Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

REC12/0010 Development Application part 1 CD with Letter, Application Forms and Plans

of 48
Sea)

 

Specific Outcomes
mitigate possible impacts on nearby residences
or other noise sensitive uses.

 

012 For lots in the Rural Settlement Zone—a
sealed access to the nearest urban settlement is
available.

Not applicable.

 

_Water supply for fire fighting

 

 

013 An adequate and accessible water supply | is

| fighting.

ere is sufficient water available for fire

 

 

 

rovided for fire fi ighting purposes.
‘Energy efficiency - ae

 

 

 

014 The street and lot orientation facilitates the
construction of energy efficient buildings that
respond to the local climate conditions.

AND

015 For residential development, the

subdivision design provides for the maximum

practicable number of lots with house site areas

that—

a) maximise solar access to the north in
winter;

b) minimise solar access to the east and west
in the summer;

c) maximise access to any prevailing summer
breezes; and

da) minimise exposure to prevailing winter
winds.

The new lot layout has no impact upon the
solar access or exposure to prevailing
breezes of the houses.

 

 

 

 

 

 

 

 

 

 

Infrastructure.

 

 

 

 

nie

 

016 Each lot is capable of being serviced by

appropriate levels of —

a) water supply;

b) reticulated sewerage;

c) stormwater drainage;

d) power supply; and

e) — telecommunications;

AND

O17 The design and provision of public services

and utilities, including sewerage, water,

electricity, street lighting and telecommunication
services—

a) meets the needs of users;

b) — ensures health, safety and convenience of
the community;

c) protects the natural environmental values
of the site and surrounds, including visual
amenity and native vegetation;

d) are cost effective over their life cycte;

e) minimises adverse impacts to the
environment (including the amenity of the
local area) in the short and long term; and

f) ensures that the existing systems are
upgraded or relocated to be capable of
supporting the proposed development;

AND
078 Essential public utilities are available and

maintain their function during flood events up to a
1% AEP (1:100 year ARI) flood event.

 

All lots have power and telephone
services available.

The proposal will require the re-location of
the power and telephone services.

 

 

Log in to download the original (REC12_0010 Development Application part 1 CD with Letter, Application Forms and Plans.zip)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.