07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Integration of land use and public
transport ~

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requtation. -
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.

 

Railway palely: and efficiency: +
For more information ‘refer to Guide'23, schedule|

: 8A of the IPA:& schédule 2of the IP'Re ‘Regulation. .

Unless you answered “none of the above’, the
‘application triggers referral to QT as a
-Goncurrence agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

123.

OO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

CO (ii) reconfiguring a lot— :
(J (a) on land that is completely or partly within a a public transport corridor, and the
total number of lots increases;

((b) onland thatis completely or partly within a future public transport, corridor or
an airport's public safety area;

CJ (ec). on land that is within 400m of a public passenger transport facility or a afuture *

‘ public passenger transport facility, and the total site area is 5000m? or greater;

(1.(d) . for a residential purpose within the 25 ANEF contour for an airport;

C1: (e) for a residential purpose resulting in 100 or more allotments.

_ DD (iii) operational work assessable against the planning scheme, but not associated with a

material change of use mentioned in (i) above or reconfiguring a lot mentioned in (i)
above, on land that—

(2) (a) - is completely or partly within a public transport corridor or a future public
: transport corridor;
C1 (b)

will result in work that encroaches into an airport's operational airspace. _
Ww (iv) none of the above. ‘

The application involves: (tick the oppable box/es)-—
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that .
_, schedule. .
C1 (ii) reconfiguring a lot—

(1 (a) on tand that is completely or partly within a future public transport corridor,
: future railway land or a railway tunnel easement;

[J (b) on land that is within 400m of a Citytrain passenger railway station or a future

Citytrain passenger railway station, and the'total site area is 5000m? or:
/ greater;

(1c) on land that abuts rail corridor tand, commercial corridor land or future railway
tand, and ‘the total number of lots increases;

(1 (d)_— on land that abuts rail corridor land, commercial corridor land or future failway
land,and an easement abutting the corridor or future railway land is created;

L1(e) on land that is completely or partly within 100m of, and abutting an approach

: to, a railway level crossing, and the total number of lots increases;
[C1 (f) for a residential purpose resulting in 100 or more allotments.

L (ii) operational work assessable against the planning schéme, but not associated with a e
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—

C1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1) (b) is completely or partly within future railway land, or a railway tunnel easement;

[J (c) abuts rail corridor land, commercial corridor land or future railway land, and

: the work is within 25m of the railway boundary.
iv) none of the above.

 

Moonie to Brisbane pipeline .

For more information refer to schedule 2of the 1P
Requlation.

Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty.Ltd, for
advice.

 

24,

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and-involves: (tick the applicable box/es)— ,

(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

(2) (ii) reconfiguring a lot

LA (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a réconfiguring a fot, and the
work is focated wholly or partly in the easement.

tiv none of the above.

 

Page 8

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published].pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.