Original source · versioned page text
Negotiated Decision Notice - MCU25 0094 (As Published)
Currency Period
2. The Currency Period for this development approval lapses if the use has not happened by
12 December 2031, unless an application to extend the currency period is approved by
Council.
Approved Plans
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Doc Set ID Version 1 Nature Based Tourism Elements 18/09/2025
24127544
01 - Proposed Site Plan prepared by Linea 7 August 2025
Design & Drafting
02 - Part Site Plan prepared by Linea Design & 7 August 2025
Drafting
03 - Proposed Dwelling - Plan prepared by 7 August 2025
Linea Design & Drafting
06 - North Elevation, West Elevation, South 7 August 2025
Elevation, East Elevation prepared by
Linea Design & Drafting
A1.1 A Floor Plans prepared by Aussie Tiny May 2023
Houses
A2.1 A Elevations prepared by Aussie Tiny May 2023
Houses
A2.2 A 3D Elevations prepared by Aussie Tiny May 2023
Houses
A3.1 A Sections prepared by Aussie Tiny Houses May 2023
A3.2 A Sections prepared by Aussie Tiny Houses May 2023
A3.3 A Sectional 3D Views prepared by Aussie May 2023
Tiny Houses
A7.5 A Deck (By Client) prepared by Aussie Tiny May 2023
Houses
Nature and Extent of Approved Use
4. The approved use comprises of Nature-based tourism in the form of two (2) cabins and one
(1) lodge.
5. The total number of guests accommodated at any one time must not exceed 8.
6. The approved cabins and lodge must not be occupied by persons for the purpose of
permanent accommodation, unless otherwise approved. The facilities must only be used as
part of the Nature-based Tourism use.
Page 2 of 7
Document Set ID: 24510815
Version: 4, Version Date: 03/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original