002 ABN 53 168 077 450 3 Sketch Design 05.04.22 Project: Project number Dwg: SITE PLAN PO Box 263 Ashgrove 4 Sketch Design 03.05.22 20 Woongar St Date July 22 QLD 4060 5 Sketch Design 04.07.22 +61 410 402 514 Client: Drawn by MJM Dwg No: CD 01 01 Issue No: 6 [email protected] 6 Sketch Design 27.02.23 Juliette & Nick Cusack Checked by MJM Scale As indicated
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
1 1
3 3
CD 02 03 CD 02 03
CD 02 03 CD 02 03
303 303
710
I I
1500
DN DECK
H H
90
2000
1000mm HIGH WALL BED RM
G CPD G
4910
LIVING
2000
2182
BATH
3350 F RM F
1700
540 610 90
2 2
CD 02 03
KITCHEN CD 02 03
ROBE ROBE
E E
2150
2175 90 1710 90 3015 90
DINING BED RM 6
D D
13200
2150
1380
1010
SHR
13170
BATH C C
RM
SEAT
2000
CPD
1675
DECK
B B
2000
LAUNDRY
SHELVES
A
6
LANDSCAPE RETAINING
WALL & PAVING REQUIRED
7
TO GET GROUND UP TO A LEVEL 6 5 4 3 2 10
7 6 5 4 3 2 10 WHERE THERE IS ENOUGH
SPACE WITHIN SETBACK
GROUND LEVEL FOR THE STEPS LOWER LEVEL
1 2
1 : 100 1 : 100
27/02/2023 11:57:23
No. Issue Date
Morrison Architecture 21002
ABN 53 168 077 450 3 Sketch Design 05.04.22 Project: Project number Dwg: PLANS
PO Box 263 Ashgrove 4 Sketch Design 03.05.22 20 Woongar St Date July 22
QLD 4060 5 Sketch Design 04.07.22
+61 410 402 514 Client: Drawn by MJM Dwg No: CD 01 02
Issue No: 6
[email protected]
6 Sketch Design 27.02.23 Juliette & Nick Cusack Checked by Checker Scale 1 : 100
Page 3
0 4 7
1 2 3 5 6 7 6 5 4 3 2 10
ROOF ROOF
15750 15750
GROUND LEVEL GROUND LEVEL
13200 13200
5
LOWER LEVEL
10400
ELEVATION NORTH ELEVATION SOUTH
1 2
1 : 100 1 : 100
27/02/2023 11:57:24
No. Issue Date
Morrison Architecture 21002
ABN 53 168 077 450 2 Sketch Design 05.04.22 Project: Project number Dwg: ELEVATIONS
PO Box 263 Ashgrove 3 Sketch Design 03.05.22 20 Woongar St Date July 22
QLD 4060 4 Sketch Design 04.07.22
+61 410 402 514 Client: Drawn by MJM Dwg No: CD 02 01
Issue No: 5
[email protected]
5 Sketch Design 27.02.23 Juliette & Nick Cusack Checked by MJM Scale 1 : 100
Page 4
A B C D E F G H I
7.5m ABOVE EXISTING GL
5
5
4.5m ABOVE EXISTING GL
ROOF
15750
GROUND LEVEL
13200
LOWER LEVEL
5 10400
ELEVATION EAST
1
1 : 100
I H G F E D C B A
ROOF
5
15750
GROUND LEVEL
13200
LOWER LEVEL
10400
ELEVATION WEST
2
27/02/2023 11:57:25
1 : 100
No. Issue Date
Morrison Architecture 21002
ABN 53 168 077 450 2 Sketch Design 05.04.22 Project: Project number Dwg: ELEVATIONS
PO Box 263 Ashgrove 3 Sketch Design 03.05.22 20 Woongar St Date July 22
QLD 4060 4 Sketch Design 04.07.22
+61 410 402 514 Client: Drawn by MJM Dwg No: CD 02 02
Issue No: 5
[email protected]
5 Sketch Design 27.02.23 Juliette & Nick Cusack Checked by MJM Scale 1 : 100
Page 5
PM
OX
A B C D E F G H I
12
U IN
E
N
JU
EQ
22
6
N
SU
SUN 22 DEC 12PM
ROOF
15750
PM
12
E
J UN
22
DECK KITCHEN S UN GROUND LEVEL
13200
SECTION 1
1 7 6 5 4 3 2 10
1 : 100
BED RM LOWER LEVEL
10400
ROOF
15750
KITCHEN LIVING
GROUND LEVEL
13200
LOWER LEVEL
10400
SECTION 2
2
1 : 100
6600 6311 A B C D E F G H I
ROOF
15750
2500
FUTURE FUTURE L'DRY BATH BED RM LIVING RM
CARPORT BED RM
GROUND LEVEL
270
13200
6 BED RM
LOWER LEVEL
10400
SECTION 3
3
27/02/2023 11:57:26
1 : 100
No. Issue Date
Morrison Architecture 21002
ABN 53 168 077 450 3 Sketch Design 05.04.22 Project: Project number Dwg: SECTIONS
PO Box 263 Ashgrove 4 Sketch Design 03.05.22 20 Woongar St Date July 22
QLD 4060 5 Sketch Design 04.07.22
+61 410 402 514 Client: Drawn by MJM Dwg No: CD 02 03
Issue No: 6
[email protected]
6 Sketch Design 27.02.23 Juliette & Nick Cusack Checked by MJM Scale 1 : 100