Original source · versioned page text
REC12/0010 Development Application part 1 CD with Letter, Application Forms and Plans
Sea) Specific Outcomes mitigate possible impacts on nearby residences or other noise sensitive uses. 012 For lots in the Rural Settlement Zone—a sealed access to the nearest urban settlement is available. Not applicable. _Water supply for fire fighting 013 An adequate and accessible water supply | is | fighting. ere is sufficient water available for fire rovided for fire fi ighting purposes. ‘Energy efficiency - ae 014 The street and lot orientation facilitates the construction of energy efficient buildings that respond to the local climate conditions. AND 015 For residential development, the subdivision design provides for the maximum practicable number of lots with house site areas that— a) maximise solar access to the north in winter; b) minimise solar access to the east and west in the summer; c) maximise access to any prevailing summer breezes; and da) minimise exposure to prevailing winter winds. The new lot layout has no impact upon the solar access or exposure to prevailing breezes of the houses. Infrastructure. nie 016 Each lot is capable of being serviced by appropriate levels of — a) water supply; b) reticulated sewerage; c) stormwater drainage; d) power supply; and e) — telecommunications; AND O17 The design and provision of public services and utilities, including sewerage, water, electricity, street lighting and telecommunication services— a) meets the needs of users; b) — ensures health, safety and convenience of the community; c) protects the natural environmental values of the site and surrounds, including visual amenity and native vegetation; d) are cost effective over their life cycte; e) minimises adverse impacts to the environment (including the amenity of the local area) in the short and long term; and f) ensures that the existing systems are upgraded or relocated to be capable of supporting the proposed development; AND 078 Essential public utilities are available and maintain their function during flood events up to a 1% AEP (1:100 year ARI) flood event. All lots have power and telephone services available. The proposal will require the re-location of the power and telephone services.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.